Home / Browse projects / Pune, Maharashtra / Ganga Fernhill phase 02
Ganga Fernhill phase 02
By MEENAMANI GANGA BUILDERS LLP
RG-MH-13168 · RERA P52100022705 · Last updated on MahaRERA portal: 7 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 6 cases
- 3 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
- Rs 50.00 crore secured on the land, in favour of PIRAMAL FINANCE LTD
- The declared charge does not appear in the CERSAI report on the filing
Clear
- Separate project account declared
- Allotment letter follows the model form
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Ganga Fernhill phase 02 is a Others project by MEENAMANI GANGA BUILDERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100022705 on 12 Oct 2019. Possession is promised by 30 Dec 2026. The completion date has moved by 12 months from the original filing. 186 of the 186 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameGanga Fernhill phase 02
- TypeOthers
- Location
- Undri
- Haveli
- Pune
- 411060
- Pincode411060
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100022705
- ReraGenie IDRG-MH-13168
Builder
- NameMEENAMANI GANGA BUILDERS LLP
- Entity typePartnership
- GSTIN27AAUFM6455H1ZN
- PartnerANNUJ UMESH GOEL
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 Oct 2019
- Promised completion30 Dec 2026
- Revised completionRevised to 30 Dec 2026 (originally 30 Dec 2025)
- Buildings2 building records
- Documents filed101 files
Current status
Figures as on 7 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C Building | NA | 14 | 14 | 83 | 0 | 83 |
| D Building | NA | 13 | 13 | 103 | 0 | 103 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 90%.
C Building87%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
D Building70%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 55% |
| Sanitary Fittings within the flats / premises | 45% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 35% |
Progress on shared amenities15
As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 30% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 30% |
| Street Lighting | Yes | 10% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed53
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| C Building | 25 | 25 |
| D Building | 28 | 28 |
Land and ownership4
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Anwar Hashmi | Pune (M Corp.) | Pune |
| Niranjan Batra | Pune (M Corp.) | Pune |
| Furniturewal's | Pune (M Corp.) | Pune |
| Sajid Furniturewala | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| C Building | NA | Rs 25.88 cr | Rs 25.88 cr |
| D Building | NA | Rs 21.37 cr | Rs 19.23 cr |
| - | NA | Rs 1.40 cr | Rs 98.00 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vilas Tarawadi |
| Architect | Ar Krishna Bhagat |
| Engineer | Shrikant Morajkar |
| Chartered Accountant | DMKH and Co |
| Partner | Role in project |
|---|---|
| MEENAMANI GANGA BUILDERS LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project timeline has been impact as promoter has a balance FSIand proposed the additional extra floor in D wing. For this proposal addition , it was necessary to revise the complete environmental Clearance (EC) application and obtain fresh approval for Overall layout.
Litigation declared6
| Case | Court | Status |
|---|---|---|
| 1707/2013 | Civil Judge Senior Division, Pune | Ongoing |
| 4502/2012 | Civil Judge Senior Division, Pune | Ongoing |
| 746/2021 | District and Sessions Judge, Pune | Ongoing |
| 1123/2024 | District and Session Judge, Pune | Ongoing |
| 4940/2024 | District and Sessions Judge, Pune | Ongoing |
| 975/2024 | District and Sessions Judge, Pune | Ongoing |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12600549 | Shubham Ashok Kharche | MEENAMANI GANGA BUILDERS LLP | 01/02/2026 |
| CC12602651 | Fatima Murtuza Pota | MEENAMANI GANGA BUILDERS LLP | 07/05/2026 |
| CC12602711 | Nivrutti Venkat Nadagude | MEENAMANI GANGA BUILDERS LLP | 09/05/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Aug 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Oct 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2026
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 7 May 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 7 May 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 7 May 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 7 May 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 7 May 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 7 May 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 6 Apr 2026 |
| Withdrawal Update Form 1File: Form1.pdf | 6 Apr 2026 |
| Withdrawal Update Form 1File: Form1.pdf | 6 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 6 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 6 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 6 Apr 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 6 Apr 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 6 Apr 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 6 Apr 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 4 Apr 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 4 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 4 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 4 Apr 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 4 Apr 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 4 Apr 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 30 Apr 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: C building Society formation certificat.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Fernhill Phase II.pdf | 17 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A ganga Ferhill Phase 2.pdf | 17 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Fernhill Phase II.pdf | 5 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganga Fernhill phase II.pdf | 5 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Fernhill Phase II.pdf | 5 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Fernhill Phase II.pdf | 5 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 24 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 24 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Fernhill II.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Fernhill II.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Form D fernhill II.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Fernhill II.pdf | 20 Jul 2024 |
| Layout approvalFile: 6-C-Building.pdf | 14 May 2024 |
| Layout approvalFile: 1-Layout.pdf | 14 May 2024 |
| Layout approvalFile: 7-C-Building.pdf | 14 May 2024 |
| Layout approvalFile: 8-C-Building.pdf | 14 May 2024 |
| Layout approvalFile: 9-D-Building.pdf | 14 May 2024 |
| Layout approvalFile: 9-D-Building.pdf | 14 May 2024 |
| Layout approvalFile: 10-D-Building.pdf | 14 May 2024 |
| Copy of Layout Approval (in case of layout)File: 6-C-Building.pdf | 14 May 2024 |
| Copy of Layout Approval (in case of layout)File: 1-Layout.pdf | 14 May 2024 |
| Copy of Layout Approval (in case of layout)File: 7-C-Building.pdf | 14 May 2024 |
| Copy of Layout Approval (in case of layout)File: 8-C-Building.pdf | 14 May 2024 |
| Copy of Layout Approval (in case of layout)File: 9-D-Building.pdf | 14 May 2024 |
| Copy of Layout Approval (in case of layout)File: 9-D-Building.pdf | 14 May 2024 |
| Copy of Layout Approval (in case of layout)File: 10-D-Building.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 23 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 23 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FERNHILL II.pdf | 21 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FERNHILL II.pdf | 21 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: FORM D FERNHILL II.pdf | 21 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 21 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 17 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Form D.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 17 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Form D.pdf | 30 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Form D.pdf | 30 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Form D.pdf | 30 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 27 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 27 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FOrm 1.pdf | 27 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 27 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 27 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 27 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 25 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A (2022-2023).pdf | 10 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 1 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 21 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf | 21 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 2_compressed.pdf | 17 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf | 15 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 6 Jan 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Ganga Fernhill phase 02 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Undri13,700+ in Pune
Filed coordinates, straight-line distance. 178 registered projects within 2 km.
THE SPECTRUM
SHRIRAM PROPERTIES LIMITED
GANGA MILLENNIA UNDRI BUILDING J,K,L,M AND N
GOEL GANGA INDIA PVT LTD
NYATI ESTEBAN II
NYATI REALTORS LLP
Lodha Pune NIBM Project
Lodha Developers Limited
KHUSH VISTA
Elated Housing LLP
The Atrium
Arhumashtika Life Spaces
Builder: MEENAMANI GANGA BUILDERS LLP
MEENAMANI GANGA BUILDERS LLP has 2 registrations on MahaRERA, including GANGA FERNHILL PHASE I and Ganga Fernhill phase 02. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Ganga Fernhill phase 02 is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Ganga Fernhill phase 02?
The registered promoter entity is MEENAMANI GANGA BUILDERS LLP, a partnership as per the filing. Its GSTIN 27AAUFM6455H1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Ganga Fernhill phase 02?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Ganga Fernhill phase 02?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Ganga Fernhill phase 02?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Ganga Fernhill phase 02?
The professionals named in the filing: Architect: Vilas Tarawadi; Architect: Ar Krishna Bhagat; Engineer: Shrikant Morajkar; Chartered Accountant: DMKH and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Ganga Fernhill phase 02?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback