Home / Browse projects / GANGA ANTRA
GANGA ANTRA
By MEENAMANI APC CONSTRUCTION (I) LLP
RG-MH-04883 · RERA P52100021195 · Last updated on MahaRERA portal: 30 Apr 2025
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 30 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GANGA ANTRA is a Residential / Group Housing project by MEENAMANI APC CONSTRUCTION (I) LLP in KHARADI, 411014, registered with MahaRERA as P52100021195 on 14 Jun 2019. The registration is recorded completed; possession was promised by 30 Jun 2025. The completion date has moved by 30 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameGANGA ANTRA
- TypeResidential / Group Housing
- Location
- KHARADI
- 411014
- Pincode411014
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100021195
- ReraGenie IDRG-MH-04883
Builder
- NameMEENAMANI APC CONSTRUCTION (I) LLP
- Entity typePartnership
- GSTIN27ABBFM7788F1ZU
- PartnerAAKASH PRAKASH CHORDIA
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on14 Jun 2019
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 30 Dec 2022)
- Buildings3 building records
- Documents filed78 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Building | NA | 4 | 0 | 0 | 0 | 0 |
| B Building | NA | 4 | 0 | 0 | 0 | 0 |
| C Building | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 30 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 80%.
A Building64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B Building58%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C Building58%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 60% |
| Landscaping & Tree Planting | Yes | 70% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed29
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A Building | 10 | 0 | 10 |
| B Building | 5 | 9 | 14 |
| C Building | 2 | 3 | 5 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| TUSHAR HARISHCHANDRA KOTHAWADE | Pashan | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR RAHUL MALWADKARR |
| Chartered Accountant | DMKH & Co. |
| Chartered Accountant | Pooja Dagdiya & Associates |
| Partner | Role in project |
|---|---|
| MEENAMANI APC CONSTRUCTION (I) LLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have applied for Extension due to Covid delaying the construction of B And C Building.
Reason as filed by the promoterDue to Covid 19 Pandemic and unavailability of Resources.
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12400603 | MEENAMANI APC CONSTRUCTION (I) LLP | Mr Rahul Vilas Kadam | 28/10/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 May 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Jan 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 13 Jun 2023
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 30 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory.pdf | 30 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 9 Disclosure of sold_ booked inventory.pdf | 30 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ANtra.pdf | 28 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Antra.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FOrm 2 antra.pdf | 28 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 antra.pdf | 5 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Antra.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Antra.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: FORM D ANTRA.pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 20 Jul 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: GANGA ANTARA A.pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 23 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ANTRA.pdf | 21 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ANTRA.pdf | 21 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: FORM D ANTRA.pdf | 21 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3 - Antra.pdf | 21 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3 (1).pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 17 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Form D.pdf | 17 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2122 final 2A.pdf | 7 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2223 final 2A.pdf | 7 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Meenamani APC Ankit Sir.pdf | 7 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Meenamani APC Annuj Sir.pdf | 7 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 5 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 5 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 5 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 5 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 24 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory.pdf | 19 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A (2).pdf | 25 Jul 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 17 Jun 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 13-06-2023 A- Building Completion.pdf | 13 Jun 2023 |
| Certificates of CA (Form 3)File: (Form 3).pdf | 2 Jun 2023 |
| Certificates of CA (Form 3)File: (Form 3).pdf | 2 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 6 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 6 May 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventories.pdf | 6 May 2023 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (3) (1).pdf | 6 Apr 2023 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (3) (2).pdf | 6 Apr 2023 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (3) (3).pdf | 6 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf | 28 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf | 28 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf | 24 Mar 2023 |
| CERSAI detailsFile: CERSAI Report Antra.pdf | 17 Mar 2023 |
| PAN CardFile: PAN - Meenamani APC Construction (I) LLP.pdf | 16 Mar 2023 |
| Declaration about Commencement CertificateFile: Format D.pdf | 16 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf | 16 Mar 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 2 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 2 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 2 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 2 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 11 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf | 11 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf | 11 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 11 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 11 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold unsold inventory details.pdf | 27 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: ANTRA.pdf | 23 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ganga Antra - Form 1.pdf | 29 Nov 2022 |
| Layout approvalFile: 91121.pdf | 17 Jan 2022 |
| Building plan approvalFile: 91121.pdf | 17 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: 91121.pdf | 17 Jan 2022 |
| Building Plan Approval (IOD)File: 91121.pdf | 17 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 09-11-21.pdf | 17 Jan 2022 |
| OtherFile: Ganga Antara.pdf | 14 Aug 2021 |
| Details of encumbrancesFile: No Encumbarance Certificate.pdf | 7 Jun 2019 |
| Declaration in FORM BFile: Builder Form B.pdf | 7 Jun 2019 |
| Building plan approvalFile: Sheet 01.pdf | 31 May 2019 |
| Layout approvalFile: Sheet 01.pdf | 31 May 2019 |
| Copy of the legal title reportFile: Title report.pdf | 31 May 2019 |
| Copy of Layout Approval (in case of layout)File: Sheet 01.pdf | 31 May 2019 |
| Building Plan Approval (IOD)File: Sheet 01.pdf | 31 May 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 31 May 2019 |
| Certificates of CA (Form 3)File: C A Certificate.pdf | 31 May 2019 |
| Proforma of Allotment letterFile: RERA-AGREEMENT-GANGA ANTARA-dt240419.pdf | 31 May 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 78 filed documents as one ZIP, foldered, with a manifest
Keep GANGA ANTRA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KHARADI
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ Central Avenue
Vilas Javdekar Eco Homes
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Builder: MEENAMANI APC CONSTRUCTION (I) LLP
MEENAMANI APC CONSTRUCTION (I) LLP has 1 registration on MahaRERA, including GANGA ANTRA. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What are my rights if GANGA ANTRA is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GANGA ANTRA?
The registered promoter entity is MEENAMANI APC CONSTRUCTION (I) LLP, a partnership as per the filing. Its GSTIN 27ABBFM7788F1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GANGA ANTRA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against GANGA ANTRA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for GANGA ANTRA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GANGA ANTRA?
The professionals named in the filing: Architect: AR RAHUL MALWADKARR; Chartered Accountant: DMKH & Co.; Chartered Accountant: Pooja Dagdiya & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GANGA ANTRA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback