GEMINI HEIGHTS V

By VIKAS SRI DUTT SHARMA GEMINI

RG-MH-33582 · RERA P51600056314 · Last updated on MahaRERA portal: 18 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 5 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
4 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 70%
77 of 79Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

GEMINI HEIGHTS V is a Others project by VIKAS SRI DUTT SHARMA GEMINI in Nashik, Maharashtra, registered with MahaRERA as P51600056314 on 25 May 2024. Possession is promised by 31 Dec 2029. 2 of the 79 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.

At a glance

Project

  • NameGEMINI HEIGHTS V
  • TypeOthers
  • Location
    • PATHARDI ROAD
    • DHONGADE NAGAR MAUJE PATHARDI SHIWAR
    • Nashik (M Corp.)
    • Nashik
    • 422010
  • Pincode422010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600056314
  • ReraGenie IDRG-MH-33582

Builder

  • NameVIKAS SRI DUTT SHARMA GEMINI
  • Entity typeIndividual
  • Declared earlier projects4 →

Key dates

this monthRegisteredMay 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 May 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed61 files

Current status

3%2 of 79 units booked
40.9%Work done, per cost certificate

Figures as on 18 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GEMINI HEIGHTS V WING ANA9728634
GEMINI HEIGHTS V WING BNA9742345

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 70%.

GEMINI HEIGHTS V WING A34%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GEMINI HEIGHTS V WING B34%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed103

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots103
Closed/Covered103
BuildingClosed/CoveredTotal
GEMINI HEIGHTS V WING A3535
GEMINI HEIGHTS V WING B6868

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,422 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Sep 2025

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI5700.69
Proposed, not sanctioned5,699 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 005A and 005B GROUND FLOOR TOWER - A UNITECH CYBER PARK SECTOR - 39 GURGAON HARYANA 122001
Estimated costRs 10.93 cr
Cost incurredRs 4.47 cr
Work done40.9%
BuildingWingEstimatedIncurred
GEMINI HEIGHTS V WING ANARs 10.93 crRs 4.47 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAVI AMRUTKAR
EngineerRAVI AMRUTKAR
EngineerDELTACOM STRUCTURAL CONSULTANTS
Chartered AccountantAKGSR & COMPANY
Chartered AccountantS BALI & CO
Chartered AccountantAKGSR & CO
PartnerRole in project
VIKAS SRI DUTT SHARMA GEMINI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Sep 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Gemini Heights V From 1 Q4_07_04_2025.pdf18 Oct 2025
Withdrawal Update Form 2File: Gemini Heights V From 2 Q4_18_04_2025.pdf18 Oct 2025
Withdrawal Update Form 3File: Gemini Heights V From 3 Q4_JFM 25.pdf18 Oct 2025
Declaration and undertaking (Annexure A)File: Gemini Heights V Declaration Cum Undertaking 20032024.pdf23 Sep 2025
Commencement certificateFile: Gemini Heights V Commencment Certificate 25102023.pdf23 Sep 2025
Declaration and undertaking (Annexure A)File: Gemini Heights V Declaration Cum Undertaking 20032024.pdf23 Sep 2025
Form 1File: Gemini Heights V From 1 Q1_10_07_2024.pdf23 Sep 2025
Form 2File: Gemini Heights V From 2 Q1_12_07_2024.pdf23 Sep 2025
Form 3File: Gemini Heights V From 3 Q1_AMJ 24.pdf23 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Gemini Heights V_Wing AnB Q-1-AMJ-24.pdf23 Sep 2025
Form 1File: Gemini Heights V From 1 Q2_05_10_2024.pdf23 Sep 2025
Form 2File: Gemini Heights V From 2 Q2_10_10_2024.pdf23 Sep 2025
Form 3File: Gemini Heights V From 3 Q2_JAS 24.pdf23 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Gemini Heights V_Wing AnB Q-2-JAS-24.pdf23 Sep 2025
Form 1File: Gemini Heights V From 1 Q3_17_01_2025.pdf23 Sep 2025
Form 2File: Gemini Heights V From 2 Q3_20_01_2025.pdf23 Sep 2025
Form 3File: Gemini Heights V From 3 Q3_OND 24.pdf23 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Gemini Heights V_Wing AnB Q-3-OND-24.pdf23 Sep 2025
Form 1File: Gemini Heights V From 1 Q4_07_04_2025.pdf23 Sep 2025
Form 2File: Gemini Heights V From 2 Q4_18_04_2025.pdf23 Sep 2025
Form 3File: Gemini Heights V From 3 Q4_JFM 25.pdf23 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Gemini Heights V_Wing AnB Q-4-JFM-25.pdf23 Sep 2025
Withdrawal Update Form 1File: Gemini Heights V From 1 Q4_07_04_2025.pdf23 Sep 2025
Withdrawal Update Form 2File: Gemini Heights V From 2 Q4_18_04_2025.pdf23 Sep 2025
Withdrawal Update Form 3File: Gemini Heights V From 3 Q4_JFM 25.pdf23 Sep 2025
Form 5 (FY 2024-2025)File: Gemini Heights V From 5 22_05_2025.pdf23 Sep 2025
Layout approvalFile: Gemini Heights V IOD 4-4 22022024.pdf19 Apr 2024
Copy of Layout Approval (in case of layout)File: Gemini Heights V IOD 4-4 22022024.pdf19 Apr 2024
Other - LegalFile: Gemini Heights V Sale Deed R to 16 Index II.pdf19 Apr 2024
Other - LegalFile: Gemini Heights V Sale Deed 17 to 44.pdf19 Apr 2024
Other - LegalFile: Gemini Heights V Sale Deed 45 to 73 End.pdf19 Apr 2024
Other - LegalFile: Gemini Heights V 7_12 and Index II 08042024.pdf19 Apr 2024
Other - TechnicalFile: Gemini Heights V Declaration Cum Undertaking 20032024.pdf20 Mar 2024
Layout approvalFile: Gemini Heights V Layout 22022024.pdf19 Mar 2024
Building plan approvalFile: Gemini Heights V IOD 1-4 22022024.pdf19 Mar 2024
Building plan approvalFile: Gemini Heights V IOD 2-4 22022024.pdf19 Mar 2024
Building plan approvalFile: Gemini Heights V IOD 3-4 22022024.pdf19 Mar 2024
Building plan approvalFile: Gemini Heights V IOD 4-4 22022024.pdf19 Mar 2024
PAN CardFile: Vikas Gemini PAN Card 9032024.pdf19 Mar 2024
Copy of the legal title reportFile: Gemini Heights V Title Report n Format A PN 1 to 5 19032024.pdf19 Mar 2024
Copy of the legal title reportFile: Gemini Heights V Title Report n Format A PN 6 to END 19032024.pdf19 Mar 2024
Details of encumbrances concerned to FinanceFile: Gemini Heights V No Encumbrance Finance 15032024.pdf19 Mar 2024
Details of encumbrances concerned to FinanceFile: Gemini Heights V No Encumbrance Legal 20042024.pdf19 Mar 2024
Details of encumbrances concerned to LegalFile: Gemini Heights V No Encumbrance Finance 15032024.pdf19 Mar 2024
Details of encumbrances concerned to LegalFile: Gemini Heights V No Encumbrance Legal 20042024.pdf19 Mar 2024
Copy of Layout Approval (in case of layout)File: Gemini Heights V Layout 22022024.pdf19 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Gemini Heights V IOD 1-4 22022024.pdf19 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Gemini Heights V IOD 2-4 22022024.pdf19 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Gemini Heights V IOD 3-4 22022024.pdf19 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Gemini Heights V IOD 4-4 22022024.pdf19 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Gemini Heights V Commencment Certificate 25102023.pdf19 Mar 2024
Declaration about Commencement CertificateFile: Gemini Heights Format D 19032024.pdf19 Mar 2024
Declaration in FORM BFile: Gemini Heights V Form B 19032024.pdf19 Mar 2024
CERSAI detailsFile: Gemini Heights V CERSAI_Search_Report_200299500027_For_Asset_Based_Search_06_03_2024_18_1919 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gemini Heights V Form 3 19032024.pdf19 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Gemini Heights V Other Vikas Gemini 15032024.pdf19 Mar 2024
Proforma of Allotment letterFile: Gemini Heights V Allottment Letter 15032024.pdf19 Mar 2024
Proforma of Agreement for saleFile: Gemini Heights V Agreement Draft 18032024.pdf19 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Gemini Heights V Format A Bank 19032024.pdf19 Mar 2024
Deviation Report with respect to Allotment letterFile: Gemini Heights V Deviation for Allotment Letter 15032024.pdf19 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Gemini Heights V Deviation for Agreement For Sell 15032024.pdf19 Mar 2024

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
GEMINI HEIGHTS IV APARTMENTMAUJE PATHARDI - 1 SHIWAR NASHIK52-OngoingJan 2027Jan 2027
GEMINI HEIGHTS IV APARTMENTP51600033806MAUJE PATHARDI - 1 SHIWAR MURLIDHAR NAGAR PATHARDI PHATA NASHIK, Nashik-Mar 2022Certificate SignedJan 2027Mar 2023
GEMINI HEIGHTS IV APARTMENTP51600033806MAUJE PATHARDI - 1 SHIWAR MURLIDHAR NAGAR PATHARDI PHATA NASHIK, Nashik-Mar 2022CompletedJan 2027Mar 2023
GEMINI HEIGHTS III APARTMENTNEAR ANJANA LAWNS MAUJEPATHARDI SHIWAR47-CompletedDec 2024Jul 2021
GEMINI HEIGHTS IIMAUJE PATHARDI SHIWAR16-CompletedMar 2019Mar 2019

How this compares with Nashik

3%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GEMINI HEIGHTS V on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHONGADE NAGAR MAUJE PATHARDI SHIWAR4,100+ in Nashik

2 kmGEMINI HEIGHTS VCompleted 92Lapsed / revoked 16Other 64Dot size: filed unitsN

Filed coordinates, straight-line distance. 172 registered projects within 2 km.

Builder: VIKAS SRI DUTT SHARMA GEMINI

VIKAS SRI DUTT SHARMA GEMINI has 1 registration on MahaRERA, including GEMINI HEIGHTS V. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if GEMINI HEIGHTS V is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GEMINI HEIGHTS V?

The registered promoter entity is VIKAS SRI DUTT SHARMA GEMINI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GEMINI HEIGHTS V?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GEMINI HEIGHTS V?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GEMINI HEIGHTS V?

The professionals named in the filing: Architect: RAVI AMRUTKAR; Engineer: RAVI AMRUTKAR; Engineer: DELTACOM STRUCTURAL CONSULTANTS; Chartered Accountant: AKGSR & COMPANY; Chartered Accountant: S BALI & CO; Chartered Accountant: AKGSR & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GEMINI HEIGHTS V?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GEMINI HEIGHTS V. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GEMINI HEIGHTS V to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.