Home / Browse projects / Ganga Platino Building PQR

Completed No litigation declared Others project

Ganga Platino Building PQR

By GOEL EISHA CAPITAL

RG-MH-10885 · RERA P52100003874 · Last updated on MahaRERA portal: 25 Mar 2023

Source: official MahaRERA filing

Red flags

  • 6 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2018Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
6Complaints at MahaRERAon this registration
Jump to the 30 documents Report an error

Ganga Platino Building PQR is a Others project by GOEL EISHA CAPITAL in 411014, registered with MahaRERA as P52100003874 on 6 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2018. 6 complaints are on record with the regulator.

At a glance

Project

  • NameGanga Platino Building PQR
  • TypeOthers
  • Location
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100003874
  • ReraGenie IDRG-MH-10885

Builder

  • NameGOEL EISHA CAPITAL
  • Entity typePartnership
  • PartnersSUBHASH SITARAM GOEL, SOHAL CONSTRUCTIONS LLP NA, GG INFRASTRUCTURESAND LOGISTICS LLP NA
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017PromisedDec 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Aug 2017
  • Promised completion31 Dec 2018
  • Revised completionNone
  • Buildings3 building records
  • Documents filed30 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PNA230000
QNA240000
RNA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 25 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

P100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Q100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
R100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 25 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes90%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
OthersYes0%

Parking filed200

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots200
Closed/Covered200
BuildingClosed/CoveredTotal
P1717
Q6767
R116116

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,414 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
VIVA HIGHWAYS PRIVATE LIMITEDNashik (M Corp.)Nashik

Approvals and building plan

Permissible FSI18816.17
Proposed, not sanctioned17,355 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLaukik Apartments, Ground floor, Plot No 3 CTS No 870 Bhandarkar Road PUNE-411004

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAMOD DESHPANDE
EngineerDESIGN WORKZS ENGINEERING PVT LTD
PartnerRole in project
GOEL EISHA CAPITAL-

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC005000000010757Abhijit SabbanwarGOEL EISHA CAPITAL12/01/2018
CC005000000011581Pending Work, Invalid OC & Form 4, No consent for changes in original plan and other non-compliancesGOEL EISHA CAPITAL04/06/2018
CC005000000011597Delayed Possession, Invalid OC and Form 4, No consent for changes in Original PlanGOEL EISHA CAPITAL10/06/2018
CC005000000011614sunil shivram tanpureM/s. Goel Eisha Capitals08/06/2018
CC005000000011615swati sunil tanpureGoel Eisha Capitals08/06/2018
CC005000000106786Santosh Kamalaksha ShettySubhash Sitaram Goel17/04/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Feb 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Feb 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Feb 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Mar 2023

Documents filed30

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 4)File: Form 4 Architect Certificate PQR (1).pdf25 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate-Date-19-04-2018-PQR.pdf24 Mar 2023
Certificates of CA (Form 5)File: Self Declaration - Form 5 Platino PQR.pdf20 Nov 2018
Proforma of Allotment letterFile: P6927-RERA-UNIT AGREEMENT-GANGA PLATINO-PQR-PROJECT-1-COMMERCIAL-04-08-2018.pdf6 Aug 2018
Proforma of Allotment letterFile: P6927-RERA-UNIT AGREEMENT-GANGA PLATINO-PQR-PROJECT-1-DUPLEX-FLATS-REVISED-20-07-2018.pdf31 Jul 2018
Proforma of Allotment letterFile: P6927-RERA-UNIT AGREEMENT-GANGA PLATINO-PQR-PROJECT-1-REVISED-20-07-2018.pdf31 Jul 2018
Certificates of Architect (Form 4)File: Platino- P Build.pdf4 May 2018
Certificates of Architect (Form 4)File: Platino- Q Build.pdf4 May 2018
Certificates of Architect (Form 4)File: Platino-R Build.pdf4 May 2018
Certificates of Architect (Form 4)File: Completion Certificate - Ganga Platino PQR.pdf4 May 2018
Proforma of Allotment letterFile: P6927-RERA-UNIT AGREEMENT-GANGA PLATINO-PQR-PROJECT-1-REVISED-24-02-2018.pdf6 Mar 2018
Certificates of CA (Form 3)File: Ganga Platino PQR CA certificate 311217 (1).pdf5 Mar 2018
Copy of the legal title reportFile: Title Report Ganga Platino 160218.pdf16 Feb 2018
Layout approvalFile: layout.pdf15 Feb 2018
Copy of Layout Approval (in case of layout)File: layout.pdf15 Feb 2018
Commencement Certificates / NA Order for plotted developmentFile: CC 30012018.pdf15 Feb 2018
Layout approvalFile: Sanction Layout GEC1 1MB.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Sanction Layout GEC1 1MB.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC GEC 1MB.pdf31 Jul 2017
Proforma of Allotment letterFile: P Commercial Draft Agreement GEC 1MB.pdf31 Jul 2017
Proforma of Allotment letterFile: PQR Draft Agreement GEC.pdf31 Jul 2017
Certificates of CA (Form 3)File: PQR CA Cert GEC 1MB.pdf29 Jul 2017
Building plan approvalFile: IOD GEC 1MB.PDF27 Jul 2017
Building Plan Approval (IOD)File: IOD GEC 1MB.PDF27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PQR ER Certificate GEC 1MB.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arc Certificate PQR GEC 1MB.pdf26 Jul 2017
PAN CardFile: GEC PAN COPY.pdf24 Jul 2017
Copy of the legal title reportFile: Title.pdf23 Jul 2017
Details of encumbrancesFile: Index Mortgage Deed Phase 1 GEC.pdf23 Jul 2017
Declaration in FORM BFile: FORM B - GEC PHASE I.pdf23 Jul 2017

Keep Ganga Platino Building PQR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

2 kmGanga Platino Building PCompleted 46Lapsed / revoked 24Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 101 registered projects within 2 km.

Builder: GOEL EISHA CAPITAL

GOEL EISHA CAPITAL has 3 registrations on MahaRERA, including Ganga Platino Building PQR and Ganga Platino Building V commercial. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if Ganga Platino Building PQR is delayed beyond 31 Dec 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ganga Platino Building PQR?

The registered promoter entity is GOEL EISHA CAPITAL, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ganga Platino Building PQR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Ganga Platino Building PQR?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Ganga Platino Building PQR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ganga Platino Building PQR?

The professionals named in the filing: Architect: PRAMOD DESHPANDE; Engineer: DESIGN WORKZS ENGINEERING PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ganga Platino Building PQR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ganga Platino Building PQR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ganga Platino Building PQR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.