Home / Browse projects / Palghar, Maharashtra / FIA CONSTRUCTION COMPANY FIA ORION - GRANDE

Completed No litigation declared Others project

FIA CONSTRUCTION COMPANY FIA ORION - GRANDE

By NIMISH LAXMICHAND PASAD

RG-MH-90979 · RERA P99000032530 · Last updated on MahaRERA portal: 13 Aug 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 14 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
12 of 85Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

FIA CONSTRUCTION COMPANY FIA ORION - GRANDE is a Others project by NIMISH LAXMICHAND PASAD in Palghar, Maharashtra, registered with MahaRERA as P99000032530 on 10 Jan 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. 73 of the 85 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameFIA CONSTRUCTION COMPANY FIA ORION - GRANDE
  • TypeOthers
  • Location
    • PALGHAR
    • NAVALI PALGHAR
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000032530
  • ReraGenie IDRG-MH-90979

Builder

  • NameNIMISH LAXMICHAND PASAD
  • Entity typeIndividual
  • Named personNIMISH LAXMICHAND PASAD
  • Other registrations14 more →
  • Completed14 of 15
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

this monthRegisteredJan 2022PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Jan 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed74 files

Current status

86%73 of 85 units booked

Figures as on 13 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1 A and 1 BNA8870676
BUILDING NO -2 , WING CNA55819

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 13 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

BUILDING NO 1 A and 1 B82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO -2 , WING C82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed83

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots83
Closed/Covered33
Open Space50
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 1 A and 1 B293867
BUILDING NO -2 , WING C41216

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,770 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPALGHAR MUNICIPAL COUNCIL
Permissible FSI4343.5
Proposed, not sanctioned4,344 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJ B NAGAR,ANDHERI EAST

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectOAA ODYSSEY ARCHITECTS & ASSOCIATES D
EngineerSHAH & ASSOCIATES
Chartered AccountantPARADKAR AND ASSOCAITES
Chartered AccountantMUKESH V PATIL & CO
PartnerRole in project
NIMISH LAXMICHAND PASAD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Nov 2024

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: 1 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for13 Aug 2025
Occupational CertificateFile: FORM 4.pdf13 Aug 2025
Occupational CertificateFile: Fia_Orion Grande_RERA Verification mail from NP.pdf13 Aug 2025
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf29 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DATED 30092024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DATED 30092024.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: ilovepdf_merged (28)_compressed.pdf20 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - 2023-24.pdf7 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A -22-23.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 -compressed.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -orion grande_compressed.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DATED - 07042024_0001.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DATE 07042024_0001.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: ilovepdf_merged (18).pdf18 Apr 2024
Other - FinanceFile: Encumbrance Certificate.pdf9 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Merged sold unsold_compressed.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 orion grande_compressed.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DATED 03-10-2023_compressed.pdf14 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2, DATED 03-10-2023.pdf14 Oct 2023
Disclosure of sold/ booked inventoryFile: ilovepdf_merged.pdf14 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3, 3-10-2023_compressed.pdf14 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 fy 22-23 fia orion grande.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1, 08-07-23_compressed.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 08-07-23.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD MERGED.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ORION GRANDE_compressed.pdf13 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DATED 04042023_compressed.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: soldunsold merged.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DATED 04042023_compressed.pdf13 Apr 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD A,B,C FIA ORION GRANDE_merged.pdf22 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DATED 31-12-2022_compressed.pdf27 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DATED 31-12-2022.pdf27 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Orion Grande A Wing Oct to Dec 22.pdf27 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Orion Grande A Wing Oct to Dec 22.pdf27 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Orion Grande B Wing Oct to Dec 22.pdf27 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: ORION GRANDE (1).pdf23 Nov 2022
Details of encumbrancesFile: Orion Grande.pdf10 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ORION GRANDE.pdf7 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FIA ORION GRANDE ENGINEER CERTIFICATE.pdf29 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A - Orion Grande_0001.pdf29 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold - Orion Grande -A_0001.pdf29 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold - Orion Grande -B_0001.pdf29 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DATED 20-7-2022.pdf2 Aug 2022
Disclosure of sold/ booked inventoryFile: ORION GRANDE A WING.pdf26 Jul 2022
Disclosure of sold/ booked inventoryFile: ORION GRANDE B WING.pdf26 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ORION GRANDE_compressed.pdf20 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DATED 18-4-2022.pdf18 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_200226367439_For_Asset_Based_Search_22_12_2021_11_48_12_627 (1).pdf22 Dec 2021
Layout approvalFile: Layout plan PDF.pdf15 Dec 2021
Copy of the legal title reportFile: LEGAL TITLE REPORT_0001_compressed (1).pdf15 Dec 2021
Copy of Layout Approval (in case of layout)File: Layout plan PDF.pdf15 Dec 2021
CERSAI detailsFile: DECLARATION OF CERSAI.pdf15 Dec 2021
Building plan approvalFile: approval plan FOR BLDG NO 2C.pdf11 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: approval plan FOR BLDG NO 2C.pdf11 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fia Grande.pdf10 Dec 2021
Declaration about Commencement CertificateFile: DECLARATION OF CC.pdf9 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed.pdf9 Dec 2021
Proforma of Allotment letterFile: DRAFT AGREEMENT.pdf8 Dec 2021
Proforma of Allotment letterFile: PROFORMA OF ALLOTMENT LETTER.pdf8 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_0001_compressed.pdf7 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: Form - B_0001_compressed.pdf4 Dec 2021
Declaration in FORM BFile: Form - B_0001_compressed.pdf4 Dec 2021
Building plan approvalFile: approval plan 3 - Copy.pdf3 Dec 2021
Building plan approvalFile: Approval plan FORM BLDG NO 1 B.pdf3 Dec 2021
PAN CardFile: Nimish sir Pan Card.pdf3 Dec 2021
Details of encumbrancesFile: LETTER OF ENCUMBRANCES.pdf3 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: approval plan 3 - Copy.pdf3 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: Approval plan FORM BLDG NO 1 B.pdf3 Dec 2021

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
FIA REGENCY - AMahim Road Palghar West8CompletedJun 2022Feb 2021
FIA EMERALDS NO 826 PLOT NO 43 VILLAGE MAHIM PALGHAR18CompletedDec 2021Jan 2019
FIA IMPERIAMahim Road Palghar West32CompletedApr 2021Nov 2019
FIA PRIDES NO 826 PLOT NO 123 NR SUNDRAM SCHOOL PALGHAR12CompletedDec 2018Dec 2017
FIA DAFFODILSS NO 831-2 PLOT NO 18 NR SUNDARAM SCHOOL PALGHAR24CompletedDec 2018Feb 2018
FIA ORCHIDPLOT NO 120 S N 826 NEAR SUNDARAM SCHOOL PALGHAR26CompletedMar 2016Feb 2016
FIA PRANGANPLOT NO 31 S N 826 NEAR SUNDARAM SCHOOL PALGHAR13CompletedDec 2014Late, Mar 2015
FIA PRATHAMPLOT NO 41 S N 826 NEAR SUNDARAM SCHOOL MAHIM ROAD PALGHAR11CompletedDec 2013Oct 2013

How this compares with Palghar

86%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FIA CONSTRUCTION COMPANY FIA ORION - GRANDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAVALI PALGHAR3,200+ in Palghar

2 kmFIA CONSTRUCTION COMPANYCompleted 123Lapsed / revoked 57Other 137Dot size: filed unitsN

Filed coordinates, straight-line distance. 317 registered projects within 2 km.

Builder: NIMISH LAXMICHAND PASAD

NIMISH LAXMICHAND PASAD has 15 registrations on MahaRERA, including FIA CONSTRUCTION COMPANY - FIA PRIDE and FIA EMERALD. Its filings disclose 8 earlier MahaRERA projects: declares 7 of 8 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if FIA CONSTRUCTION COMPANY FIA ORION - GRANDE is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FIA CONSTRUCTION COMPANY FIA ORION - GRANDE?

The registered promoter entity is NIMISH LAXMICHAND PASAD, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FIA CONSTRUCTION COMPANY FIA ORION - GRANDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for FIA CONSTRUCTION COMPANY FIA ORION - GRANDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FIA CONSTRUCTION COMPANY FIA ORION - GRANDE?

The professionals named in the filing: Architect: OAA ODYSSEY ARCHITECTS & ASSOCIATES D; Engineer: SHAH & ASSOCIATES; Chartered Accountant: PARADKAR AND ASSOCAITES; Chartered Accountant: MUKESH V PATIL & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FIA CONSTRUCTION COMPANY FIA ORION - GRANDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FIA CONSTRUCTION COMPANY FIA ORION - GRANDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FIA CONSTRUCTION COMPANY FIA ORION - GRANDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.