Completed No litigation declared Residential / Group Housing project

FOREST COUNTY-PH 3

By Ajanta Enterprises

RG-MH-34211 · RERA P52100017681 · Last updated on MahaRERA portal: 2 Nov 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Dec 2023Possession promisedregistration recorded completed
12 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 95%
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

FOREST COUNTY-PH 3 is a Residential / Group Housing project by Ajanta Enterprises in Near Eon IT park, 411014, registered with MahaRERA as P52100017681 on 4 Sep 2018. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameFOREST COUNTY-PH 3
  • TypeResidential / Group Housing
  • Location
    • 36 m wide DP road
    • Near Eon IT park
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100017681
  • ReraGenie IDRG-MH-34211

Builder

  • NameAjanta Enterprises
  • Entity typePartnership
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2018PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Sep 2018
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building WNA150000
Building NNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 95%.

Building W74%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building N80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities26

As on 2 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes8%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%
Water bodyYes100%
Tennis courtYes100%
Swimming pool with Kids pool and JacuzziYes100%
Squash CourtYes100%
Snack JointYes100%
Open air amphetheatreYes100%
Nana nani parkYes0%
Club house with Gym Aerobics Yoga Table Tennis Card carrom etcYes100%
Badminton Cum Mutlipurpose hallYes100%
Basket ball courtYes100%
Children play areaYes100%

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Open Space10
BuildingOpen SpaceTotal
Building W77
Building N33

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,520 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12384.96
Proposed, not sanctioned12,385 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEast Street, Camp , Pune 411001

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSatish Joshi
EngineerVastec Consultants and Engineers LLP
PartnerRole in project
Ajanta Enterprises-

Litigation declared1

CaseCourtStatus
SP/CIVIL NO 5586/2012/2005In The Court of Civil Judge Sr Div PuneSuit Is Pending For Apperance of Parties

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Aug 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Aug 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Sep 2023

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 FC PH 3 rev.pdf2 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Forest County Ph 3 March 2023.pdf28 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Forest County Ph 3 Mar 2023.pdf28 Sep 2023
Certificates of CA (Form 3)File: FORM 3 NandW Dated 30th June 2023.pdf28 Sep 2023
Certificates of CA (Form 3)File: FORM 3 NandW March 2023.pdf28 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FOREST EDGE PHASE 2 2023.pdf28 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2023 FOREST COUNTY PH 3.pdf28 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate FC PH 3 comp.pdf28 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Ajanta Enterprise N Bldg.pdf5 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Ajanta Enterprise W Bldg.pdf5 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Ajanta Enterprise N Bldg.pdf4 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Ajanta Enterprise W Bldg.pdf4 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FC Ph 3 Form 1 April 2019.pdf13 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FC Ph 3 form 1 April 2020.pdf13 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FC Ph 3 form 1 April 2021.pdf13 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FC Ph 3 form 1 April 2022.pdf13 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FC Ph 3 Sep 2022.pdf13 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FC Ph 3 Dec 2022.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FC Ph 3 Eng cert April 2019.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FC Ph 3 Eng cert April 2020.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FC Ph 3 Eng cert April 2021.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FC Ph 3 Eng Cert April 2022.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FC Ph 3 April 2022.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FC Ph 3 Sep 2022.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FC Ph 3 Dec 2022.pdf13 Feb 2023
Certificates of CA (Form 3)File: Form 3 FC Ph 3 April 2022.pdf13 Feb 2023
Certificates of CA (Form 3)File: Form 3 FC Ph 3 Sep 2022.pdf13 Feb 2023
Certificates of CA (Form 3)File: Form 3 FC Ph 3 Dec 2022.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Reg No P52100017681 form 5.pdf17 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 221014 Ajanta Enterprises Form 5 Rera Reg No P52100017681.pdf1 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Cert NandW.pdf9 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 16072022.pdf9 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Cert NandW.pdf9 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate 16072022.pdf9 Aug 2022
Certificates of CA (Form 3)File: Form 3 Rera N andW New.pdf9 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Cert NandW.pdf7 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Cert NandW.pdf7 Apr 2022
Certificates of CA (Form 3)File: Form 3 Rera N and W Newa.pdf25 Jan 2022
OtherFile: Disclosure of Inventory Ajanta Enterprise N Bldg 23072021.pdf18 Aug 2021
OtherFile: Disclosure of Inventory Ajanta Enterprise W Bldg 23072021.pdf18 Aug 2021
Certificates of CA (Form 3)File: Form 3 RERA-1-compressed.pdf15 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 RERA Phase 3-compressed.pdf15 Jun 2021
Details of Restarting of Construction work post lockdownFile: COVID 19 - LETTER.pdf24 Jul 2020
Certificates of CA (Form 3)File: Form 3 FC Ph 3.pdf4 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Forest County Ph 3 (Form5).pdf4 Dec 2019
Copy of the legal title reportFile: Tital search report by advocate.pdf31 Aug 2018
Building plan approvalFile: LAYOUT DWG.pdf27 Aug 2018
Layout approvalFile: LAYOUT DWG.pdf27 Aug 2018
Details of encumbrancesFile: Encumberance certificate for Sector 1 phase III.pdf27 Aug 2018
Copy of Layout Approval (in case of layout)File: LAYOUT DWG.pdf27 Aug 2018
Building Plan Approval (IOD)File: LAYOUT DWG.pdf27 Aug 2018
Commencement Certificates / NA Order for plotted developmentFile: COMMMENCEMENT CERTIFICATE.pdf27 Aug 2018
Declaration in FORM BFile: DECLARATION FORM B.pdf27 Aug 2018
Certificates of CA (Form 3)File: Ajanta RERA certificate Sec I Phase 3-revised1 (1).pdf27 Aug 2018
Proforma of Allotment letterFile: DECALARTION CERTFICATE FOR AGREEMENT.pdf27 Aug 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Forest CountyKharadi809CompletedDec 2017Apr 2017

Keep FOREST COUNTY-PH 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Eon IT park

2 kmFOREST COUNTY-PH 3Completed 42Lapsed / revoked 22Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 94 registered projects within 2 km.

Builder: Ajanta Enterprises

Ajanta Enterprises has 3 registrations on MahaRERA, including Forest Edge Phase 1 and FOREST COUNTY-PH 3. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if FOREST COUNTY-PH 3 is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FOREST COUNTY-PH 3?

The registered promoter entity is Ajanta Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FOREST COUNTY-PH 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for FOREST COUNTY-PH 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FOREST COUNTY-PH 3?

The professionals named in the filing: Architect: Satish Joshi; Engineer: Vastec Consultants and Engineers LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FOREST COUNTY-PH 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FOREST COUNTY-PH 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FOREST COUNTY-PH 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.