MARS WING-C

By Sun City Housing

RG-MH-33115 · RERA P51800080587 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 175.00 crore secured on the land, in favour of Aditya Birla Finance Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2030Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Stilt Floor, 97%
206 of 206Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

MARS WING-C is a Others project by Sun City Housing in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800080587 on 16 Jun 2025. Possession is promised by 31 Mar 2030. 0 of the 206 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameMARS WING-C
  • TypeOthers
  • Location
    • JVLR Road
    • Hariyali East- Powai
    • Hariyali
    • Kurla
    • Mumbai Suburban
    • 400076
  • Pincode400076
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800080587
  • ReraGenie IDRG-MH-33115

Builder

  • NameSun City Housing
  • Entity typePartnership

Key dates

this monthRegisteredJun 2025PromisedMar 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Jun 2025
  • Promised completion31 Mar 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Current status

0%0 of 206 units booked
18.9%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No-4 Wing CNA14142060206

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 97%.

Building No-4 Wing C: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)37%
Plinth100%
Stilt Floor97%
Slabs of Super Structure3%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area620 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Finance Ltd
Secured amountRs 175.00 crore
CERSAI search filedYes
Declared on28 May 2026
LandownerVillageDistrict
Ushakiran Hirendra SinghPowaiMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI21176.28
Proposed, not sanctioned1,052 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Kailash Plaza, Final Plot 355, Vallabh Baug Lane, Opp. Odeon Cinema, Ghatkopar East, Mumbai.400077
Estimated costRs 144.54 cr
Cost incurredRs 27.31 cr
Work done18.89%
BuildingWingEstimatedIncurred
Building No-4 Wing CNARs 140.87 crRs 25.34 cr
-NARs 3.67 crRs 1.97 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDaisaria Associates
EngineerHiten R Mahimtura
EngineerREJI KUNJUKUTTY
Chartered AccountantM/s. SABS and Associates
PartnerRole in project
Sun City Housing-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2030

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Mars_C_wing Form 2A - FY 2025-26.pdf30 Jun 2026
Commencement certificateFile: 2439317_FurtherCC_signed_Wing_A_B___C.pdf28 Apr 2026
Commencement certificateFile: Further_CC_DT_13_04_2026.pdf28 Apr 2026
Layout approvalFile: Amended_Drawing_1-9_dt_8_7_2025-1-3 (4).pdf28 Apr 2026
Building plan approvalFile: Amended_Drawing_1-9_dt_8_7_2025-1-3 (5).pdf28 Apr 2026
Building plan approvalFile: Amended_Drawing_1-9_dt_8_7_2025-4-6 (2).pdf28 Apr 2026
Building plan approvalFile: Amended_Drawing_1-9_dt_8_7_2025-7-9 (2).pdf28 Apr 2026
Building plan approvalFile: Amended_Drawing_10-19-1-3 (2).pdf28 Apr 2026
Building plan approvalFile: Amended_Drawing_10-19-4-6 (2).pdf28 Apr 2026
Building plan approvalFile: Amended_Drawing_10-19-7-10 (2).pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1 - Mars Wing C March 2026.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2 - Mars Wing C March 2026.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3 - Mars Wing C March 2026.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1 - Mars C Wing as on Dec 2025.pdf27 Mar 2026
Withdrawal Update Form 2File: Form 2 - Mars C Wing as on Dec 2025.pdf27 Mar 2026
Withdrawal Update Form 3File: Form 3 - Mars C Wing as on Dec 2025 (REVISED).pdf27 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf26 Dec 2025
Withdrawal Update Form 1File: Form 1 Sep 2025.pdf26 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf26 Dec 2025
Withdrawal Update Form 2File: Form 2 Sep 2025.pdf26 Dec 2025
Withdrawal Update Form 3File: Form 3 July 2025.pdf26 Dec 2025
Withdrawal Update Form 3File: Form 3 Sep 2025.pdf26 Dec 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Suncity Undertaking cum Affidavit.PDF16 May 2025
Other - FinanceFile: Suncity Undertaking cum Affidavit.PDF16 May 2025
Other - FinanceFile: Declaration_Of_Landowners.pdf24 Apr 2025
Other - FinanceFile: Sun poa 1.pdf24 Apr 2025
Other - FinanceFile: Probate_11zon.pdf24 Apr 2025
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) - 2025-04-19T151726123.pdf11 Apr 2025
Building plan approvalFile: 1 Copy of Layout Approval (in case of layout) - 2025-04-19T151726123.pdf11 Apr 2025
Building plan approvalFile: Page 2.pdf11 Apr 2025
Building plan approvalFile: Page 3.pdf11 Apr 2025
Building plan approvalFile: Page 4.pdf11 Apr 2025
Building plan approvalFile: Page 5.pdf11 Apr 2025
Building plan approvalFile: Page 6.pdf11 Apr 2025
Building plan approvalFile: Page 7.pdf11 Apr 2025
Building plan approvalFile: Page 8.pdf11 Apr 2025
Building plan approvalFile: Page 9.pdf11 Apr 2025
Building plan approvalFile: Page 16 Section Plan.pdf11 Apr 2025
PAN CardFile: PAN CARD.pdf11 Apr 2025
Copy of the legal title reportFile: Final Title Report- Mars Wing C.pdf11 Apr 2025
Details of encumbrances concerned to FinanceFile: Adobe Scan Apr 24, 2025.pdf11 Apr 2025
Details of encumbrances concerned to FinanceFile: Encumbrance_Letter.pdf11 Apr 2025
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) - 2025-04-19T151726123.pdf11 Apr 2025
Proforma of Allotment letterFile: AL_MARS_WING_C_SUNCITY_HOUSING_23042025.pdf11 Apr 2025
Declaration in FORM BFile: 1 Declaration in FORM B (33).pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_for_C_wing (1).pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FINAL FOR C WING.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Certificate_fianl.pdf11 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf11 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Page 9.pdf11 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Page 16 Section Plan.pdf11 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Page 8.pdf11 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Page 7.pdf11 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Page 6.pdf11 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Page 4.pdf11 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Page 3.pdf11 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Page 2.pdf11 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 1 Copy of Layout Approval (in case of layout) - 2025-04-19T151726123.pdf11 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Page 5.pdf11 Apr 2025
Declaration about Commencement CertificateFile: SCAN_20250516_121641021.pdf11 Apr 2025
CERSAI detailsFile: merged cersai with dec- mars wing c.pdf11 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format_A_from_Developer.pdf11 Apr 2025
Deviation Report with respect to Allotment letterFile: Deviation_Report_Of_Allotment_Letter.pdf11 Apr 2025
Details of encumbrances concerned to LegalFile: Encumbrance_Letter.pdf11 Apr 2025
Details of encumbrances concerned to LegalFile: Adobe Scan Apr 24, 2025.pdf11 Apr 2025
Other - TechnicalFile: Final Order 50 Mars Wing C.pdf11 Apr 2025
Other - TechnicalFile: Plot Are Declaration from Architect.pdf11 Apr 2025
Deviation Report with respect to model copy of AgreementFile: Deviation_Report_Of_Agreement_For_Sale.pdf11 Apr 2025
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale - Mars Wing C- Final.pdf11 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: merged ann a- mars.pdf11 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format_B_from_Bank.pdf11 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: merged disc sec unsec end use-24042025.pdf11 Apr 2025

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MARS WING-C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hariyali East- Powai6,700+ in Mumbai Suburban

2 kmMARS WING-CCompleted 46Lapsed / revoked 29Other 83Dot size: filed unitsN

Filed coordinates, straight-line distance. 158 registered projects within 2 km.

Builder: Sun City Housing

Sun City Housing has 1 registration on MahaRERA, including MARS WING-C. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MARS WING-C is delayed beyond 31 Mar 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MARS WING-C?

The registered promoter entity is Sun City Housing, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MARS WING-C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MARS WING-C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MARS WING-C?

The professionals named in the filing: Architect: Daisaria Associates; Engineer: Hiten R Mahimtura; Engineer: REJI KUNJUKUTTY; Chartered Accountant: M/s. SABS and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MARS WING-C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MARS WING-C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MARS WING-C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.