GANGA ACROPOLIS

By GANRAJ HOMES LLP

RG-MH-10951 · RERA P52100001396 · Last updated on MahaRERA portal: 28 Jun 2025

Source: official MahaRERA filing

Red flags

  • 11 complaints at MahaRERA
  • Completion date moved by 22 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2025Possession promisedregistration recorded completed
52 of 66Construction stages doneacross 6 buildings; furthest along: Installation of Lifts, 95%
11Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

GANGA ACROPOLIS is a Others project by GANRAJ HOMES LLP in Pune, Maharashtra, registered with MahaRERA as P52100001396 on 27 Jul 2017. The registration is recorded completed; possession was promised by 10 Apr 2025. The completion date has moved by 22 months from the original filing. 11 complaints are on record with the regulator.

At a glance

Project

  • NameGANGA ACROPOLIS
  • TypeOthers
  • Location
    • Maharashtra
    • Mulashi
    • Sus
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001396
  • ReraGenie IDRG-MH-10951

Builder

  • NameGANRAJ HOMES LLP
  • Entity typePartnership
  • LLPINAAG-5778
  • GSTIN27AAPFG7304Q1ZP
  • LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • PartnersAGRIM BISHAMBER GOEL, MAHAVIR RAMESHAWARDAS AGARWAL
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017First promiseJun 2023Revised toApr 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Jul 2017
  • Promised completion10 Apr 2025
  • Revised completionRevised to 10 Apr 2025 (originally 30 Jun 2023)
  • Buildings6 building records
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA90000
BNA90000
CNA260000
DNA260000
ENA260000
FNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 28 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

52 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Installation of Lifts, at 95%.

A73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities16

As on 28 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes36%
Proposed Covered ParkingYes80%

Parking filed349

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots349
Closed/Covered349
BuildingClosed/CoveredTotal
A1212
B1212
C4242
D9494
E7575
F114114

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area26,354 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
KALYANEE FORTUNE CONSTRUCTIONSMumbai CityMumbai City

Approvals and building plan

Permissible FSI31251.09
Proposed, not sanctioned27,624 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWanwadi Pune

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMALVADKAR ARCHITECTS
EngineerDESIGN WORKZS ENGINEERING PVT LTD
PartnerRole in project
GANRAJ HOMES LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100008600Jun 2023 → Dec 2023

Reason as filed by the promoterReason for Extension: On Account of varied reasons at different points of time during the tenure of the project such as: a. War, Civil Commotion or Act of God. b. Any notice, order, rule, notification of Government, and/or Municipal or other Public or Competent Authority/Court which prevents the Promoter from carrying out with the work of development and construction on the said Land. c. Any delay on the part of the Municipal Corporation of Pune or any other Public Body or Authority including but not limited to the M.S.E.D.C.L, in issuing or granting necessary Certificates / Noc’s / Permission

EXT52100025584Jun 2023 → Apr 2025

Reason as filed by the promoter1. The project has received the Occupation Certificate (OC) for the project Ganga Acropolis, for the Building A, B, C, D & E on 18/06/2021, bearing OC No. BMU/MOU.SUS/S.NO.41/1VOTHER/PRA.KRA.716/19/20 And for the building F, bearing OC No.-DP/BMU/MOU.SUS/S.NO.41/1ANDOTHER/PRA.KRA.716/20-21/272 on 09/04/2025, forming together as Full OC. 2 Seeking the extension till the date of OC. 3.OC has uploaded in other Tab 2 and 3 and also in main application 4. Revised Form B uploaded in Other tab 4 and main application.

Complaints filed with MahaRERA11

Case no.ComplainantRespondentFiled
CC005000000053845Madhuri SatheeshGanaraj Homes Private Limited06/01/2020
CC005000000053944Rahul Roy SharmaGanga Acropolis16/01/2020
CC005000000053972Chandrashekhar BorkarGanga Acropolis22/01/2020
CC005000000054032GajananGanga Acropolis12/02/2020
CC005000000054041Hemalatha SundararamanGanga Acropolis14/02/2020
CC005000000075067Anup Paitankar and Swati RaksheGanga Acropolis09/01/2021
CC005000000290193Amol Shahuraj PatilGanraj Homes LLP22/01/2024
CC005000000290229Ms. Ankita KapoorM/S Ganraj Homes LLP27/01/2024
CC12400012Vijendra S IyerGANRAJ HOMES LLP03/09/2024
CC12500062GANGA ACROPOLIS COOPERATIVE HOUSING SOCIETY LIMITEDGANRAJ HOMES LLP07/01/2025
CC12602793GANRAJ HOMES LLPANKITA KAPOOR13/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Dec 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: 24 Form 3 CA Cert Ganga Acro Jun 23-2.pdf28 Jun 2025
Certificates of CA (Form 3)File: 25 Form 3 CA Cert Ganga Acro Sep 23-3.pdf28 Jun 2025
Certificates of CA (Form 3)File: 26 Form 3 CA Cert Ganga Acro Dec 23-2.pdf28 Jun 2025
Certificates of CA (Form 3)File: 27 Form 3 CA Cert Ganga Acro Mar 24-3.pdf28 Jun 2025
Certificates of CA (Form 3)File: 28 Form 3 CA Cert Ganga Acro Jun 24-2.pdf28 Jun 2025
Certificates of CA (Form 3)File: 29 Form 3 CA Cert Ganga Acro Sep 24-2.pdf28 Jun 2025
Certificates of CA (Form 3)File: 30 Form 3 CA Cert Ganga Acro Dec 24-2.pdf28 Jun 2025
Certificates of CA (Form 3)File: 31 Form 3 CA Cert Ganga Acro Mar 25-2.pdf28 Jun 2025
Certificates of CA (Form 3)File: 23 Form 3 CA Cert Ganga Acro Mar 23-3.pdf28 Jun 2025
Disclosure of sold/ booked inventoryFile: March 2025 sold.pdf28 Jun 2025
Disclosure of sold/ booked inventoryFile: December 2024 sold.pdf28 Jun 2025
Disclosure of sold/ booked inventoryFile: September 2024 sold.pdf28 Jun 2025
Disclosure of sold/ booked inventoryFile: June 2024 sold.pdf28 Jun 2025
Disclosure of sold/ booked inventoryFile: march 2024 sold.pdf28 Jun 2025
Disclosure of sold/ booked inventoryFile: Dec 2023 sold.pdf28 Jun 2025
Disclosure of sold/ booked inventoryFile: sep 2023 sold.pdf28 Jun 2025
Disclosure of sold/ booked inventoryFile: June 2023 sold.pdf28 Jun 2025
Disclosure of sold/ booked inventoryFile: March 2023 sold.pdf28 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: march 2023.pdf30 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 24 Form 2 Er Certificate Ganga Acro Jun 23.pdf30 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 25 Form 2 Er Certificate Ganga Acro Sep 23.pdf30 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 26 Form 2 Er Certificate Ganga Acro Dec 23 (1).pdf30 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 march 2024.pdf30 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 june 2024.pdf30 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 sep 2024.pdf30 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 dec 2024.pdf30 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 march 2025.pdf30 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 5 Form 2A Er QA Certificate Ganga Acro 2022.pdf30 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2022-23.pdf30 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2023-2024.pdf30 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 00 Form 1 Arch Cert Ganga Acro Mar 23.pdf29 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 00 Form 1 Arch Cert Ganga Acro Jun 23.pdf29 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 00 Form 1 Arch Cert Ganga Acro Sep 23.pdf29 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ganga acropolis form 3 dec 2023.pdf29 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 27 Form 3 Arch Cert Ganga Acro Mar 24 (2).pdf29 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: june 2024.pdf29 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: sep 2024.pdf29 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: dec 2024.pdf29 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: march 2025.pdf29 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 0 Form 2A Dt 16 04 2018 Quality Certificate Original Filed in RERA File.pdf9 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 3 Form 2A Dt 20 04 2021 Quality Certificate Original Filed in RERA File.pdf9 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5 Form 2A Dt 25 04 2023 Quality Certificate Original Filed in RERA File.pdf9 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5 Form 2A Dt 25 04 2023 Quality Certificate Original Filed in RERA File.pdf9 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 6 Form 2A Dt 18 04 2024 Quality Certificate Original Filed in RERA File.pdf9 Apr 2025
Declaration in FORM BFile: Form B _ RERA.pdf10 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A_ghllp_Ganga Acropolis_2019.pdf13 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A_ghllp_Ganga Acropolis_2020.pdf13 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Ganga Utopia Commercial_2021.pdf13 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Ganga Acropolis 2018 to 2019.pdf6 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Ganga Acropolis 2019 to 2020.pdf6 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Ganga Acropolis 2020 to 2021.pdf6 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ganga Acropolis 2021 to 2022.pdf6 Feb 2023
OtherFile: Completion Certificate Acropolis.pdf21 Jun 2021
Proforma of Allotment letterFile: ACROPOLIS-UNIT-AGREEMENT-20-11-2019 Revised.pdf18 Dec 2019
Proforma of Allotment letterFile: Ganga Acropolis RERA Draft Agreement_compressed.pdf18 Dec 2019
Proforma of Allotment letterFile: ACROPOLIS-UNIT-AGREEMENT-20-11-2019.pdf17 Dec 2019
Layout approvalFile: Sus 41 Laout Copy 26-07-2019 (1) (1).pdf10 Dec 2019
Copy of Layout Approval (in case of layout)File: Sus 41 Laout Copy 26-07-2019 (1) (1).pdf10 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: Sus 41 CC Layout- 26-07-2019.pdf10 Dec 2019
Certificates of CA (Form 5)File: Self Declaration - Form 5 Acro.pdf20 Nov 2018
Proforma of Allotment letterFile: ACROPOLIS-REVISED-AGREEMENT-FOR-FLATS-OTHER-THAN -PENT-HOUSES-20-07-2018.pdf27 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Acropolis A,B,C,D,E (1).pdf28 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE Acropolis 311217 (1).pdf19 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER Certificate Acro 311217-1 (2).pdf19 Feb 2018
Certificates of CA (Form 3)File: CA cert Acro 311217-1 (1).pdf19 Feb 2018
Layout approvalFile: Sanction Layout GHLLP.pdf24 Jul 2017
Building plan approvalFile: GHLLP IOD.pdf24 Jul 2017
PAN CardFile: PAN-GHLLP.PDF24 Jul 2017
Copy of the legal title reportFile: Title 1MB GHLLP.pdf24 Jul 2017
Details of encumbrancesFile: Index Mortgage Deed GHLLP.pdf24 Jul 2017
Copy of Layout Approval (in case of layout)File: Sanction Layout GHLLP.pdf24 Jul 2017
Building Plan Approval (IOD)File: GHLLP IOD.pdf24 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Final CC GHLLP 1MB.pdf24 Jul 2017
Declaration in FORM BFile: FORM B GHLLP.pdf24 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect letter - GHLLP 1MB.pdf24 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate GHLLP 1MB.pdf24 Jul 2017
Certificates of CA (Form 3)File: CA Cert GHLLP Final 1MB.pdf24 Jul 2017
Proforma of Allotment letterFile: GHLLP Draft Allottment Letter.pdf24 Jul 2017
Proforma of Allotment letterFile: GHLLP Draft Agreement.pdf24 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
GANGA IMPERIA BLDG AP52100079248MOHAMMADWADI PUNE, Pune160Feb 2025Certificate SignedMar 2030Aug 2025

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 22 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GANGA ACROPOLIS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulashi13,700+ in Pune

Builder: GANRAJ HOMES LLP

GANRAJ HOMES LLP has 3 registrations on MahaRERA, including GANGA ACROPOLIS and GANGA IMPERIA BLDG A. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GANGA ACROPOLIS is delayed beyond 10 Apr 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GANGA ACROPOLIS?

The registered promoter entity is GANRAJ HOMES LLP, a partnership as per the filing. Its LLPIN AAG-5778 and GSTIN 27AAPFG7304Q1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GANGA ACROPOLIS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GANGA ACROPOLIS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GANGA ACROPOLIS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GANGA ACROPOLIS?

The professionals named in the filing: Architect: MALVADKAR ARCHITECTS; Engineer: DESIGN WORKZS ENGINEERING PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GANGA ACROPOLIS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GANGA ACROPOLIS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GANGA ACROPOLIS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.