Home / Browse projects / Mumbai Suburban, Maharashtra / FAIRMONT

Registered No litigation declared Residential / Group Housing project

FAIRMONT

By TRIDENT OZONE LLP

RG-MH-28025 · RERA P51800024818 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 10.00 crore secured on the land, in favour of AU Small Finance Bank Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
13 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 95%
102 of 211Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 146 documents Report an error

FAIRMONT is a Residential / Group Housing project by TRIDENT OZONE LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800024818 on 9 Mar 2020. Possession is promised by 30 Dec 2026. 109 of the 211 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete.

At a glance

Project

  • NameFAIRMONT
  • TypeResidential / Group Housing
  • Location
    • JANGAL MANGAL ROAD
    • BHANDUP WEST
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800024818
  • ReraGenie IDRG-MH-28025

Builder

  • NameTRIDENT OZONE LLP
  • Entity typePartnership
  • PartnersRANDHIR SHIVRAM SINGH, SHARDADEVI SHIVRAM SINGH, SACHIN SHIVRAM SINGH, KAIVAYLYA CHETAN SHAH, CHETAN RAMNIKLAL SHAH
  • Other registrations1 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2020PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Mar 2020
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed146 files

Current status

52%109 of 211 units booked
94.5%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING B SALENA24221181119
WING A REHABNA2422781492

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 95%.

WING B SALE64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
WING A REHAB82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes70%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes50%
Open ParkingNoNot applicable

Parking filed44

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots44
Closed/Covered44
BuildingClosed/CoveredTotal
WING B SALE2323
WING A REHAB2121

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,633 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAU Small Finance Bank Ltd
Secured amountRs 10.00 crore
Declared on23 May 2025

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI11833.32
Proposed, not sanctioned5,917 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 16, GROUND FLOOR, KANAKIA ZILLION,LBS CST ROAD, JUNCTION, BKC ANNEXE, KURLA WEST, MUMBAI 40
Estimated costRs 32.92 cr
Cost incurredRs 31.12 cr
Work done94.53%
BuildingWingEstimatedIncurred
WING B SALENARs 16.88 crRs 16.88 cr
WING A REHABNARs 14.24 crRs 14.24 cr
-NARs 1.80 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHEETAL NIKHARE
EngineerMR SHASHANK RATHOD Rathod
Chartered AccountantMS CHIRAG DOSHI & CO
Chartered AccountantAshwin Shah
Chartered AccountantNehal Mitul Faria
PartnerRole in project
TRIDENT OZONE LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed146

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 146 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form -1 fm.pdf12 May 2026
Withdrawal Update Form 1File: form -1 fm.pdf12 May 2026
Withdrawal Update Form 2File: Form 2 M26 PH.pdf12 May 2026
Withdrawal Update Form 2File: Form 2 M26 PH.pdf12 May 2026
Withdrawal Update Form 3File: Form 3 M26 FM (1).pdf12 May 2026
Withdrawal Update Form 3File: Form 3 M26 FM (1).pdf12 May 2026
Withdrawal Update Form 1File: Form -1 Dec 25 FM.pdf26 Feb 2026
Withdrawal Update Form 2File: Form -2 Dec 25 FM.pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3 Dec 25 -FM.pdf26 Feb 2026
Withdrawal Update Form 1File: form 1.pdf17 Jan 2026
Withdrawal Update Form 2File: form 2 s.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3 (3).pdf17 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 24-25 FM.pdf19 Jul 2025
Form 2A (FY 2024-2025)File: FORM 2A FM.pdf9 Jul 2025
Form 1File: Form 1 June 24.pdf4 Jun 2025
Form 2File: Form 2 June 24.pdf4 Jun 2025
Form 3File: Form 3 - June 24.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold June 24.pdf4 Jun 2025
Form 1File: Form 1 Sep 24.pdf4 Jun 2025
Form 2File: Form 2 Sep 24.pdf4 Jun 2025
Form 3File: Form 3 - Sep 24.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Sep 24.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Dec 24.pdf4 Jun 2025
Form 1File: Form 1 Dec 24.pdf4 Jun 2025
Form 2File: Form 2 Dec 24.pdf4 Jun 2025
Form 3File: Form 3 - Dec 24.pdf4 Jun 2025
Form 1File: Form 1 Mar 25.pdf4 Jun 2025
Form 2File: Form 2 Mar 25.pdf4 Jun 2025
Form 3File: Form 3 - Mar 25.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Mar 25.pdf4 Jun 2025
Form 1File: Form 1 Ma 24.pdf4 Jun 2025
Form 2File: Form 2 Mar 24.pdf4 Jun 2025
Form 3File: Form 3 - Mar 24.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Mar 24.pdf4 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf30 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1.pdf14 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5.pdf17 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM5.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (3).pdf17 Feb 2023
Disclosure of sold/ booked inventoryFile: SOLD.pdf14 Feb 2023
Disclosure of sold/ booked inventoryFile: SOLD.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3.pdf10 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf8 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf8 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf18 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf18 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (2).pdf18 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (1).pdf18 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM2A.pdf18 Jan 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD -FM.pdf18 Jan 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD FM.pdf18 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (2).pdf18 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (3).pdf18 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf29 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1.pdf29 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1.pdf29 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf29 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2.pdf29 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf29 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf29 Aug 2022
CERSAI detailsFile: PLATINUM TRIDENT OZONE CERSAI.pdf21 Dec 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: FM SOCIETY.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5.pdf29 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2 A.pdf22 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2 A.pdf22 Sep 2021
Declaration about Commencement CertificateFile: DECLARATION C-C.pdf7 Sep 2021
Disclosure of sold/ booked inventoryFile: FAIRMONT SOLD UNSOLD SHEET_compressed.pdf7 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: FM C-C -2.pdf1 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf1 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf1 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf1 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FAIRMONT FORM 3.pdf1 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf1 Sep 2021
Proforma of Allotment letterFile: REVISED FAIRMONT DRAFT OF SALE AGREEMENT WITH PARKING.pdf17 Jun 2021
Details of encumbrancesFile: FAIRMONT ENCUM.pdf29 Apr 2021
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf27 Oct 2020
Proforma of Allotment letterFile: final - AGREEMENT FOR SALE- (RERA) cts 110 (1).pdf27 Oct 2020
Layout approvalFile: HPSC2108.pdf24 Feb 2020
Layout approvalFile: HPSC2109.pdf24 Feb 2020

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationRegisteredStatusPromisedDelivered
CELESTIALP51800001768KURLA, Mumbai SuburbanJul 2017Certificate SignedDec 2024Sep 2023
Shivsharda CHS LtdP51800005627Kurla, Mumbai SuburbanAug 2017Certificate SignedDec 2021Registered original: Dec 2019Late, Nov 2022

How this compares with Mumbai Suburban

52%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FAIRMONT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHANDUP WEST6,700+ in Mumbai Suburban

2 kmFAIRMONTCompleted 43Lapsed / revoked 14Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 73 registered projects within 2 km.

Builder: TRIDENT OZONE LLP

TRIDENT OZONE LLP has 2 registrations on MahaRERA, including PLATINUM HEIGHTS and FAIRMONT. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if FAIRMONT is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FAIRMONT?

The registered promoter entity is TRIDENT OZONE LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FAIRMONT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for FAIRMONT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FAIRMONT?

The professionals named in the filing: Architect: SHEETAL NIKHARE; Engineer: MR SHASHANK RATHOD Rathod; Chartered Accountant: MS CHIRAG DOSHI & CO; Chartered Accountant: Ashwin Shah; Chartered Accountant: Nehal Mitul Faria. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FAIRMONT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FAIRMONT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FAIRMONT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.