Frenny Platinum Tower
RG-MH-29913 · RERA P99000029455 · Last updated on MahaRERA portal: 10 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Frenny Platinum Tower is a Residential / Group Housing project by Platinum Developers in Palghar, Maharashtra, registered with MahaRERA as P99000029455 on 29 May 2021. Possession is promised by 31 Dec 2026. 234 of the 236 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.
At a glance
Project
- NameFrenny Platinum Tower
- TypeResidential / Group Housing
- Location
- Sector - II
- Village Gokhiware
- Vasai East
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401208
- Pincode401208
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000029455
- ReraGenie IDRG-MH-29913
Builder
- NamePlatinum Developers
- Entity typePartnership
- PartnersMUSABBIR MOHAMMED AMIN DAYER, YASIR ISRAR KHAN, TARIQ FAROOQUE JATU, MASOOD AHMED ALI SAYED, GOUS MOHD AHMED ALI SAYYED
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 May 2021
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed104 files
Current status
Figures as on 10 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 16 | 15 | 110 | 8 | 118 |
| B WING | NA | 16 | 15 | 110 | 8 | 118 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 10 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 98%.
A WING81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
B WING81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 10 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 35% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed3
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A WING | 2 | 2 |
| B WING | 1 | 1 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Devendra Rajnikant Ladhani | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A WING | NA | Rs 16.92 cr | Rs 16.80 cr |
| B WING | NA | Rs 16.92 cr | Rs 16.80 cr |
| - | NA | Rs 6.22 cr | Rs 3.27 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sanat Mehta |
| Engineer | Jai Shree Krishna Consulting Engineers |
| Engineer | RAJESH KUMAR SHRIVASTAVA |
| Engineer | Mukesh Kumar |
| Engineer | DARAZ AJAZ JATU |
| Chartered Accountant | S Lakdawala & Associates |
| Chartered Accountant | MAA & Company |
| Partner | Role in project |
|---|---|
| Platinum Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 May 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Oct 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Oct 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed104
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Apr to Jun 2026.pdf | 10 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Apr to Jun 26.pdf | 10 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Apr to Jun 26.pdf | 10 Aug 2026 |
| Form 2A (FY 2025-2026)File: Form 2A 2025-26.pdf | 24 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Jan to Mar 26.pdf | 26 May 2026 |
| Withdrawal Update Form 2File: Form 2 Jan to Mar 26.pdf | 26 May 2026 |
| Withdrawal Update Form 3File: Form 3 Jan to Mar 26.pdf | 26 May 2026 |
| Withdrawal Update Form 1File: Form 1 Oct to Dec 25.pdf | 12 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Oct to Dec 25.pdf | 12 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 -Oct to Dec 25.pdf | 12 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Jul to Sep 2025.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 Jul to Sep 2025.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 Jul to Sep 2025.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Jul to Sep 2025.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Jul to Sep 2025.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Jul to Sep 2025.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Jul to Sep 25.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Jul to Sep 25.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Jul to Sep 25.pdf | 24 Feb 2026 |
| Form 5 (FY 2021-2022)File: Form 5 FY 2021-22.pdf | 1 Sep 2025 |
| Form 5 (FY 2022-2023)File: FORM 5 FY 2022-23.pdf | 1 Sep 2025 |
| Form 5 (FY 2023-2024)File: FORM 5 FY 2023-24.pdf | 1 Sep 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 FY 2024-25.pdf | 1 Sep 2025 |
| Form 1File: Form 1 Oct-24 to Dec-24.pdf | 14 Aug 2025 |
| Form 2File: Form 2 Oct-24 to Dec-24.pdf | 14 Aug 2025 |
| Form 3File: Form 3 Oct to Dec 2024.pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_Oct to Dec 24.pdf | 14 Aug 2025 |
| Form 1File: Form 1 Jan to March 25.pdf | 14 Aug 2025 |
| Form 2File: Platinum Form 2 jan to march 25.pdf | 14 Aug 2025 |
| Form 3File: Form 3 Jan to Mar 2025.pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold -Platinum Developers(jan to Mar 2025).pdf | 14 Aug 2025 |
| Form 1File: Form 1 Apr to Jun 25.pdf | 14 Aug 2025 |
| Form 2File: Form 2 Apr to Jun 25.pdf | 14 Aug 2025 |
| Form 3File: Form 3 April to June 2025_11zon.pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold -Platinum Developers (Apr to Jun 2025).pdf | 14 Aug 2025 |
| Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf | 14 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Platinum Developers_Form1_Apr Jun.pdf | 14 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Platinum Developers_Form1_Jul Sep.pdf | 14 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Platinum Developers Form 3 _11zon.pdf | 14 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Platinum developer_Oct to Dec 23.pdf | 14 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _11zon.pdf | 14 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: platinum developer _Apr to Jun 24 _11zon.pdf | 14 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Platinum Developer_Jul to Sep 24 _11zon.pdf | 14 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Platinum Developers_Form2_Apr Jun.pdf | 14 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Platinum Developers_Form2_Jul Sep.pdf | 14 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_Oct to Dec 23_11zon.pdf | 14 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_Jan to Mar 24_11zon.pdf | 14 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_Apr to Jun 24_11zon.pdf | 14 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_Jul to Sep 24_11zon.pdf | 14 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 20 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf | 3 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JAN MARCH 23.pdf | 26 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 APRIL JUNE 23.pdf | 26 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JULY SEP 23.pdf | 26 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 OCT DEC 23.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JAN MARCH 23.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 APRIL JUNE 23.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JULY SEP 23.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 OCT DEC 23.pdf | 26 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf | 26 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Platinum Form-2.pdf | 8 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Platinum FORM-1.pdf | 7 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Platinum Sold Unsold.pdf | 7 Dec 2023 |
| Building plan approvalFile: PLAN 1.pdf | 11 Oct 2021 |
| Layout approvalFile: PLAN 2.pdf | 11 Oct 2021 |
| Building plan approvalFile: PLAN 2.pdf | 11 Oct 2021 |
| Building plan approvalFile: PLAN 3.pdf | 11 Oct 2021 |
| Building plan approvalFile: PLAN 4.pdf | 11 Oct 2021 |
| Building plan approvalFile: PLAN 5.pdf | 11 Oct 2021 |
| Building plan approvalFile: PLAN 6.pdf | 11 Oct 2021 |
| Building plan approvalFile: PLAN 1.pdf | 11 Oct 2021 |
| Copy of Layout Approval (in case of layout)File: PLAN 2.pdf | 11 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 1.pdf | 11 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 2.pdf | 11 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 3.pdf | 11 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 4.pdf | 11 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 5.pdf | 11 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 6.pdf | 11 Oct 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 104 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Frenny Platinum Tower on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vasai East3,200+ in Palghar
Filed coordinates, straight-line distance. 88 registered projects within 2 km.
Suraksha Smart City - Phase I
Conceptual Advisory Services LLP
The Great Western Mumbai
HOABL Impactum Land Private Limited
Suraksha Smart City - Phase II
Conceptual Advisory Services LLP
Suraksha Smart City - Phase III
Conceptual Advisory Services LLP
Rashmi Star City Phase 2
Rashmi Realty Builders Pvt Ltd
Agarwal Sky Heights
Shreenath Realtors
See every Palghar project, with the district possession charts
Builder: Platinum Developers
Platinum Developers has 2 registrations on MahaRERA, including Frenny Platinum Tower and Platinum Nirvana. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if Frenny Platinum Tower is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Frenny Platinum Tower?
The registered promoter entity is Platinum Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Frenny Platinum Tower?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Frenny Platinum Tower?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Frenny Platinum Tower?
The professionals named in the filing: Architect: Sanat Mehta; Engineer: Jai Shree Krishna Consulting Engineers; Engineer: RAJESH KUMAR SHRIVASTAVA; Engineer: Mukesh Kumar; Engineer: DARAZ AJAZ JATU; Chartered Accountant: S Lakdawala & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Frenny Platinum Tower?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback