Home / Browse projects / Palghar, Maharashtra / GALAXY PRIDE

Registered No litigation declared Residential / Group Housing project

GALAXY PRIDE

By GRAVITY DEVELOPER

RG-MH-18949 · RERA P99000077904 · Last updated on MahaRERA portal: 3 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Staircases, 30%
24 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

GALAXY PRIDE is a Residential / Group Housing project by GRAVITY DEVELOPER in Palghar, Maharashtra, registered with MahaRERA as P99000077904 on 13 Nov 2024. Possession is promised by 30 Jun 2027. 1 of the 25 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameGALAXY PRIDE
  • TypeResidential / Group Housing
  • Location
    • PALGHAR MAHIM ROAD
    • MAHIM
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000077904
  • ReraGenie IDRG-MH-18949

Builder

  • NameGRAVITY DEVELOPER
  • Entity typePartnership
  • GSTIN27AAYFG7659M1Z6
  • PartnersDINESH PYARELAL TIWARI, NISHANT PRABHAKAR PATIL
  • PartnerVARAD RAMESH PATIL
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2024PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Nov 2024
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Current status

4%1 of 25 units booked
43.7%Work done, per cost certificate

Figures as on 3 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GALAXY PRIDE,Building No-1 Type ANA6625025

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 30%.

GALAXY PRIDE,Building No-1 Type A: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered20
Open Space20

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,014 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
DATTATRAYA SHANKAR SHILEDARPalghar Palghar
HEMLATA DATTATRAY SHILEDARPalghar Palghar
JASWANTI BABULAL SAWANIPalghar Palghar

Approvals and building plan

Sanctioning authorityCOLLECTOR OFFICE PALGHAR
Permissible FSI2245.75
Proposed, not sanctioned2,246 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOLD UMA VILLA GROUND FLOOR MAHIM ROAD PANCH BATTI NAKA PALGHAR WEST 401404
Estimated costRs 5.57 cr
Cost incurredRs 2.44 cr
Work done43.69%
BuildingWingEstimatedIncurred
GALAXY PRIDE,Building No-1 Type ANARs 4.87 crRs 2.44 cr
-NARs 70.36 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVASTU SHILP
ArchitectNISHANT P PATIL
EngineerKS ENGINEERING SERVICES
EngineerCENTRELINE ENGINEERS & CONSULTANTS
Chartered AccountantNAYAN B GORE AND COMPANY
Chartered AccountantNAYAN B GORE & CO.
Chartered AccountantKIRAN R DANI & CO.
PartnerRole in project
GRAVITY DEVELOPER-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form-2A(Fy 2025-26)Galaxy pride.pdf3 Jun 2026
Form 2A (FY 2024-2025)File: galaxy pride form 2A 30 May 2026.pdf1 Jun 2026
Form 5 (FY 2025-2026)File: galaxy pride form 5 30 May 2026.pdf1 Jun 2026
Withdrawal Update Form 1File: Form-1 March 2026.pdf26 May 2026
Withdrawal Update Form 2File: Form-2 March 2026.pdf26 May 2026
Withdrawal Update Form 3File: Form-3 March 2026.pdf26 May 2026
Withdrawal Update Form 1File: Form-1Dec 2025.pdf23 Feb 2026
Withdrawal Update Form 2File: Form-2 Dec 2025.pdf23 Feb 2026
Withdrawal Update Form 3File: Form-3 Dec 2025.pdf23 Feb 2026
Withdrawal Update Form 1File: Form-1 30092025-Galaxy pride.pdf26 Nov 2025
Withdrawal Update Form 2File: Form-2 30092025-Galaxy Pride.pdf26 Nov 2025
Withdrawal Update Form 3File: Form-3.pdf26 Nov 2025
Form 1File: Form-1.pdf30 May 2025
Form 2File: Form-2.pdf30 May 2025
Form 3File: Form-3 31030205.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf30 May 2025
Form 1File: fORM-1.pdf24 May 2025
Form 2File: fORM-2.pdf24 May 2025
Form 3File: Form-3.pdf24 May 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold.pdf24 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DocScanner Jan 31, 2025 12-14.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DocScanner Jan 31, 2025 12-14.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM-1.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM-2.pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM-1.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM-2.pdf11 Jan 2025
Other - FinanceFile: Explanation (2).pdf9 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Corrected.pdf4 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Gravity corrected.pdf4 Nov 2024
Proforma of Agreement for saleFile: Rera Draft ( 2024 ) Blank Draft Corrected.pdf26 Oct 2024
Other - TechnicalFile: 2 Other - Technical (1).pdf19 Oct 2024
Copy of the legal title reportFile: tITLE SEARCH REPORT GRAVITY.pdf12 Oct 2024
Details of encumbrances concerned to FinanceFile: Declaration Finance encumbrances.pdf12 Oct 2024
Details of encumbrances concerned to FinanceFile: Declaration legal encumbrances.pdf12 Oct 2024
Proforma of Allotment letterFile: MODEL Draft Allotment letter as per rera.pdf12 Oct 2024
Other - LegalFile: Partnership Agreement.pdf12 Oct 2024
Declaration about Commencement CertificateFile: Declaration CC (1).pdf12 Oct 2024
CERSAI detailsFile: Declaration Cersai.pdf12 Oct 2024
Deviation Report with respect to Allotment letterFile: Declaration allotment deviation report.pdf12 Oct 2024
Details of encumbrances concerned to LegalFile: Declaration Finance encumbrances.pdf12 Oct 2024
Details of encumbrances concerned to LegalFile: Declaration legal encumbrances.pdf12 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Declaration agreement deviation report.pdf12 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Dinesh Tiwari_page-0001.pdf12 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclousre Nishant Patil_page-0001.pdf12 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclousre of secured unsecured funds new draft.pdf12 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 (3)gravity.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 gravity.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2 gravity.pdf11 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Gmail - CC Issued By collector Palghar On BPMS at Village Mahim Tah Palghar Order Date 15 15 May 2024
Other - TechnicalFile: Gmail - CC Issued By collector Palghar On BPMS at Village Mahim Tah Palghar Order Date 15 15 May 2024
Declaration in FORM BFile: FORM-B DEVELOPER.pdf14 Apr 2024
Building plan approvalFile: bBUilding paln Galaxy pride.pdf1 Apr 2024
Layout approvalFile: LAYOUT PLAN GALAXY PRIDE_compressed.pdf1 Apr 2024
PAN CardFile: Pan card Gravity Developers.pdf1 Apr 2024
PAN CardFile: GST Certificate.pdf1 Apr 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN GALAXY PRIDE_compressed.pdf1 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf1 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: bBUilding paln Galaxy pride.pdf1 Apr 2024

How this compares with Palghar

4%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GALAXY PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAHIM3,200+ in Palghar

2 kmGALAXY PRIDECompleted 94Lapsed / revoked 44Other 58Dot size: filed unitsN

Filed coordinates, straight-line distance. 196 registered projects within 2 km.

Builder: GRAVITY DEVELOPER

GRAVITY DEVELOPER has 2 registrations on MahaRERA, including GALAXY SUPREME and GALAXY PRIDE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if GALAXY PRIDE is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GALAXY PRIDE?

The registered promoter entity is GRAVITY DEVELOPER, a partnership as per the filing. Its GSTIN 27AAYFG7659M1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GALAXY PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GALAXY PRIDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GALAXY PRIDE?

The professionals named in the filing: Architect: VASTU SHILP; Architect: NISHANT P PATIL; Engineer: KS ENGINEERING SERVICES; Engineer: CENTRELINE ENGINEERS & CONSULTANTS; Chartered Accountant: NAYAN B GORE AND COMPANY; Chartered Accountant: NAYAN B GORE & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GALAXY PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GALAXY PRIDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GALAXY PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.