ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / GALAXY

Completed No litigation declared Residential / Group Housing project

GALAXY

By GAWADE REALTY LLP

RG-MH-16163 · RERA P52100025203 · Last updated on MahaRERA portal: 27 Jun 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2024Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

GALAXY is a Residential / Group Housing project by GAWADE REALTY LLP in Pune, Maharashtra, registered with MahaRERA as P52100025203 on 23 Mar 2020. The registration is recorded completed; possession was promised by 30 May 2024.

At a glance

Project

  • NameGALAXY
  • TypeResidential / Group Housing
  • Location
    • BRT LINK ROAD
    • RAVET
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • RERA no.P52100025203
  • ReraGenie IDRG-MH-16163

Builder

  • NameGAWADE REALTY LLP
  • Entity typePartnership
  • PartnersVILAS PANDURANG GAWADE, VIRAJ VILAS GAWADE
  • Declared earlier projects5 →

Key dates

this monthRegisteredMar 2020PromisedMay 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Mar 2020
  • Promised completion30 May 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed83 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GALAXY - A BUILDINGNA130000
GALAXY- B BUILDINGNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 27 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

GALAXY - A BUILDING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
GALAXY- B BUILDING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed97

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots97
Closed/Covered33
Open Space64
BuildingClosed/CoveredOpen SpaceTotal
GALAXY - A BUILDING163248
GALAXY- B BUILDING173249

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,137 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
VILAS PANDURANG GAWADE HUFPimpri Chinchawad (M Corp.)Pune
TUKARAM LAXMAN MATEKhadakwasalaPune

Approvals and building plan

Permissible FSI7034.85
Proposed, not sanctioned7,035 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPB No 1, Old Mumbai - Pune Hwy, Kasarwadi, Pune, Maharashtra 411034

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectI P ASSOCIATES
EngineerVINAYAK V KELKAR
Chartered AccountantKAJAL N KAMBLE
PartnerRole in project
GAWADE REALTY LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Mar 2024

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation Certificate - Galaxy.pdf27 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate form no 2.pdf18 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engg Certificate Quality Assu 24.pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Certificate form NO 3.pdf18 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 C A Certificate.pdf16 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion certificate.pdf23 Mar 2024
Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate Form- 4.pdf23 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf24 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Form 2.pdf24 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Form 3.pdf24 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Form 3.pdf29 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificcate.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf15 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate form 2.pdf15 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Form 3.pdf15 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf8 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate form 2.pdf8 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera Cert 31032023-1.pdf8 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Gawade Realty LLP (1).pdf18 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form No 2.pdf1 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE.pdf1 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate form No 3.pdf1 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form No 5 Annual Report.pdf21 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engg Certificate Quality Assurance.pdf7 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form No 3.pdf23 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form No 2.pdf23 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 C A Certificate (2).pdf23 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form No 1.pdf17 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certificate 2.pdf17 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 220420-engg-2-certificate.pdf3 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From No 3 C A Certificate_.pdf3 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form no 1_.pdf2 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_compressed.pdf3 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg-2-certificate_compressed.pdf3 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate form 3.pdf3 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report_200228534225_For_Asset_Based_Search_21_01_2022_12_08_09_901.pdf25 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_200228534296_For_Asset_Based_Search_21_01_2022_12_08_41_315.pdf25 Jan 2022
Building plan approvalFile: Temp00079.PDF20 Dec 2021
Building plan approvalFile: Temp00080.PDF20 Dec 2021
Building plan approvalFile: Temp00082.PDF20 Dec 2021
Building plan approvalFile: Temp00083.PDF20 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: Temp00079.PDF20 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: Temp00080.PDF20 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: Temp00082.PDF20 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: Temp00083.PDF20 Dec 2021
Disclosure of sold/ booked inventoryFile: sold unslod inventory.pdf18 Dec 2021
Layout approvalFile: Layout.PDF1 Dec 2021
Copy of Layout Approval (in case of layout)File: Layout.PDF1 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: commencement_compressed.pdf30 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf30 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 211123-engg-2-certificate_compressed.pdf30 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 CA Certificate.pdf30 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate form NO1.pdf8 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg-2-certificate.pdf8 Jul 2021
Disclosure of sold/ booked inventoryFile: Discloser of Sale.pdf5 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate form no 3_compressed.pdf5 Jul 2021
Declaration about Commencement CertificateFile: Declaratoin about comencement.pdf3 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality certificate.pdf3 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual Report Form 5.pdf3 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf17 Mar 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: From 2a Engieers Certificat for Quality assurance.pdf17 Mar 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 C A Certificate.pdf17 Mar 2020
Proforma of Allotment letterFile: Letter of Alotment and Draft Agreement.pdf17 Mar 2020
Layout approvalFile: Layout.pdf16 Mar 2020
Building plan approvalFile: HPSC0349.pdf16 Mar 2020
Building plan approvalFile: HPSC0351.pdf16 Mar 2020
Building plan approvalFile: HPSC0352.pdf16 Mar 2020
Building plan approvalFile: HPSC0353.pdf16 Mar 2020
Building plan approvalFile: HPSC0354.pdf16 Mar 2020
Copy of the legal title reportFile: Search and Title Report.pdf16 Mar 2020
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf16 Mar 2020
Copy of Layout Approval (in case of layout)File: Layout.pdf16 Mar 2020
Building Plan Approval / NA Order for plotted developmentFile: HPSC0349.pdf16 Mar 2020
Building Plan Approval / NA Order for plotted developmentFile: HPSC0351.pdf16 Mar 2020
Building Plan Approval / NA Order for plotted developmentFile: HPSC0352.pdf16 Mar 2020
Building Plan Approval / NA Order for plotted developmentFile: HPSC0353.pdf16 Mar 2020
Building Plan Approval / NA Order for plotted developmentFile: HPSC0354.pdf16 Mar 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf16 Mar 2020
Commencement Certificates / NA Order for plotted developmentFile: Ravet NA Order.pdf16 Mar 2020

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
EMERALD PH - IVWAKAD76CompletedJun 2019May 2019
EMERALD PH - IIIWAKAD32CompletedMay 2016Late, Aug 2016
EMERALD PH-II A,B BLDGWAKAD24CompletedMar 2015Late, Jul 2015
EMERALD PH -IWAKAD24CompletedSep 2013Late, Oct 2013
NAKSHATRA APARTMENT- B BLDGAKURDI24CompletedJan 2012Late, Aug 2012

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GALAXY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAVET13,700+ in Pune

Builder: GAWADE REALTY LLP

GAWADE REALTY LLP has 1 registration on MahaRERA, including GALAXY. Its filings disclose 5 earlier MahaRERA projects: declares 1 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GALAXY is delayed beyond 30 May 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GALAXY?

The registered promoter entity is GAWADE REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GALAXY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GALAXY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GALAXY?

The professionals named in the filing: Architect: I P ASSOCIATES; Engineer: VINAYAK V KELKAR; Chartered Accountant: KAJAL N KAMBLE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GALAXY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GALAXY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GALAXY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one