Home / Browse projects / Pune, Maharashtra / GATEWAY
GATEWAY
By RAICHANDANI CONSTRUCTIONS PRIVATE LIMITED
RG-MH-37158 · RERA P52100048395 · Last updated on MahaRERA portal: 20 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GATEWAY is a Commercial project by RAICHANDANI CONSTRUCTIONS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100048395 on 3 Jan 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 6 months from the original filing. 22 of the 29 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameGATEWAY
- TypeCommercial
- Location
- KHARADI
- Pune (M Corp.)
- Pune City
- Pune
- 411014
- Pincode411014
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100048395
- ReraGenie IDRG-MH-37158
Builder
- NameRAICHANDANI CONSTRUCTIONS PRIVATE LIMITED
- Entity typeCompany
- DirectorsANIL KUMAR DOULATRAM RAICHANDANI, DINESH PRAKASHLAL RAICHANDANI, KUNAL RAJKUMAR RAICHANDANI, SUNILKUMAR DOULATRAM RAICHANDANI, Deepak Doulatram Raichandani
- Other registrations6 more →
- Completed1 of 7
- No longer live3 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects5 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on3 Jan 2023
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 30 Dec 2025)
- Buildings1 building record
- Documents filed110 files
Current status
Figures as on 20 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GATEWAY | NA | 8 | 8 | 0 | 29 | 29 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.
GATEWAY: 83% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
Progress on shared amenities15
As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed104
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| GATEWAY | NA | Rs 19.50 cr | Rs 18.85 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Jay Aeram & Associates |
| Engineer | Laxman Ghatage |
| Engineer | DNA CONSULTANTS |
| Engineer | GANESH RAUT |
| Engineer | Siddharth Sawant |
| Chartered Accountant | Milani Gattani & Co |
| Chartered Accountant | PUSHPAK BOGATI |
| Chartered Accountant | Pushpa Bogati |
| Partner | Role in project |
|---|---|
| RAICHANDANI CONSTRUCTIONS PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to challenges beyond our control, including a significant shortage of skilled labour and delays in procurement of essential construction materials caused by supply chain disruptions, the process of constructions has been adversely impacted. Additionally, certain vendors failed to adhere to their committed delivery schedules, which affected the execution of key project activities. Despite our proactive efforts and planning, these constraints have created unavoidable delays in meeting our competition timeline. We kindly request MahaRERA to grant us a time extension for project completion unt
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed110
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Gateway Form 1 Q1 2026-27.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: Gateway Form 1 Q1 2026-27.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Gateway Form2 Q1 FY 2026-27 (1)_signed.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Gateway Form2 Q1 FY 2026-27 (1)_signed.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Gateway Form 3 Q1 2026-27.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Gateway Form 3 Q1 2026-27.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: Gateway Form 1 Q4 2025-2026.pdf | 27 Apr 2026 |
| Withdrawal Update Form 2File: Gateway form 2 Q4 2025-2026.pdf | 27 Apr 2026 |
| Withdrawal Update Form 3File: Gateway Form 3 Q4 2025-2026.pdf | 27 Apr 2026 |
| Withdrawal Update Form 1File: GATEWAY FORM 1 Q3.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: GATEWAY FORM 2 Q3.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: GATEWAY FORM 3 Q3.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: GATEWAY FORM 1.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: GATEWAY FORM 2_signed.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: Gateway (1) (1) (1).pdf | 18 Oct 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A GATEWAY.pdf | 16 Oct 2025 |
| Form 5 (FY 2024-2025)File: Gateway FY-2024-25.pdf | 30 Sep 2025 |
| Form 1File: GATEWAY FORM 1 Q4 2023-2024.pdf | 31 Jul 2025 |
| Form 2File: GATEWAY Q4 FORM 2 2023-2024.pdf | 31 Jul 2025 |
| Form 3File: GATEWAY FORM 3 Q4 2023-2024_compressed.pdf | 31 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: GATEWAY SOLD UNSOLD INVENTORY 31-03-24.pdf | 31 Jul 2025 |
| Withdrawal Update Form 1File: gateway form 1 Q1 2025-2026.pdf | 31 Jul 2025 |
| Withdrawal Update Form 2File: GATEWAY FORM 2 Q1 2025-2026_signed (2) (1).pdf | 31 Jul 2025 |
| Withdrawal Update Form 3File: Form-3 Gateway Jun-25 (1).pdf | 31 Jul 2025 |
| Form 1File: GATEWAY FORM1 01-07-23.pdf | 30 Jul 2025 |
| Form 2File: GATEWAY FORM2 20-07-23.pdf | 30 Jul 2025 |
| Form 3File: GATEWAY FORM3 03-08-23_compressed.pdf | 30 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: GATEWAY SOLD-UNSOLD INVENTORY 31-03-23.pdf | 30 Jul 2025 |
| Form 1File: GATEWAY FORM1 13-07-23.pdf | 30 Jul 2025 |
| Form 2File: GATEWAY FORM2 30-07-23.pdf | 30 Jul 2025 |
| Form 3File: GATEWAY FORM3 31-08-23.pdf | 30 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: GATEWAY SOLD-UNSOLD INVENTORY 30-06-23.pdf | 30 Jul 2025 |
| Form 1File: GATEWAY FORM1 03-10-23.pdf | 30 Jul 2025 |
| Form 2File: GATEWAY FORM2 05-10-23.pdf | 30 Jul 2025 |
| Form 3File: GATEWAY FORM3 20-10-23.pdf | 30 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: GATEWAY SOLD-UNSOLD INVENTORY 30-09-23.pdf | 30 Jul 2025 |
| Form 1File: GATEWAY FORM1 04-01-24.pdf | 30 Jul 2025 |
| Form 2File: GATEWAY FORM2 05-01-24.pdf | 30 Jul 2025 |
| Form 3File: GATEWAY FORM3 22-01-24.pdf | 30 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: GATEWAY SOLD-UNSOLD INVENTORY 31-12-23.pdf | 30 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GATEWAY FORM 1 Q4 2024-2025.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gateway form 3 Q4 2024-2025.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gateway Form 2 Q4 2024-2025.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: GATEWAY SOLD UNSOLD Q4 2024-2025.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GATEWAY FORM 3 Q3 2024-2025 S.pdf | 30 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GATEWAY FORM 2 Q3 2024-2025.pdf | 22 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Gateway Q3 Sold Unsold.pdf | 22 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gateway Q3 Form 1.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Scan2024-12-09_182338 Gateway.pdf | 9 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gateway_Form 3_Sep24s.pdf | 7 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gateway Form 1.pdf | 30 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gateway Form 2.pdf | 30 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Gateway Sold Unsold.pdf | 28 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gateway form 3 Q1 2024-2025.pdf | 22 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gateway Form 2 Q1 2024-25_compressed.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Gateway Sold Unsold Q1 2024-25.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RCPL - ARCHITECT CERTIFICATE GATEWAY Q1 2024-2025.pdf | 19 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: gateway sold unsold.pdf | 13 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RCPL GATEWAY Q4 MARCH 2023-2024.pdf | 11 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: Gateway Encumbrances.pdf | 20 May 2024 |
| Details of encumbrances concerned to FinanceFile: Gateway Encumbrances.pdf | 20 May 2024 |
| Details of encumbrances concerned to FinanceFile: Gateway Encumbrances.pdf | 20 May 2024 |
| Details of encumbrances concerned to LegalFile: Gateway Encumbrances.pdf | 20 May 2024 |
| Details of encumbrances concerned to LegalFile: Gateway Encumbrances.pdf | 20 May 2024 |
| Details of encumbrances concerned to LegalFile: Gateway Encumbrances.pdf | 20 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GATEWAY FORM 5 Q4 2023-2024_compressed.pdf | 24 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GATEWAY FORM 1 Q4 2023-2024.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GATEWAY Q4 FORM 2 2023-2024.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: gateway.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 q3 - gateway.pdf | 8 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 q3 - gateway.pdf | 8 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: sold booked q3 - gateway.pdf | 8 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022-23.pdf | 21 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed_compressed.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GATEWAY FORM 5 2022-2023.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Gateway Q2.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Gateway Q2.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Promoters Disclosure.pdf | 19 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE Q1 2023-2024.pdf | 8 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Q1 2023-2024.pdf | 8 Sep 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 110 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GATEWAY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KHARADI13,700+ in Pune
Filed coordinates, straight-line distance. 103 registered projects within 2 km.
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ Central Avenue
Vilas Javdekar Eco Homes
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Builder: RAICHANDANI CONSTRUCTIONS PRIVATE LIMITED
RAICHANDANI CONSTRUCTIONS PRIVATE LIMITED has 7 registrations on MahaRERA, including KESAR and Alpha C. Its filings disclose 5 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that GATEWAY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if GATEWAY is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GATEWAY?
The registered promoter entity is RAICHANDANI CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GATEWAY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GATEWAY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GATEWAY?
The professionals named in the filing: Architect: Jay Aeram & Associates; Engineer: Laxman Ghatage; Engineer: DNA CONSULTANTS; Engineer: GANESH RAUT; Engineer: Siddharth Sawant; Chartered Accountant: Milani Gattani & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GATEWAY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback