ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / CELESTIAL

Completed No litigation declared Others project

CELESTIAL

By SU SHARDA EDIFICE LLP

RG-MH-10371 · RERA P51800001768 · Last updated on MahaRERA portal: 22 Jan 2024

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
30 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 98%
2Complaints at MahaRERAon this registration
Jump to the 134 documents Report an error

CELESTIAL is a Others project by SU SHARDA EDIFICE LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001768 on 29 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2024. 2 complaints are on record with the regulator.

At a glance

Project

  • NameCELESTIAL
  • TypeOthers
  • Location
    • KURLA
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800001768
  • ReraGenie IDRG-MH-10371

Builder

  • NameSU SHARDA EDIFICE LLP
  • Entity typePartnership
  • PartnersRANDHIR SHIVRAM SINGH, SACHIN SHIVRAM SINGH, SHARDADEVI SHIVRAM SINGH, SHRIKANT RAMCHANDRA DEOLE, SUNIL RAMCHANDRA DEOLE, NITESH RAJHANS SINGH

Key dates

this monthRegisteredJul 2017PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed134 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Celestial WING ANA250000
Celestial WING BNA250000
Celestial Wing CNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 22 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 98%.

Celestial WING A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Celestial WING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Celestial Wing C99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed280

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots280
Closed/Covered280
BuildingClosed/CoveredTotal
Celestial WING A9090
Celestial WING B9595
Celestial Wing C9595

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,692 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI15518.64
Proposed, not sanctioned9,299 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 16 KANAKIA ZILLION KURLA JUNDCTION MUMBAI 400070

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUNIL RAMCHANDRA DEOLE
EngineerCREATIVE COMPANY SOLUTIONS
Chartered AccountantPORWAL & PORWAL llp
PartnerRole in project
SU SHARDA EDIFICE LLP-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000079292Mr. Kumar GowdaM/s. Su Sharda Edifice LLP17/05/2019
CC006000000079276Pallipuram Raman KrishnanM/s. Su Sharda Edifice LLP17/05/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Nov 2023

Documents filed134

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 134 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: FORM 3.pdf22 Jan 2024
Certificates of CA (Form 3)File: FORM 3.pdf22 Jan 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 (2).pdf23 Nov 2023
Building plan approvalFile: OC PLAN-1.pdf20 Nov 2023
Building plan approvalFile: OC PLAN-2.pdf20 Nov 2023
Building plan approvalFile: OC PLAN-3.pdf20 Nov 2023
Building plan approvalFile: OC PLAN-4.pdf20 Nov 2023
Building plan approvalFile: OC PLAN-5.pdf20 Nov 2023
Building plan approvalFile: OC PLAN-6.pdf20 Nov 2023
Building plan approvalFile: OC PLAN-6.pdf20 Nov 2023
Building plan approvalFile: OC PLAN-7.pdf20 Nov 2023
Building plan approvalFile: OC PLAN-8.pdf20 Nov 2023
Building Plan Approval (IOD)File: OC PLAN-1.pdf20 Nov 2023
Building Plan Approval (IOD)File: OC PLAN-2.pdf20 Nov 2023
Building Plan Approval (IOD)File: OC PLAN-3.pdf20 Nov 2023
Building Plan Approval (IOD)File: OC PLAN-4.pdf20 Nov 2023
Building Plan Approval (IOD)File: OC PLAN-5.pdf20 Nov 2023
Building Plan Approval (IOD)File: OC PLAN-6.pdf20 Nov 2023
Building Plan Approval (IOD)File: OC PLAN-6.pdf20 Nov 2023
Building Plan Approval (IOD)File: OC PLAN-7.pdf20 Nov 2023
Building Plan Approval (IOD)File: OC PLAN-8.pdf20 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: O C CFT.pdf20 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf19 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1.pdf19 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2.pdf19 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGC.pdf14 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG.pdf14 Feb 2023
Disclosure of sold/ booked inventoryFile: SOLD.pdf14 Feb 2023
Disclosure of sold/ booked inventoryFile: SOLD.pdf14 Feb 2023
Disclosure of sold/ booked inventoryFile: SOLD.pdf14 Feb 2023
Disclosure of sold/ booked inventoryFile: SOLD.pdf14 Feb 2023
Disclosure of sold/ booked inventoryFile: SOLD.pdf14 Feb 2023
Disclosure of sold/ booked inventoryFile: SOLD.pdf14 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 (2).pdf8 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 (2).pdf8 Feb 2023
Details of encumbrancesFile: RERA ENCUMBRANCE CERTIFICATE.pdf22 Sep 2022
CERSAI detailsFile: SU SHARDA CERSAI.pdf21 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 30 9 2021.pdf9 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 30 9 2021.pdf9 Oct 2021
Certificates of CA (Form 3)File: CA Certificate 30 9 2021.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A 31 3 2020_.pdf23 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 31 3 2021_.pdf23 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SIGNED RERA FORM 5 CELESTIAL.pdf8 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: SIGNED RERA FORM 5 CELESTIAL 2020.pdf8 Sep 2021
Declaration about Commencement CertificateFile: Format D.pdf3 Sep 2021
Disclosure of sold/ booked inventoryFile: Wing A.pdf2 Sep 2021
Disclosure of sold/ booked inventoryFile: Wing B.pdf2 Sep 2021
Disclosure of sold/ booked inventoryFile: Wing C.pdf2 Sep 2021
Building plan approvalFile: Latest Amended Plan page 1-2.pdf17 Aug 2021
Building plan approvalFile: Latest Amended Plan page 3-4.pdf17 Aug 2021
Building plan approvalFile: Latest Amended Plan page 5.pdf17 Aug 2021
Building Plan Approval (IOD)File: Latest Amended Plan page 1-2.pdf17 Aug 2021
Building Plan Approval (IOD)File: Latest Amended Plan page 3-4.pdf17 Aug 2021
Building Plan Approval (IOD)File: Latest Amended Plan page 5.pdf17 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf17 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf17 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf17 Aug 2021
Certificates of CA (Form 3)File: Form 3.pdf17 Aug 2021
Certificates of CA (Form 3)File: Form 3.pdf17 Aug 2021
Certificates of CA (Form 3)File: Form 3.pdf17 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: New CC.pdf14 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2238541_OC_signed.pdf11 Jul 2020
Building plan approvalFile: Amended Plan -1.pdf20 Feb 2019
Building plan approvalFile: Amended Plan-2.pdf20 Feb 2019
Building plan approvalFile: Amended Plan-3.pdf20 Feb 2019
Building plan approvalFile: Amended Plan-4.pdf20 Feb 2019
Building plan approvalFile: Amended Plan-5.pdf20 Feb 2019
Building Plan Approval (IOD)File: Amended Plan -1.pdf20 Feb 2019
Building Plan Approval (IOD)File: Amended Plan-2.pdf20 Feb 2019
Building Plan Approval (IOD)File: Amended Plan-3.pdf20 Feb 2019
Building Plan Approval (IOD)File: Amended Plan-4.pdf20 Feb 2019
Building Plan Approval (IOD)File: Amended Plan-5.pdf20 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: Commecement Certificate.pdf20 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf20 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf20 Feb 2019
Certificates of CA (Form 3)File: Form 3 Celestial.pdf20 Feb 2019
Certificates of CA (Form 5)File: Form 5 Susharda Edificellp.pdf6 Oct 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: DECLARATION FOR SOCIETY.pdf30 Mar 2018
Status of ConveyanceFile: DECLARATION FOR CONVEYANCE.pdf30 Mar 2018
Status of ConveyanceFile: DECLARATION FOR CONVEYANCE.pdf30 Mar 2018

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CELESTIAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KURLA6,700+ in Mumbai Suburban

2 kmCELESTIALCompleted 163Lapsed / revoked 140Other 178Dot size: filed unitsN

Filed coordinates, straight-line distance. 481 registered projects within 2 km.

Builder: SU SHARDA EDIFICE LLP

SU SHARDA EDIFICE LLP has 1 registration on MahaRERA, including CELESTIAL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if CELESTIAL is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CELESTIAL?

The registered promoter entity is SU SHARDA EDIFICE LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CELESTIAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against CELESTIAL?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for CELESTIAL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CELESTIAL?

The professionals named in the filing: Architect: SUNIL RAMCHANDRA DEOLE; Engineer: CREATIVE COMPANY SOLUTIONS; Chartered Accountant: PORWAL & PORWAL llp. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CELESTIAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CELESTIAL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CELESTIAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.