Home / Browse projects / Latur, Maharashtra / FOUR SEASONS

Registered No litigation declared Residential / Group Housing project

FOUR SEASONS

By NITINKUMAR VIJAYKUMAR NAWANDER

RG-MH-33119 · RERA P52400080591 · Last updated on MahaRERA portal: 22 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Latur registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
0 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 46 documents Report an error

FOUR SEASONS is a Residential / Group Housing project by NITINKUMAR VIJAYKUMAR NAWANDER in Latur, Maharashtra, registered with MahaRERA as P52400080591 on 16 Jun 2025. Possession is promised by 31 Dec 2031.

At a glance

Project

  • NameFOUR SEASONS
  • TypeResidential / Group Housing
  • Location
    • LATUR-AUSA HIGHWAY
    • OPPOSITE VATIKA HOTEL
    • Wasangaon
    • Latur
    • 413512
  • Pincode413512
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52400080591
  • ReraGenie IDRG-MH-33119

Builder

  • NameNITINKUMAR VIJAYKUMAR NAWANDER
  • Entity typeIndividual
  • GSTIN27ABAPN4344B3Z1
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJun 2025PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Jun 2025
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings4 building records
  • Documents filed46 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA90000
BUILDING BNA90000
BUILDING CNA80000
BUILDING DNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 22 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 0%.

BUILDING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed161

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots161
Closed/Covered161
BuildingClosed/CoveredTotal
BUILDING A4141
BUILDING B4141
BUILDING C4040
BUILDING D3939

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,075 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Jun 2025

Approvals and building plan

Permissible FSI14943.9
Proposed, not sanctioned12,944 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 2, SURVEY NO 33/5, KAHDGAON, DISTRICT-LATUR, MAHARASHTRA-413512

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMahesh Nawander
EngineerVijaykumar Balasaheb Ghodke
Chartered AccountantKishor Bharadiya & Co
PartnerRole in project
NITINKUMAR VIJAYKUMAR NAWANDER-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed46

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FS-Form-2A FY-25-26.pdf22 May 2026
Form 1File: Form-1 FS-QTR-1 25-26.pdf13 May 2026
Form 2File: Form-2 FS- QTR-1 25-26.pdf13 May 2026
Form 3File: 1 Annexure-D Form 3 FS QTR-1 25-26.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Four Season QTR-1.pdf13 May 2026
Form 1File: FS-FORM-1 FY-25-26 QTR-2.pdf21 Apr 2026
Form 2File: FS-FORM-2 FY-25-26 QTR-2.pdf21 Apr 2026
Form 3File: FS-FORM-3 FY-25-26 QTR-2.pdf21 Apr 2026
Disclosure of Sold and Booked InventoryFile: FS-SOLD AND UNSOLD BOOKED DISCLOSURE FY-25-26 QTR-2.pdf21 Apr 2026
Form 1File: FS-FORM-1 FY-25-26 QTR-3.pdf21 Apr 2026
Form 2File: FS-FORM-2 FY-25-26 QTR-3.pdf21 Apr 2026
Form 3File: FS-FORM-3 FY-25-26 QTR-3.pdf21 Apr 2026
Disclosure of Sold and Booked InventoryFile: FS-SOLD AND UNSOLD BOOKED DISCLOSURE FY-25-26 QTR-3.pdf21 Apr 2026
Form 1File: FS-FORM-1 FY-25-26 QTR-4.pdf21 Apr 2026
Form 2File: FS-FORM-2 FY-25-26 QTR-4.pdf21 Apr 2026
Form 3File: FS-FORM-3 FY-25-26 QTR-4.pdf21 Apr 2026
Disclosure of Sold and Booked InventoryFile: FS-SOLD AND UNSOLD BOOKED DISCLOSURE FY-25-26 QTR-4.pdf21 Apr 2026
Commencement Certificates / NA Order for plotted developmentFile: Gmail - π™²πš˜πš—πšπš’πš›πš–πšŠπšπš’πš˜πš— 𝚘𝚏 πšŒπš˜πš–πš–πšŽπš—πšŒπšŽπš–πšŽπš—πš π™²πšŽπš›πšπš’πšπš’πšŒπšŠπšπšŽ πš’πšœπšœπšžπšŽπš for four seasons.pdf2 May 2025
Other - FinanceFile: IMAGE SHOWING THE TOTAL BUITUP AREA WITH HEIGHLITED PORTION.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 four seasons.pdf17 Apr 2025
Layout approvalFile: Final Layout Plan 29-11-2024.pdf29 Mar 2025
Building plan approvalFile: four Seasons Approval dwg.pdf29 Mar 2025
PAN CardFile: Affidavit for name change with pan.pdf29 Mar 2025
Copy of the legal title reportFile: Legal Title Report Four Seasons merged.pdf29 Mar 2025
Details of encumbrances concerned to FinanceFile: four seasons declaration of legal finace encumbrance.pdf29 Mar 2025
Copy of Layout Approval (in case of layout)File: Final Layout Plan 29-11-2024.pdf29 Mar 2025
Proforma of Allotment letterFile: model form of allotment letter four seasons.pdf29 Mar 2025
Declaration in FORM BFile: Form B rera four seasons.pdf29 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 four seasons.pdf29 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 fours seasons.pdf29 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: four Seasons Letter.pdf29 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: four Seasons Approval dwg.pdf29 Mar 2025
Other - LegalFile: INDEX II.pdf29 Mar 2025
Other - LegalFile: ΰ€΅ΰ€Ύΰ€Έΰ€¨ΰ€—ΰ€Ύΰ€‚ΰ€΅_30_Satbara.pdf29 Mar 2025
Other - LegalFile: ΰ€΅ΰ€Ύΰ€Έΰ€¨ΰ€—ΰ€Ύΰ€΅ ΰ€Έΰ€°ΰ₯ΰ€΅ΰ₯‡ ΰ€¨ΰ€‚ 30 - ΰ€–ΰ€‚ΰ€‘ΰ€Ύΰ€—ΰ€³ΰ₯‡.pdf29 Mar 2025
Declaration about Commencement CertificateFile: four seasons declaration about commencement certificate.pdf29 Mar 2025
CERSAI detailsFile: four seasons cersai certificate.pdf29 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: four seasons format A bank details.pdf29 Mar 2025
Deviation Report with respect to Allotment letterFile: four seasons deviation of allotment letter.pdf29 Mar 2025
Details of encumbrances concerned to LegalFile: four seasons declaration of legal finace encumbrance.pdf29 Mar 2025
Other - TechnicalFile: four seasons annexure declaration cum undertaking.pdf29 Mar 2025
Deviation Report with respect to model copy of AgreementFile: four seasons deviations for agreement to sell.pdf29 Mar 2025
Proforma of Agreement for saleFile: Agreement to sell new.pdf29 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other real estate.pdf29 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank of Maharashtra RERA Format - B Account 4 Seasons.pdf29 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: disclosure of secured and unsecured finace.pdf29 Mar 2025

How this compares with Latur

10%of Latur projects moved their completion datethis one has not
31%of Latur registrations have lapsed or been cancelledthis one is on the register

Computed across the 150+ Latur projects on ReraGenie, from their own filings.

Keep FOUR SEASONS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OPPOSITE VATIKA HOTEL150+ in Latur

2 kmFOUR SEASONSCompleted 2Lapsed / revoked 1Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 9 registered projects within 2 km.

Builder: NITINKUMAR VIJAYKUMAR NAWANDER

NITINKUMAR VIJAYKUMAR NAWANDER has 2 registrations on MahaRERA, including Park Apartments and FOUR SEASONS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Latur district page.

Frequently asked questions

What are my rights if FOUR SEASONS is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FOUR SEASONS?

The registered promoter entity is NITINKUMAR VIJAYKUMAR NAWANDER, an individual as per the filing. Its GSTIN 27ABAPN4344B3Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FOUR SEASONS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for FOUR SEASONS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FOUR SEASONS?

The professionals named in the filing: Architect: Mahesh Nawander; Engineer: Vijaykumar Balasaheb Ghodke; Chartered Accountant: Kishor Bharadiya & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FOUR SEASONS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FOUR SEASONS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FOUR SEASONS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.