Home / Browse projects / Thane, Maharashtra / GALAXY WING 5
GALAXY WING 5
By BRIGHT SKY HEIGHTS BUILDERS AND DEVELOPERS PRIVATE LIMITED
RG-MH-25928 · RERA P51700009788 · Last updated on MahaRERA portal: 30 Nov 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 4 complaints at MahaRERA
- Completion date moved by 72 months
- 5 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GALAXY WING 5 is a Residential / Group Housing project by BRIGHT SKY HEIGHTS BUILDERS AND DEVELOPERS PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700009788 on 22 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 72 months from the original filing. 56 of the 77 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 4 complaints are on record with the regulator.
At a glance
Project
- NameGALAXY WING 5
- TypeResidential / Group Housing
- Location
- Kalyan Shil Road
- Padale Village
- Thane (M Corp.)
- Thane
- 421204
- Pincode421204
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700009788
- ReraGenie IDRG-MH-25928
Builder
- NameBRIGHT SKY HEIGHTS BUILDERS AND DEVELOPERS PRIVATE LIMITED
- Entity typeCompany
- Managing DirectorsAMARSINGH NARAYANSINGH THAKUR, SOHANSINGH AMARSINGH THAKUR, SHAKTI BHAGWANSINGH KUSHWA, DHAJI VELJI BAUVA, PREMJI LAKHAMSHI KARIA
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on22 Aug 2017
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2019)
- Buildings1 building record
- Documents filed100 files
Current status
Figures as on 30 Nov 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GALAXY WING 5 | NA | 22 | 20 | 77 | 0 | 77 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
GALAXY WING 5: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 30 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 95% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed51
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| GALAXY WING 5 | NA | Rs 15.82 cr | Rs 15.28 cr |
| - | NA | Rs 1.52 cr | Rs 1.49 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SAAKAAR ARCHITECTS |
| Engineer | Rajan Chandrakant Tipnis |
| Chartered Accountant | MAYANK KUMAR JAIN |
| Chartered Accountant | VIPUL JAIN |
| Partner | Role in project |
|---|---|
| BRIGHT SKY HEIGHTS BUILDERS AND DEVELOPERS PRIVATE LIMITED | - |
Extensions applied for5
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterPaucity of funds on account of lack of sales of unsold inventory owned by Company and delay in receipt of outstanding payments due and payable by purchasers towards at the time of handover of their alloted units in building no.1 & 2. Since July 2017, the Company has witnessed lack luster sales which has burdened the Company financial position. The said sub sequence of events had the Company in turbulent financial situation and on the verge of Bankruptcy. Nonetheless the Company in tireless working of the option to shore up funds to aid the completion of building no.5 , a fact established beyon
Reason as filed by the promoterWe sought an extension for project completion due to the main reason listed below: 1. Our project is badly affected by Covid impact. 2. Due to Skilled labour unavailability and labour migration issues, project is affected a lot. Even contractors are asking us to allow them more time due to labour issues. 3. Customers are also facing financial problems There are huge receivable from the customers but we are unable to receive the same, which in turn has affected our financial position as well. Customers and we both are highly affected in last 1 and half year. 4. Even there is a long delay from L
Reason as filed by the promoterThe project got delayed due to delay in collection of Sales receivable and delay in sales of unsold units. Due to this financial issues, vendor and supplier payments got delayed. Due to non-receipt of timely payments suppliers/vendors have also not completed the activities on time. Therefore, project could not be completed as planned. We have obtained consent from allottees for project extension. Requesting you to grant the extension. Thanking you
Reason as filed by the promoterWe are facing hindrance for construction work of Building 5 of project galaxy, due to various issues raised by landlords and legal proceedings in court of law from first notice served by their Advocate Mr. Nitin Mhatre on 28.11.2022. They instituted a Special Civil Suit against us in the month of August 2023 in the court of 3rd Joint Civil judge Senior Division Thane. Further They served Notice of demand for Rs. 15000000/- we moved to Mumbai High Court for appointment of arbitrator under section 9 and section 17. The Honorable High Court has passed an order for appointment of Arbitrator on 24.
Reason as filed by the promoterWe had faced hindrance for construction work of Building 5 of project galaxy, due to various issues raised by landlords and legal proceedings in court of law from first notice served by their Advocate Mr. Nitin Mhatre on 28.11.2022. They instituted a Special Civil Suit against us in the month of August 2023 in the court of 3rd Joint Civil judge Senior Division Thane. Further They served Notice of demand for Rs. 15000000/- we moved to Mumbai High Court for appointment of arbitrator under section 9 and section 17. The Honorable High Court has passed an order for appointment of Arbitrator on 24.0
Litigation declared1
| Case | Court | Status |
|---|---|---|
| RCA123/2016 | Thane Civil Court | Awaiting Summons |
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000055911 | Rajendra Eknath Pawar | Bright Sky Height Builder& Developer Private Limited | 23/08/2018 |
| CC006000000193160 | Rajan G. Redkar | Mr. Sohansingh Amansing Thakur and Mr. Santosh B. Kushwah | 23/07/2020 |
| CC006000000195959 | Mohini Milind Kale | Bright Sky Heights Builder and Developers Private Limited | 09/02/2021 |
| CC12500065 | Mini Shivkumar Pillai | BRIGHT SKY HEIGHTS BUILDERS AND DEVELOPERS PRIVATE LIMITED | 07/01/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Feb 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Feb 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed100
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form No 1 Dtd 30062025.pdf | 30 Nov 2025 |
| Withdrawal Update Form 2File: Form No 2 Dtd 30062025.pdf | 30 Nov 2025 |
| Withdrawal Update Form 3File: Form No 3 Dtd 30062025.pdf | 30 Nov 2025 |
| Disclosure of sold/ booked inventoryFile: RERA SOLD UNSOLD.pdf | 15 Mar 2025 |
| Declaration in FORM BFile: FORM B UPDATED.pdf | 10 Mar 2025 |
| Layout approvalFile: Layout 1.pdf | 14 Feb 2025 |
| Layout approvalFile: Layout 2.pdf | 14 Feb 2025 |
| Layout approvalFile: Layout 2.pdf | 14 Feb 2025 |
| Building plan approvalFile: Bldg plan 1.pdf | 14 Feb 2025 |
| Building plan approvalFile: Bldg plan 2.pdf | 14 Feb 2025 |
| Building plan approvalFile: Bldg plan 3.pdf | 14 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: Layout 2.pdf | 14 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: Layout 2.pdf | 14 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: Layout 1.pdf | 14 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 14 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Dec 24.pdf | 14 Feb 2025 |
| Certificates of CA (Form 3)File: Signed Form 3 _ Sep 24.pdf | 14 Feb 2025 |
| Certificates of CA (Form 3)File: Signed Form 3 _ Dec 24.pdf | 14 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 14 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Dec 24.pdf | 14 Feb 2025 |
| Building Plan Approval (IOD)File: Bldg plan 1.pdf | 14 Feb 2025 |
| Building Plan Approval (IOD)File: Bldg plan 3.pdf | 14 Feb 2025 |
| Building Plan Approval (IOD)File: Bldg plan 2.pdf | 14 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Sep.pdf | 14 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Signed Form 3 _ Dec 24.pdf | 14 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Sep.pdf | 14 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Dec.pdf | 14 Feb 2025 |
| CERSAI detailsFile: CERSAI.pdf | 14 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Declaration.pdf | 14 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2a.pdf | 14 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf | 14 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2324.pdf | 14 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 19 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 19 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A.pdf | 19 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 19 Nov 2024 |
| Declaration in FORM BFile: Form B.pdf | 19 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 19 Nov 2024 |
| Declaration in FORM BFile: Form B.pdf | 19 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 19 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 19 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 19 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 19 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A.pdf | 19 Nov 2024 |
| Declaration in FORM BFile: FORM B UPDATED.pdf | 1 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Cert, Jan -Mar'23.pdf | 1 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Cert, April-June'23.pdf | 1 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERTIFICATE FORM 2.pdf | 1 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 APR TO JUN.pdf | 1 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A Certficate.pdf | 1 Dec 2023 |
| Certificates of CA (Form 3)File: Form - 3.pdf | 1 Dec 2023 |
| Certificates of CA (Form 3)File: Form - 3 APR TO JUN.pdf | 1 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form -5.pdf | 1 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold details.pdf | 6 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 31122021.pdf | 15 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 30062021.pdf | 15 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 30092021.pdf | 15 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 31122021.pdf | 15 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Details 30-06-21.pdf | 15 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Details 30-09-21.pdf | 15 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Details 31-12-2021.pdf | 15 Jan 2022 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 15 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 of Bright March 2018.pdf | 7 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 of Bright March 2019.pdf | 7 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 of Bright March 2020.pdf | 7 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 of Bright March 2021.pdf | 7 Jan 2022 |
| Layout approvalFile: LAYOUT PLAN.pdf | 5 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf | 5 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 MAR 18 COMPRESSED.pdf | 5 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 MAR 19 COMPRESSED.pdf | 5 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 MAR 20 COMPRESSED.pdf | 5 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 MAR 21 COMPRESSED.pdf | 5 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 JUN 21 COMPRESSED.pdf | 5 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 MAR 18.pdf | 5 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 MAR 19.pdf | 5 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 MAR 20.pdf | 5 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 MAR 21.pdf | 5 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 JUN 21.pdf | 5 Jan 2022 |
| Certificates of CA (Form 3)File: FORM 3_MARCH 18_compressed.pdf | 5 Jan 2022 |
| Certificates of CA (Form 3)File: FORM 3_MAR 19_compressed.pdf | 5 Jan 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 100 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GALAXY WING 5 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Padale Village7,600+ in Thane
Filed coordinates, straight-line distance. 22 registered projects within 2 km.
Constrcution of 2557 EWS tenements at S.No.157
ARUN SHANKARRAO BORGAVE
Runwal Gardens Phase I
Runwal Residency Private Limited
Runwal Garden City Cluster 6 Tower 6 to 9
HORIZON PROJECTS PVT LTD
Runwal Gardens Phase 6A Bldg No. 53-54
Runwal Residency Private Limited
RGC Runwal My City EWS - LIG Building
HORIZON PROJECTS PVT LTD
BALAJI ESTATE PHASE 2
M/S SAI BALAJI BUILDCON
See every Thane project, with the district possession charts
Builder: BRIGHT SKY HEIGHTS BUILDERS AND DEVELOPERS PRIVATE LIMITED
BRIGHT SKY HEIGHTS BUILDERS AND DEVELOPERS PRIVATE LIMITED has 2 registrations on MahaRERA, including GALAXY BLDG 1 AND 2 and GALAXY WING 5. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that GALAXY WING 5 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if GALAXY WING 5 is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GALAXY WING 5?
The registered promoter entity is BRIGHT SKY HEIGHTS BUILDERS AND DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GALAXY WING 5?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against GALAXY WING 5?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for GALAXY WING 5?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GALAXY WING 5?
The professionals named in the filing: Architect: SAAKAAR ARCHITECTS; Engineer: Rajan Chandrakant Tipnis; Chartered Accountant: MAYANK KUMAR JAIN; Chartered Accountant: VIPUL JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GALAXY WING 5?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback