Home / Browse projects / Pune, Maharashtra / Alpha C

Completed No litigation declared Commercial project

Alpha C

By Raichandani Constructions Private Limited

RG-MH-77650 · RERA P52100045387 · Last updated on MahaRERA portal: 17 Oct 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
8 of 22Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

Alpha C is a Commercial project by Raichandani Constructions Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100045387 on 18 May 2022. The registration is recorded completed; possession was promised by 28 Sep 2025. The completion date has moved by 12 months from the original filing. 14 of the 22 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameAlpha C
  • TypeCommercial
  • Location
    • Baner
    • Pune
    • Haveli
    • 411045
  • Pincode411045
  • RERA no.P52100045387
  • ReraGenie IDRG-MH-77650

Builder

  • NameRaichandani Constructions Private Limited
  • Entity typeCompany
  • DirectorsAnil Kumar Raichandani, Deepaklal Raichandani, Dinesh Raichandani, Kunal Raichandani, SUNIL DOULATRAM RAICHANDANI
  • Other registrations6 more →
  • Completed1 of 7
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects5 →

Key dates

this monthRegisteredMay 2022First promiseSep 2024Revised toSep 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 May 2022
  • Promised completion28 Sep 2025
  • Revised completionRevised to 28 Sep 2025 (originally 30 Sep 2024)
  • Buildings1 building record
  • Documents filed97 files

Current status

64%14 of 22 units booked
93.3%Work done, per cost certificate

Figures as on 17 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Alpha CNA7702222

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Alpha C: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes75%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed107

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots107
Closed/Covered107

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area675 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Shashank Bhalchandra ChangulePune (M Corp.)Pune
Jay Prakash AeramPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE MUNCIPAL CORPORATION
Permissible FSI3339.45
Proposed, not sanctioned2,379 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch9/2 Kalpataru Gardens, Boat Club Road,Pune
Estimated costRs 9.70 cr
Cost incurredRs 9.05 cr
Work done93.3%
BuildingWingEstimatedIncurred
Alpha CNARs 9.70 crRs 9.05 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJay Aeram & Associates
EngineerSiddharth Sawant Sawant
Chartered AccountantMilani Gattani & Co
Chartered AccountantPushpak Bagoti
PartnerRole in project
Raichandani Constructions Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024272Sep 2024 → Sep 2025

Reason as filed by the promoterThere is a lack of labor unavailability and delay in material received so to comply with the same we require extension

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: APLHA C FORM 2A.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: alpaha c form 5 2024-2025.pdf30 Sep 2025
Building plan approvalFile: 18 BANER-PLAN-01-02 DT 21-03-2025 01.pdf18 Sep 2025
Building plan approvalFile: 02-02.pdf18 Sep 2025
Occupational CertificateFile: 2025-07-31 17-34.pdf4 Aug 2025
Withdrawal Update Form 1File: ALPHA C Q1 FORM 1 2025-2026.pdf1 Aug 2025
Withdrawal Update Form 2File: ALPHA C FORM 2 Q1 2025-2026_signed.pdf1 Aug 2025
Withdrawal Update Form 3File: Form-3 Alpha C Jun-25 (1).pdf1 Aug 2025
Withdrawal Update Form 1File: ALPHA C Q1 FORM 1 2025-2026.pdf29 Jul 2025
Withdrawal Update Form 2File: ALPHA C FORM 2 Q1 2025-2026_signed.pdf29 Jul 2025
Withdrawal Update Form 3File: Form-3 Alpha C Jun-25 (1).pdf29 Jul 2025
Withdrawal Update Form 1File: ALPHA C Q1 FORM 1 2025-2026.pdf28 Jul 2025
Withdrawal Update Form 1File: ALPHA C Q1 FORM 1 2025-2026.pdf28 Jul 2025
Withdrawal Update Form 1File: ALPHA C Q1 FORM 1 2025-2026.pdf28 Jul 2025
Withdrawal Update Form 1File: ALPHA C Q1 FORM 1 2025-2026.pdf28 Jul 2025
Withdrawal Update Form 1File: ALPHA C Q1 FORM 1 2025-2026.pdf28 Jul 2025
Withdrawal Update Form 1File: ALPHA C Q1 FORM 1 2025-2026.pdf28 Jul 2025
Withdrawal Update Form 2File: ALPHA C FORM 2 Q1 2025-2026_signed.pdf28 Jul 2025
Withdrawal Update Form 2File: ALPHA C FORM 2 Q1 2025-2026_signed.pdf28 Jul 2025
Withdrawal Update Form 2File: ALPHA C FORM 2 Q1 2025-2026_signed.pdf28 Jul 2025
Withdrawal Update Form 2File: ALPHA C FORM 2 Q1 2025-2026_signed.pdf28 Jul 2025
Withdrawal Update Form 2File: ALPHA C FORM 2 Q1 2025-2026_signed.pdf28 Jul 2025
Withdrawal Update Form 2File: ALPHA C FORM 2 Q1 2025-2026_signed.pdf28 Jul 2025
Withdrawal Update Form 3File: Form-3 Alpha C Jun-25 (1).pdf28 Jul 2025
Withdrawal Update Form 3File: Form-3 Alpha C Jun-25 (1).pdf28 Jul 2025
Withdrawal Update Form 3File: Form-3 Alpha C Jun-25 (1).pdf28 Jul 2025
Withdrawal Update Form 3File: Form-3 Alpha C Jun-25 (1).pdf28 Jul 2025
Withdrawal Update Form 3File: Form-3 Alpha C Jun-25 (1).pdf28 Jul 2025
Withdrawal Update Form 3File: Form-3 Alpha C Jun-25 (1).pdf28 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ALPHA C FORM 1 Q4 2024-2025.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Alpha C form 3 Q4 2024-2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Alpha C Form 2 Q4 2024-2025.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: ALPHA C SOLD - UNSOLD Q4 2024-2025.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GALAXY Q3 FORM 3 2024-2025 S1.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Alpha C_Dec 24 signed1.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Alpha C Form 2 Q3.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: alpha c sold - unsold Q3 2024-2025.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GALAXY FORM 2 Q3 2024-2025.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Alpha C Q3 Form 1.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Alpha C Form 1.pdf11 Nov 2024
Disclosure of sold/ booked inventoryFile: Alpha C Sold Unsold.pdf11 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Alpha c form 3 Q1 2024-2025.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Alpha C Form 2 Q1 2024-25_compressed.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Alpha C Sold Unsold Q1 2024-25.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RCPL - ARCHITECT CERTIFICATE ALPHA C 2024-2025.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: alpha c sold unsold.pdf13 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: alpha c FORM 5 Q4 2023-2024.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ALPHA C FORM 1 Q4 2023-2024.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ALPHA C FORM 2 Q4 2023-2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: alpha c.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 q3 - alpha c.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 q3 - alpha c.pdf8 Jan 2024
Disclosure of sold/ booked inventoryFile: sold booked q3 - alpha c.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - ALPHA C.pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- ALPHA C Q2.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Promoters Disclosure.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- ALPHA C Q2.pdf10 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - ALPHA C.pdf9 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE Q1 2023-2024.pdf8 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Q1 2023-2024.pdf8 Sep 2023
Disclosure of sold/ booked inventoryFile: ALPHA C Q4 SOLD- UNSOLD INVENTRY.PDF8 Sep 2023
Disclosure of sold/ booked inventoryFile: ALPHA C Q1 SOLD- UNSOLD INVENTRY.PDF8 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 FY 2023-24 Alpha C_compressed.pdf8 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Alpha C Q1 CA certificate 2023-2024_compressed.pdf8 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Q4 2022-2023.pdf11 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Q4 2022-2023.pdf11 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3.pdf11 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3.pdf11 Aug 2023
Details of encumbrancesFile: Alpha C Mortgage Deed.pdf10 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERT ALPHA-C Q-DEC.pdf8 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGREERING CERT ALPHA -C Q-DEC.pdf8 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Alpha C DEC 2022 FINAL_compressed (1).pdf16 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ALPHA C 1.pdf2 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: alpha c (1)_arch_june.pdf28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Alpha C _ENG _CERT.pdf28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: alpha c 2_Eng_Cert.pdf28 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raichandani (Alpha C) June 2022.pdf21 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raichandani (Alpha C) Sept 2022.pdf21 Jan 2023
Copy of the legal title reportFile: Titile Report Alpha C.pdf7 May 2022

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
INDIAN BANK STAFF CO-OPERATIVE HOUSING SOCIETY LTDP52100052515Salisbury Park, Pune37Sep 2023OngoingDec 2025Not delivered
GATEWAYP52100048395KHARADI, Pune29Jan 2023OngoingDec 2025Not delivered
GalaxyP52100045820Pune, Pune37Jun 2022OngoingJun 2025Not delivered

How this compares with Pune

64%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Alpha C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

Builder: Raichandani Constructions Private Limited

RAICHANDANI CONSTRUCTIONS PRIVATE LIMITED has 7 registrations on MahaRERA, including KESAR and Alpha C. Its filings disclose 5 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Alpha C is delayed beyond 28 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Alpha C?

The registered promoter entity is Raichandani Constructions Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Alpha C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Alpha C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Alpha C?

The professionals named in the filing: Architect: Jay Aeram & Associates; Engineer: Siddharth Sawant Sawant; Chartered Accountant: Milani Gattani & Co; Chartered Accountant: Pushpak Bagoti. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Alpha C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Alpha C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Alpha C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.