GANGA VASANT
RG-MH-16358 · RERA P52100027099 · Last updated on MahaRERA portal: 7 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 42 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GANGA VASANT is a Residential / Group Housing project by GANRAJ TOWNSHIP LLP in Pune, Maharashtra, registered with MahaRERA as P52100027099 on 13 Nov 2020. Possession is promised by 30 Jun 2028. The completion date has moved by 42 months from the original filing. 35 of the 112 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete.
At a glance
Project
- NameGANGA VASANT
- TypeResidential / Group Housing
- Location
- MAUJE AUTADE
- HANDEWADI
- Pune City
- Pune
- 411060
- Pincode411060
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100027099
- ReraGenie IDRG-MH-16358
Builder
- NameGANRAJ TOWNSHIP LLP
- Entity typePartnership
- PartnersRAHUL SURESHCHAND GARG, SUBHASH SITARAM GOEL, SURESHCHAND SUGANCHAND GARG, ROHIT SURESHCHAND GARG, ANURAG SUBHASH GOEL
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on13 Nov 2020
- Promised completion30 Jun 2028
- Revised completionRevised to 30 Jun 2028 (originally 30 Dec 2024)
- Buildings2 building records
- Documents filed129 files
Current status
Figures as on 7 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | NA | 8 | 7 | 56 | 0 | 56 |
| B | NA | 8 | 7 | 56 | 0 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 7 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 95%.
A38%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 25% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 7 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 75% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Yamunabai Parshuram Jadhav | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| B | NA | Rs 8.21 cr | Rs 8.21 cr |
| A | NA | Rs 2.93 cr | Rs 1.81 cr |
| - | NA | Rs 58.62 lakh | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MALWADKAR ARCHITECTS MALWADKAR |
| Engineer | RAJENDRA NESARGI |
| Engineer | NITIN TEMGIRE |
| Chartered Accountant | SHEETAL GADIYA |
| Chartered Accountant | MAHESH CHANDORKAR |
| Chartered Accountant | A W HATTARGE & CO |
| Partner | Role in project |
|---|---|
| GANRAJ TOWNSHIP LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. Project is 50% Completed 2. OC is received for B wing and Consent of 62.85 % is attached for the same, A wing is completely unsold 3. Revised Form B uploaded in other tab No. 1 and main Application. 4. Pert Chart for the remaining completion work is uploaded in Other Tab No. 2 and also in Other Technical Tab of Main Application. 5. QPR till date are updated. 6. Explanatory Note for Delay in project Completion Uploaded in other tab No. 3 7. Part OC of Wing B is uploaded in other techncial tab 2 as OC tab is only for Full OC.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Nov 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 May 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 May 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2028
Documents filed129
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 GANGA VASANT MAR 26.pdf | 7 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 GANGA VASANT MAR 26.pdf | 7 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 GANGA VASANT MAR 26.pdf | 7 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 GANGA VASANT SEP 25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 GANGA VASANT DEC 25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 GANGA VASANT DEC 25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 GANGA VASANT SEP 25.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 GANGA VASANT SEP 25.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 GANGA VASANT SEP 25.pdf | 15 Oct 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A GANGA VASANT 2024-25.pdf | 30 Sep 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 GANGA VASANT 2024-25.pdf | 30 Sep 2025 |
| Withdrawal Update Form 1File: FORM 1 GANGA VASANT JUN 25.pdf | 28 Jul 2025 |
| Withdrawal Update Form 2File: FORM 2 GANGA VASANT JUN 25.pdf | 28 Jul 2025 |
| Withdrawal Update Form 3File: FORM 3 GANGA VASANT JUN 25.pdf | 28 Jul 2025 |
| Form 1File: 10 Form 1 Arch Cert Ganga Vasant Mar 23.pdf | 16 Jul 2025 |
| Form 2File: 10 Form 2 Er Cert Ganga Vasant Mar 23.pdf | 16 Jul 2025 |
| Form 3File: 10 Form 3 CA Cert Ganga Vasant Mar 23.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 10 Disclosure Sold-Unsold Building Wise A Mar 23.pdf | 16 Jul 2025 |
| Form 1File: 11 Form 1 Arch Cert Ganga Vasant Jun 23.pdf | 16 Jul 2025 |
| Form 2File: 11 Form 2 Er Cert Ganga Vasant Jun 23.pdf | 16 Jul 2025 |
| Form 3File: 11 Form 3 CA Cert Ganga Vasant Jun 23.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 11 Disclosure Sold-Unsold Building Wise B Jun 23.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 12 Disclosure Sold-Unsold Building Wise A Sep 23.pdf | 16 Jul 2025 |
| Form 1File: 12 Form 1 Arch Cert Ganga Vasant Sep 23.pdf | 16 Jul 2025 |
| Form 2File: 12 Form 2 Er Cert Ganga Vasant Sep 23.pdf | 16 Jul 2025 |
| Form 3File: 12 Form 3 CA Cert Ganga Vasant Sep 23.pdf | 16 Jul 2025 |
| Form 3File: 13 Form 3 CA Cert Ganga Vasant Dec 23.pdf | 16 Jul 2025 |
| Form 2File: 13 Form 2 Er Cert Ganga Vasant Dec 23.pdf | 16 Jul 2025 |
| Form 1File: 13 Form 1 Arch Cert Ganga Vasant Dec 23.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 13 Disclosure Sold-Unsold Building Wise B Dec 23.pdf | 16 Jul 2025 |
| Form 1File: 14 Form 1 Arch Cert Ganga Vasant Mar 24.pdf | 16 Jul 2025 |
| Form 2File: 14 Form 2 Er Cert Ganga Vasant Mar 24.pdf | 16 Jul 2025 |
| Form 3File: 14 Form 3 CA Cert Ganga Vasant Mar 24.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 14 Disclosure Sold-Unsold Building Wise B Mar 24.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 15 Disclosure Sold-Unsold Building Wise B Jun 24.pdf | 16 Jul 2025 |
| Form 1File: 15 Form 1 Arch Cert Ganga Vasant Jun 24.pdf | 16 Jul 2025 |
| Form 2File: 15 Form 2 Er Cert Ganga Vasant Jun 24.pdf | 16 Jul 2025 |
| Form 3File: 15 Form 3 CA Cert Ganga Vasant Jun 24.pdf | 16 Jul 2025 |
| Form 3File: 16 Form 3 CA Cert Ganga Vasant Sep 24.pdf | 16 Jul 2025 |
| Form 1File: 16 Form 1 Arch Cert Ganga Vasant Sep 24.pdf | 16 Jul 2025 |
| Form 2File: 16 Form 2 Er Cert Ganga Vasant Sep 24.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 16 Disclosure Sold-Unsold Building Wise B Sep 24.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 17 Disclosure Sold-Unsold Building Wise B Dec 24.pdf | 16 Jul 2025 |
| Form 1File: 17 Form 1 Arch Cert Ganga Vasant Dec 24.pdf | 16 Jul 2025 |
| Form 2File: 17 Form 2 Er Cert Ganga Vasant Dec 24.pdf | 16 Jul 2025 |
| Form 3File: 17 Form 3 CA Cert Ganga Vasant Dec 24-2.pdf | 16 Jul 2025 |
| Form 1File: 18 Form 1 Arch Cert Ganga Vasant Mar 25.pdf | 16 Jul 2025 |
| Form 2File: 18 Form 2 Er Cert Ganga Vasant Mar 25.pdf | 16 Jul 2025 |
| Form 3File: 18 Form 3 CA Cert Ganga Vasant Mar 25-2.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 18 Disclosure Sold-Unsold Building Wise BA Mar 25-1.pdf | 16 Jul 2025 |
| Form 2A (FY 2020-2021)File: 2021 04 20 Form 2A Quality Certificate original field in RERA File.pdf | 16 Jul 2025 |
| Form 2A (FY 2021-2022)File: 2022 04 12 Form 2A Quality Certificate original field in RERA File.pdf | 16 Jul 2025 |
| Form 2A (FY 2022-2023)File: 2023 04 25 Form 2A Quality Certificate original field in RERA File.pdf | 16 Jul 2025 |
| Form 2A (FY 2023-2024)File: 2024 04 18 Form 2A Quality Certificate original field in RERA File.pdf | 16 Jul 2025 |
| Other - FinanceFile: Part OC B wing.pdf | 28 May 2025 |
| Other - TechnicalFile: Part OC B wing.pdf | 28 May 2025 |
| Layout approvalFile: 1-3.pdf | 24 May 2025 |
| Building plan approvalFile: 2-3.pdf | 24 May 2025 |
| Building plan approvalFile: 3-3.pdf | 24 May 2025 |
| Copy of Layout Approval (in case of layout)File: 1-3.pdf | 24 May 2025 |
| Declaration in FORM BFile: Form B Ganga Vasant.pdf | 24 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ganga Vasant Mar 23.pdf | 24 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ganga Vasant Jun 2023.pdf | 24 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ganga Vasant Sept 2023.pdf | 24 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ganga Vasant Dec 2023.pdf | 24 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ganga Vasant March 2024.pdf | 24 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ganga Vasant June 2024.pdf | 24 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Ganga Vasant Sep 2024.pdf | 24 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ganga Vasant Dec 2024.pdf | 24 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ganga Vasant Mar 2025.pdf | 24 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2-3.pdf | 24 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 3-3.pdf | 24 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold Ganga Vasant March 2023.pdf | 24 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Ganga Vasant June 2023.pdf | 24 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold Ganga Vasant Sep 2023.pdf | 24 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Ganga Vasant Dec 2023.pdf | 24 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Ganga Vasant March 2024.pdf | 24 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Ganga Vasant June 2024.pdf | 24 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Ganga Vasant Sep 2024.pdf | 24 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Ganga Vasant Dec 2024.pdf | 24 May 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 129 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GANGA VASANT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near HANDEWADI13,700+ in Pune
Filed coordinates, straight-line distance. 268 registered projects within 2 km.
THE SPECTRUM
SHRIRAM PROPERTIES LIMITED
GANGA MILLENNIA UNDRI BUILDING J,K,L,M AND N
GOEL GANGA INDIA PVT LTD
NYATI ESTEBAN II
NYATI REALTORS LLP
Lodha Pune NIBM Project
Lodha Developers Limited
KHUSH VISTA
Elated Housing LLP
The Atrium
Arhumashtika Life Spaces
Builder: GANRAJ TOWNSHIP LLP
GANRAJ TOWNSHIP LLP has 1 registration on MahaRERA, including GANGA VASANT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if GANGA VASANT is delayed beyond 30 Jun 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GANGA VASANT?
The registered promoter entity is GANRAJ TOWNSHIP LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GANGA VASANT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GANGA VASANT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GANGA VASANT?
The professionals named in the filing: Architect: MALWADKAR ARCHITECTS MALWADKAR; Engineer: RAJENDRA NESARGI; Engineer: NITIN TEMGIRE; Chartered Accountant: SHEETAL GADIYA; Chartered Accountant: MAHESH CHANDORKAR; Chartered Accountant: A W HATTARGE & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GANGA VASANT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.