Home / Browse projects / Pune, Maharashtra / GANGA SERIO E F BUILDING

Completed No litigation declared Residential / Group Housing project

GANGA SERIO E F BUILDING

By GOEL GANGA LANDMARKS LLP

RG-MH-15343 · RERA P52100023713 · Last updated on MahaRERA portal: 21 Feb 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 0%
2Complaints at MahaRERAon this registration
Jump to the 34 documents Report an error

GANGA SERIO E F BUILDING is a Residential / Group Housing project by GOEL GANGA LANDMARKS LLP in Pune, Maharashtra, registered with MahaRERA as P52100023713 on 2 Jan 2020. The registration is recorded completed; possession was promised by 30 Dec 2024. 2 complaints are on record with the regulator.

At a glance

Project

  • NameGANGA SERIO E F BUILDING
  • TypeResidential / Group Housing
  • Location
    • KHARADI
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100023713
  • ReraGenie IDRG-MH-15343

Builder

  • NameGOEL GANGA LANDMARKS LLP
  • Entity typePartnership
  • PartnersGOEL GANGA SPACE LLP through its Partner Agrim Goel, SWARANSINGH GYANSINGH SOHAL
  • Other registrations2 more →
  • Completed3 of 3

Key dates

this monthRegisteredJan 2020PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Jan 2020
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed34 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ENA290000
FNA290000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 0%.

E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed201

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots201
Closed/Covered201
BuildingClosed/CoveredTotal
E9696
F105105

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,298 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI15298.0
Proposed, not sanctioned15,298 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKotak Mahindra Bank Ltd M4 Virwani Plaza 11 East Street Pune Maharashtra 411 001

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR PRAMOD DESHPANDE
EngineerArun Patil
Chartered AccountantCA Sheetal Gadiya
PartnerRole in project
GOEL GANGA LANDMARKS LLP-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12500922Sachinkumar Prabhakar SahuGOEL GANGA LANDMARKS LLP17/03/2025
CC12501381Savita SharmaGOEL GANGA LANDMARKS LLP25/04/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Dec 2024

Documents filed34

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GGLLLP_Serio G_Architects Certificiate Q3.pdf21 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Architects Certificate on Completion of Project.pdf23 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC1.pdf23 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCC104124 _Esign by CDAC.pdf10 Dec 2024
Details of encumbrances concerned to FinanceFile: Encumbrance updation EF_30cr.pdf17 Oct 2023
Details of encumbrances concerned to LegalFile: Encumbrance updation EF_30cr.pdf17 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Ganga Serio E,F_2019.pdf13 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Ganga Serio E,F_2020.pdf13 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Ganga Serio E,F_2021.pdf13 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: GGLLLP_Serio EF_ Form 5 19-20.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: GGLLLP_Serio EF_ Form 5 20-21.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GGLLLP_Serio EF_Form 5 2022.pdf24 Jan 2023
Details of encumbrancesFile: Encumbrance updation EF.pdf1 Jun 2022
Layout approvalFile: 1-29 Layout.pdf21 Apr 2022
Copy of Layout Approval (in case of layout)File: 1-29 Layout.pdf21 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf21 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE-CC-0544-21-DATED-11-6-2021 (1).pdf18 Jun 2021
Proforma of Allotment letterFile: SERIO-AGREEMENT-VERSION-6-ADDITIONAL-18-6-2021.pdf18 Jun 2021
Proforma of Allotment letterFile: UNIT-AGR-BLANK-DRAFT-GANGA-SERIO-16-07-2020.pdf17 Jul 2020
Proforma of Allotment letterFile: RERA-UNIT AGREEMENT-GANGA SERIO EF.pdf23 Dec 2019
OtherFile: 16122-2019 - Deed of Conveyance-iNDEX.pdf23 Dec 2019
OtherFile: Shriniwas Liviano Phase I - Goel Ganga Landmarks LLP.pdf23 Dec 2019
OtherFile: Ganga Serio Letter0001.pdf23 Dec 2019
Copy of the legal title reportFile: TSR.pdf18 Dec 2019
Declaration in FORM BFile: FORM B Ganga Serio.pdf18 Dec 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert.pdf17 Dec 2019
Proforma of Allotment letterFile: ALLOTMENT-LETTER-RERA-Ganga Serio.pdf17 Dec 2019
Building plan approvalFile: 11.pdf14 Dec 2019
Layout approvalFile: 11.pdf14 Dec 2019
PAN CardFile: Goel Ganga Landmarks LLP PAN.pdf14 Dec 2019
Details of encumbrancesFile: Index II - Mortgage Deed - Charge.pdf14 Dec 2019
Copy of Layout Approval (in case of layout)File: 11.pdf14 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: 11.pdf14 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE-0550-29-05-2017.pdf14 Dec 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GANGA SERIO E F BUILDING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHARADI13,700+ in Pune

2 kmGANGA SERIO E F BUILDINGCompleted 119Lapsed / revoked 119Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 277 registered projects within 2 km.

Builder: GOEL GANGA LANDMARKS LLP

GOEL GANGA LANDMARKS LLP has 3 registrations on MahaRERA, including SHRINIWAS LIVIANO PHASE I and GANGA SERIO E F BUILDING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GANGA SERIO E F BUILDING is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GANGA SERIO E F BUILDING?

The registered promoter entity is GOEL GANGA LANDMARKS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GANGA SERIO E F BUILDING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GANGA SERIO E F BUILDING?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GANGA SERIO E F BUILDING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GANGA SERIO E F BUILDING?

The professionals named in the filing: Architect: AR PRAMOD DESHPANDE; Engineer: Arun Patil; Chartered Accountant: CA Sheetal Gadiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GANGA SERIO E F BUILDING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GANGA SERIO E F BUILDING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GANGA SERIO E F BUILDING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.