ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / EVA D BUILDING

Registration lapsed No litigation declared Residential / Group Housing project

EVA D BUILDING

By M/S KARAN SANRAN ASSOCIATES

RG-MH-11088 · RERA P52100002477 · Last updated on MahaRERA portal: 11 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • Completion date moved by 20 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
40 of 40Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 132 documents Report an error

EVA D BUILDING is a Residential / Group Housing project by M/S KARAN SANRAN ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100002477 on 1 Aug 2017. Possession was promised by 31 Dec 2024 and is now 22 months past that date. The completion date has moved by 20 months from the original filing. 0 of the 40 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameEVA D BUILDING
  • TypeResidential / Group Housing
  • Location
    • Pune Banglore Highway
    • Bavdhan Bk
    • Bavadhan BK
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100002477
  • ReraGenie IDRG-MH-11088

Builder

  • NameM/S KARAN SANRAN ASSOCIATES
  • Entity typeOthers
  • PartnerM/S ANSHUL KARAN DEVELOPMENT CORPORATION M/S ANSHUL KARAN DEVELOPMENT CORPORATION
  • Named personsRAJESHRI CONSTRUCTION THROUGH ITS PROPRIETOR DEEPAK VILASRAO JAGTAP, ANSHUL PROMOTERS AND DEVELOPERS PRIVATE LIMITED
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

22 months past promisethis monthRegisteredAug 2017First promiseApr 2023Revised toDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Aug 2017
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 30 Apr 2023)
  • Buildings1 building record
  • Documents filed132 files

Current status

0%0 of 40 units booked

Figures as on 11 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D BUILDINGNA141040040

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

D BUILDING: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered40

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area502 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Dec 2025
LandownerVillageDistrict
ARUN SAMPATRAO PATILPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE METROPOLITIAN REGION DEVELOPMENT AUTHORITY
Permissible FSI6823.47
Proposed, not sanctioned3,839 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHANDARKAR ROAD PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTANISQA ARCHITECTS & PLANNERS
EngineerVILAS KUDALE
Chartered AccountantNITESH M SHAH & CO
PartnerRole in project
M/S KARAN SANRAN ASSOCIATES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019683Apr 2023 → Dec 2024

Reason as filed by the promoterDeveloper has completed 100% work of said project and only formality to obtain completion/occupancy from PMRDA is remaining, which the developer shall obtain within the said applied extended time.

EXT52100015192Apr 2023 → Apr 2024

Reason as filed by the promoterThat the Developer has completed all the formalities and have also applied for obtaining Completion Certificate from PMRDA officials and have inward the same but due to force majure and pandemic in the year 2020-2021, the developer will not be able to obtain the Completion Certificate before 30/04/2023 and hence the developer has applied for extension of said project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed132

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 132 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: AC_EvaD_Sept17.pdf11 Jul 2026
Form 2File: EC_EvaD_Sept17.pdf11 Jul 2026
Form 3File: CA_EvaD_Sept17.pdf11 Jul 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory - Ela-D_Sept17.pdf11 Jul 2026
Form 1File: AC_EvaD_Dec17.pdf11 Jul 2026
Form 2File: EC_EvaD_Dec17.pdf11 Jul 2026
Form 3File: CA_EvaD_Dec17.pdf11 Jul 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory - Ela-D_Dec17.pdf11 Jul 2026
Form 1File: AC Eva D_March18.pdf11 Jul 2026
Form 2File: EC_ Eva D_Sept18.pdf11 Jul 2026
Form 3File: CA_Eva D_March18.pdf11 Jul 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory - Ela-D_March18.pdf11 Jul 2026
Form 1File: AC_EvaD_June18.pdf11 Jul 2026
Form 2File: EC_EvaD_June18.pdf11 Jul 2026
Form 3File: CA_EvaD_June18.pdf11 Jul 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory - Ela-D_June18.pdf11 Jul 2026
Form 1File: AC_EvaD_Sept18.pdf11 Jul 2026
Form 2File: EC_EvaD_Sept18.pdf11 Jul 2026
Form 3File: CA_EvaD_Sept18.pdf11 Jul 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory - Ela-D_Sept18.pdf11 Jul 2026
Form 1File: AC_EvaD_Dec18.pdf11 Jul 2026
Form 2File: EC_EvaD_Dec18.pdf11 Jul 2026
Form 3File: CA_EvaD_Dec18.pdf11 Jul 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory - Ela-D_Dec18.pdf11 Jul 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_EvaD_March25.pdf3 May 2025
Certificates of CA (Form 3)File: CA_EvaD_March25.pdf3 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_EvaD_March25.pdf3 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_EvaD_Dec2024.pdf15 Feb 2025
Certificates of CA (Form 3)File: CA_EvaD_Dec2024.pdf15 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_EvaD_Dec24.pdf15 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_EvaD_Sept24.pdf30 Dec 2024
Certificates of CA (Form 3)File: CA_EvaD_Sept24.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_EvaD_Sept24.pdf29 Nov 2024
Certificates of CA (Form 3)File: CA_EvaD_March24.pdf9 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_EvaD_March24.pdf12 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_EvaD_March24.pdf12 Jul 2024
Declaration in FORM BFile: Form B KSA EVA D.pdf9 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_EvaD_March24.pdf9 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-2022-23.pdf9 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-2023-24.pdf9 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Eva-D_Form5_2022_23.pdf29 Mar 2024
Certificates of CA (Form 3)File: CA_EvaD_Dec23.pdf21 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_EvaD_Sept23.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_EvaD_Dec-23.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_EvaD_Dec23.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_EvaD_Sept23.pdf26 Dec 2023
Certificates of CA (Form 3)File: CA_EvaD_Sept23.pdf26 Dec 2023
Certificates of CA (Form 3)File: CA_EvaD_March23_page-0001.pdf25 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_EvaD_March23.pdf26 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_EvaD_March23.pdf26 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form5_EvaD_18-19.pdf24 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form5_EvaD_19-20.pdf24 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5_EvaD_20-21.pdf24 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5_EvaD_21-22.pdf24 Apr 2023
Declaration about Commencement CertificateFile: Declaration_CC.pdf21 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A_Engineer Cert.pdf21 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold_Unsold Inventory.pdf21 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_EvaD_Dec22.pdf4 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_EvaD_Dec22.pdf4 Mar 2023
Certificates of CA (Form 3)File: CA_EvaD_Dec22.pdf4 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_EvaD_Sept22.pdf3 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_EvaD_Sept22.pdf3 Jan 2023
Certificates of CA (Form 3)File: CA_EvaD_Sept22.pdf3 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_EvaD_June2022.pdf26 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_EvaD_June2022.pdf26 Sep 2022
Certificates of CA (Form 3)File: CA_EvaD_June22.pdf26 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_EvaD_March22.pdf20 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_EvaD_March22.pdf20 May 2022
Certificates of CA (Form 3)File: CA_EvaD_March22.pdf19 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_EvaD_Dec21.pdf31 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_Cert.pdf30 Mar 2022
Certificates of CA (Form 3)File: CA_EvaD_Dec_2021.pdf24 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_EvaD_Dec21.pdf5 Feb 2022
Certificates of CA (Form 3)File: CA_EvaD_Sept21.pdf4 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_EvaD_Sept21.pdf15 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_EvaD_Sept21.pdf15 Nov 2021
Certificates of CA (Form 3)File: CA_EvaD_June21.pdf20 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_EvaD_June21.pdf16 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_EvaD_June21.pdf15 Jul 2021
Certificates of CA (Form 3)File: CA_EvaD_MArch21_compressed.pdf17 Apr 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
EVA B BUILDINGSURVEY NO 7 BAVDHAN BUDRUK TALUKA MULSHI DISTRICT PUNE59CompletedFeb 2016Late, Jul 2017
EVA A BUILDINGSURVEY NO 7 BAVDHAN BUDRUK TALUKA MULSHI DISTRICT PUNE65CompletedFeb 2015Late, Jun 2016

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 20 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EVA D BUILDING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bavdhan Bk13,700+ in Pune

2 kmEVA D BUILDINGCompleted 6Lapsed / revoked 5Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: M/S KARAN SANRAN ASSOCIATES

M/S KARAN SANRAN ASSOCIATES has 3 registrations on MahaRERA, including EVA C BUILDING and EVA D BUILDING. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that EVA D BUILDING shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if EVA D BUILDING is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EVA D BUILDING?

The registered promoter entity is M/S KARAN SANRAN ASSOCIATES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EVA D BUILDING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EVA D BUILDING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EVA D BUILDING?

The professionals named in the filing: Architect: TANISQA ARCHITECTS & PLANNERS; Engineer: VILAS KUDALE; Chartered Accountant: NITESH M SHAH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EVA D BUILDING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EVA D BUILDING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EVA D BUILDING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.