Home / Browse projects / Pune, Maharashtra / Gagan Tisha
Gagan Tisha
RG-MH-08908 · RERA P52100000351 · Last updated on MahaRERA portal: 12 Nov 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 48 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 28 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Gagan Tisha is a Residential / Group Housing project by Gagan Developers in Pune, Maharashtra, registered with MahaRERA as P52100000351 on 15 Jul 2017. Possession was promised by 31 Oct 2022 and is now 48 months past that date. The completion date has moved by 28 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameGagan Tisha
- TypeResidential / Group Housing
- Location
- Undri
- Haveli
- Pune
- 411060
- Pincode411060
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100000351
- ReraGenie IDRG-MH-08908
Builder
- NameGagan Developers
- Entity typePartnership
- PartnersRohit Sureshchand Garg, Sureshchand Suganchand Garg
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on15 Jul 2017
- Promised completion31 Oct 2022
- Revised completionRevised to 31 Oct 2022 (originally 30 Jun 2020)
- Buildings1 building record
- Documents filed141 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | NA | 12 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 97%.
A: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 97% |
| Sanitary Fittings within the flats / premises | 21% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 12 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 60% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 60% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 70% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed21
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Ganesh Vishnu Kad | UNDRI | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Arc Imran Shaikh |
| Engineer | Mr.Rajesh Mankani |
| Partner | Role in project |
|---|---|
| Gagan Developers | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1) We are the Promoters of the Real Estate Project known as “GAGAN TISHA” under implementation by us on land out of Survey No.18, Village Undri within the Registration Sub-District of Taluka Haveli, District Pune. You were kind enough to grant Registration of the said Project vide your Registration Certificate No. P52100000351 dated 15/07/2017. 2) In anticipation that we would complete the said Project on or before 30/06/2020, in our Application to you for Registration of our Project, we had mentioned the date of Completion as 30/06/2020. However, due to unforeseen and unexpected delays in the
Reason as filed by the promoter1) We are the Promoters of the Real Estate Project known as “GAGAN TISHA” under implementation by us on land out of Survey No.18, Village Undri within the Registration Sub-District of Taluka Haveli, District Pune. You were kind enough to grant Registration of the said Project vide your Registration Certificate No. P52100000351 dated 15/07/2017. 2) In anticipation that we would complete the said Project on or before 30/06/2021, in our Application to you for Registration of our Project, we had mentioned the date of Completion as 30/06/2021. However, due to the current pandemic (COVID19) Situatio
Reason as filed by the promoter1) We are the Promoters of the Real Estate Project known as “GAGAN TISHA” under implementation by us on land out of Survey No.18, Village Undri within the Registration Sub-District of Taluka Haveli, District Pune. You were kind enough to grant Registration of the said Project vide your Registration Certificate No. P52100000351 dated 15/07/2017. 2) In anticipation that we would complete the said Project on or before 30/06/2022, in our application to you for Registration of our Project, we had mentioned the date of Completion as 30/06/2022. However, due to unforeseen and unexpected delays in the
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000095845 | Manojkumar Rajendra Deore | Mr Rohit Sureshchand Garg & Promoters Gagan Developers | 23/11/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Jul 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jul 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Jan 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 24 Jul 2023
Documents filed141
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 141 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 12 Nov 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: GAGAN TISHA.pdf | 9 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Gagan Tisha.pdf | 22 Oct 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCC.pdf | 24 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 16 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 16 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 16 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Declaration.pdf | 10 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 14 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 14 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 14 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 14 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 14 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 14 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 14 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 14 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 14 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 14 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 14 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 14 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3.pdf | 14 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3.pdf | 14 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3.pdf | 14 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3.pdf | 14 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3.pdf | 14 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3.pdf | 14 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Gagan Tisha.pdf | 6 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: From 5.pdf | 30 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tisha Architect Certificate.pdf | 7 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tisha Engineer Certificate.pdf | 7 Sep 2021 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 6 Aug 2021 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 6 Aug 2021 |
| Layout approvalFile: 1-1.pdf | 24 Jul 2021 |
| Layout approvalFile: Layout.pdf | 24 Jul 2021 |
| Building plan approvalFile: Building Plan 1.pdf | 24 Jul 2021 |
| Building plan approvalFile: Building Plan 2.pdf | 24 Jul 2021 |
| Building plan approvalFile: Building Plan 3.pdf | 24 Jul 2021 |
| Building plan approvalFile: Building Plan 3.pdf | 24 Jul 2021 |
| Building plan approvalFile: Building Plan 4.pdf | 24 Jul 2021 |
| Building plan approvalFile: Building Plan 5.pdf | 24 Jul 2021 |
| Building plan approvalFile: Building Plan 6.pdf | 24 Jul 2021 |
| Building plan approvalFile: Building Plan 7.pdf | 24 Jul 2021 |
| Building plan approvalFile: Building Plan 8.pdf | 24 Jul 2021 |
| Building plan approvalFile: Building Plan 9.pdf | 24 Jul 2021 |
| Building plan approvalFile: Building Plan 10.pdf | 24 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: 1-1.pdf | 24 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 24 Jul 2021 |
| Building Plan Approval (IOD)File: Building Plan 1.pdf | 24 Jul 2021 |
| Building Plan Approval (IOD)File: Building Plan 2.pdf | 24 Jul 2021 |
| Building Plan Approval (IOD)File: Building Plan 3.pdf | 24 Jul 2021 |
| Building Plan Approval (IOD)File: Building Plan 3.pdf | 24 Jul 2021 |
| Building Plan Approval (IOD)File: Building Plan 4.pdf | 24 Jul 2021 |
| Building Plan Approval (IOD)File: Building Plan 5.pdf | 24 Jul 2021 |
| Building Plan Approval (IOD)File: Building Plan 6.pdf | 24 Jul 2021 |
| Building Plan Approval (IOD)File: Building Plan 7.pdf | 24 Jul 2021 |
| Building Plan Approval (IOD)File: Building Plan 8.pdf | 24 Jul 2021 |
| Building Plan Approval (IOD)File: Building Plan 9.pdf | 24 Jul 2021 |
| Building Plan Approval (IOD)File: Building Plan 10.pdf | 24 Jul 2021 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 24 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance.pdf | 24 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance.pdf | 24 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Sold booked inventory.pdf | 24 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf | 24 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: From 5 Gagan Tisha.pdf | 6 Feb 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf | 30 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 14 Aug 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 14 Aug 2020 |
| Certificates of CA (Form 3)File: Form 3.pdf | 14 Aug 2020 |
| Declaration in FORM BFile: Affidavit Cum Declaration.pdf | 25 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 25 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tisha Architect.pdf | 25 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 25 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 25 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 25 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 25 Feb 2020 |
| Certificates of CA (Form 3)File: Form 3.pdf | 25 Feb 2020 |
| Certificates of CA (Form 3)File: Form 3.pdf | 25 Feb 2020 |
| Certificates of CA (Form 3)File: Form 3.pdf | 25 Feb 2020 |
| Details of encumbrancesFile: Encumbrance Certificate 24-02-2020.pdf | 24 Feb 2020 |
| OtherFile: Index II.pdf | 24 Feb 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 141 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Gagan Tisha on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Undri13,700+ in Pune
Filed coordinates, straight-line distance. 224 registered projects within 2 km.
THE SPECTRUM
SHRIRAM PROPERTIES LIMITED
GANGA MILLENNIA UNDRI BUILDING J,K,L,M AND N
GOEL GANGA INDIA PVT LTD
NYATI ESTEBAN II
NYATI REALTORS LLP
Lodha Pune NIBM Project
Lodha Developers Limited
KHUSH VISTA
Elated Housing LLP
The Atrium
Arhumashtika Life Spaces
Builder: Gagan Developers
Gagan Developers has 1 registration on MahaRERA, including Gagan Tisha. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Gagan Tisha shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Gagan Tisha is delayed beyond 31 Oct 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Gagan Tisha?
The registered promoter entity is Gagan Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Gagan Tisha?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Gagan Tisha?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Gagan Tisha?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Gagan Tisha?
The professionals named in the filing: Architect: Arc Imran Shaikh; Engineer: Mr.Rajesh Mankani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Gagan Tisha?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback