ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Galaxy

Registration lapsed No litigation declared Commercial project

Galaxy

By Raichandani Constructions Private Limited

RG-MH-66759 · RERA P52100045820 · Last updated on MahaRERA portal: 20 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 11 months past the filed date
  • Completion date moved by 5 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Nov 2025Possession promised11 months past this date
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 98%
28 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Galaxy is a Commercial project by Raichandani Constructions Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100045820 on 15 Jun 2022. Possession was promised by 30 Nov 2025 and is now 11 months past that date. The completion date has moved by 5 months from the original filing. 9 of the 37 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameGalaxy
  • TypeCommercial
  • Location
    • Baner
    • Pune
    • Haveli
    • 411045
  • Pincode411045
  • RERA no.P52100045820
  • ReraGenie IDRG-MH-66759

Builder

  • NameRaichandani Constructions Private Limited
  • Entity typeCompany
  • DirectorsAnil Kumar Raichandani, Deepaklal Raichandani, Dinesh Raichandani, Kunal Raichandani, SUNIL DOULATRAM RAICHANDANI
  • Other registrations6 more →
  • Completed1 of 7
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects5 →

Key dates

11 months past promisethis monthRegisteredJun 2022First promiseJun 2025Revised toNov 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Jun 2022
  • Promised completion30 Nov 2025
  • Revised completionRevised to 30 Nov 2025 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed81 files

Current status

24%9 of 37 units booked
100.0%Work done, per cost certificate

Figures as on 20 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GalaxyNA10803737

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 98%.

Galaxy: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%

Progress on shared amenities15

As on 20 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered30

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,251 sq m
Land owned byNot the promoter
Named landowners1
LandownerVillageDistrict
Kiran Shivdas RathodPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI3739.94
Proposed, not sanctioned3,740 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch9/2 Kalpataru Gardens, Boat Club Road, Pune
Estimated costRs 15.00 cr
Cost incurredRs 15.00 cr
Work done100.0%
BuildingWingEstimatedIncurred
GalaxyNARs 15.00 crRs 15.00 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJay Aeram & Associates Architects
EngineerSiddharth Sawant
Chartered AccountantParesh Sabadra
Chartered AccountantMilani Gattani & Co
Chartered AccountantSPAK & CO.
PartnerRole in project
Raichandani Constructions Private Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA29062501846Jun 2025 → Sep 2025

Reason as filed by the promoter1. Due to challenges beyond our control, including a significant shortage of skilled labour and delays in procurement of essential construction materials caused by supply chain disruptions, the progress of construction has been adversely impacted. Additionally, certain vendors failed to adhere to their committed delivery schedules, which affected the execution of key project activities. 2. We would like to clarify that the actual number of units in our project “Galaxy” is 37, out of which 34 units have been sold. However, due to technical issues faced while using the new MahaRERA portal, we we

EA09102518073Jun 2025 → Nov 2025

Reason as filed by the promoterRespected Sir/Madam, 1. The originally approved completion date for the project was 30.06.2025, which was extended to 30.09.2025. The said delay was caused due to shortage of skilled labor and delays in procurement of essential construction materials due to supply chain disruptions. 2. All major construction work has been completed as per declared timelines. The Occupancy Certificate (OC) application has already been submitted to Pune Municipal Corporation (PMC). We have received “Appendix-G” related to the OC on 29/09/2025, which we are attaching this “Appendix-G” document along with this ext

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: GALAXY FORM 1 Q3.pdf20 Jan 2026
Withdrawal Update Form 2File: GALAXY FORM 2 Q3.pdf20 Jan 2026
Withdrawal Update Form 3File: GALAXY FORM 3 Q3.pdf20 Jan 2026
Withdrawal Update Form 1File: GALAXY FORM 1.pdf17 Oct 2025
Withdrawal Update Form 2File: GALAXY FORM 2.pdf17 Oct 2025
Withdrawal Update Form 3File: FORM 3 GALAXY.pdf17 Oct 2025
Form 2A (FY 2024-2025)File: GALAXY FORM 2A.pdf17 Oct 2025
Withdrawal Update Form 1File: FORM 1 GALAXY.pdf7 Oct 2025
Withdrawal Update Form 2File: GALAXY FORM 2 Q1 2025-2026_signed.pdf7 Oct 2025
Withdrawal Update Form 3File: Scan2025-10-07_135140_signed.pdf7 Oct 2025
Form 5 (FY 2024-2025)File: Galaxy form 5 2024-2025.pdf30 Sep 2025
Form 3File: Galaxy form 3 Q4 2024-2025.pdf28 Jun 2025
Form 1File: GALAXY FORM 1 Q4 2024-2025.pdf28 Jun 2025
Form 2File: Galaxy Form 2 Q4 2024-2025.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: GALAXY SOLD - UNSOLD Q4 2024-2025.pdf28 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GALAXY FORM 1 Q4 2024-2025.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Galaxy form 3 Q4 2024-2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Galaxy Form 2 Q4 2024-2025.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: GALAXY SOLD - UNSOLD Q4 2024-2025.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GALAXY Q3 FORM 3 2024-2025 S1.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GALAXY FORM 2 Q3 2024-2025.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: Galaxy Q3 Sold Unsold.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Galaxy Q3 Form 1.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Scan2024-12-09_182047 Galaxy.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Galaxy Form 1.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Galaxy Form 2.pdf30 Oct 2024
Disclosure of sold/ booked inventoryFile: Galaxy Sold Unsold.pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: Galaxy Sold Unsold.pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: Galaxy Sold Unsold.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Galaxy form 3 Q1 2024-2025.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Galaxy Form 2 Q1 2024-25_compressed.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Galaxy Sold Unsold Q1 2024-25.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RCPL- ARCHITECT CERTIFICATE GALAXY Q1 2024-2025.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Galaxy form 5 Q4 2023-2024.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GALAXY FORM 1 Q4 2023-2024.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GALAXY FORM 2 Q4 2023-2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: galaxy.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 q3 - galaxy.pdf6 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 q3 - galaxy.pdf6 Jan 2024
Disclosure of sold/ booked inventoryFile: sold booked q3 - galaxy.pdf6 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 G.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf23 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - GALAXY.pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- GALAXY Q2.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Promoters Disclosure.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- GALAXY Q2.pdf10 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - GALAXY.pdf9 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE Q1 2023-2024.pdf8 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Q1 2023-2024.pdf8 Sep 2023
Disclosure of sold/ booked inventoryFile: GALAXY Q4 SOLD -UNSOLD INVENTRY.PDF8 Sep 2023
Disclosure of sold/ booked inventoryFile: Galaxy Q1 SOLD-UNSOLD INVENTRY.PDF8 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GALAXY Q1 CA CERTIFICATE 2023 - 2024_compressed.pdf8 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE Q4 2022-2023.pdf12 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER CERTIFICATE Q4 2022-2023.pdf12 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3_compressed.pdf12 Aug 2023
Details of encumbrancesFile: Galaxy Mortgage Deed_compressed.pdf10 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERT GALAXY Q-DEC.pdf8 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGREERING CERT GALAXY Q-DEC.pdf8 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Galaxy Engineers certificate.pdf16 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Galaxy Dec 22 CA Final Compressed.pdf16 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Galaxy_Arch _cert_sept.pdf28 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raichandani (The Galaxy) Sept 2022.pdf21 Jan 2023
Copy of the legal title reportFile: Title_compressed.pdf7 Jun 2022
Layout approvalFile: Plan 01.pdf26 May 2022
Layout approvalFile: Plan 02.pdf26 May 2022
Building plan approvalFile: Plan 01.pdf26 May 2022
Building plan approvalFile: Plan 02.pdf26 May 2022
PAN CardFile: Firm Pan Card.pdf26 May 2022
Details of encumbrancesFile: Encumbrance Letter.pdf26 May 2022
Copy of Layout Approval (in case of layout)File: Plan 01.pdf26 May 2022
Copy of Layout Approval (in case of layout)File: Plan 02.pdf26 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 01.pdf26 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 02.pdf26 May 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_compressed.pdf26 May 2022
Declaration about Commencement CertificateFile: Form D - CC declaration.pdf26 May 2022
Declaration in FORM BFile: Form B Developer_compressed.pdf26 May 2022
CERSAI detailsFile: CERSAI_Search_Report.pdf26 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Galaxy signed_compressed.pdf26 May 2022
Proforma of Allotment letterFile: Allotment Letter_Galaxy.pdf26 May 2022

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
INDIAN BANK STAFF CO-OPERATIVE HOUSING SOCIETY LTDP52100052515Salisbury Park, Pune37Sep 2023OngoingDec 2025Not delivered
GATEWAYP52100048395KHARADI, Pune29Jan 2023OngoingDec 2025Not delivered
Alpha CP52100045387Pune, Pune22May 2022OngoingSep 2025Registered original: Sep 2024Not delivered

How this compares with Pune

24%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 5 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Galaxy on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

Builder: Raichandani Constructions Private Limited

RAICHANDANI CONSTRUCTIONS PRIVATE LIMITED has 7 registrations on MahaRERA, including KESAR and Alpha C. Its filings disclose 5 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Galaxy shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Galaxy is delayed beyond 30 Nov 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Galaxy?

The registered promoter entity is Raichandani Constructions Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Galaxy?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Galaxy?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Galaxy?

The professionals named in the filing: Architect: Jay Aeram & Associates Architects; Engineer: Siddharth Sawant; Chartered Accountant: Paresh Sabadra; Chartered Accountant: Milani Gattani & Co; Chartered Accountant: SPAK & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Galaxy?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Galaxy. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Galaxy to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.