Home / Browse projects / Palghar, Maharashtra / Empire Estate 1

Completed No litigation declared Mixed project

Empire Estate 1

By Javed Yasin Kojar

RG-MH-30415 · RERA P99000030913 · Last updated on MahaRERA portal: 14 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
24 of 66Construction stages doneacross 6 buildings; furthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 40 documents Report an error

Empire Estate 1 is a Mixed project by Javed Yasin Kojar in Palghar, Maharashtra, registered with MahaRERA as P99000030913 on 29 Sep 2021. The registration is recorded completed; possession was promised by 31 Dec 2023.

At a glance

Project

  • NameEmpire Estate 1
  • TypeMixed
  • Location
    • Khanipada
    • Kaman village
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000030913
  • ReraGenie IDRG-MH-30415

Builder

  • NameJaved Yasin Kojar
  • Entity typeIndividual

Key dates

this monthRegisteredSep 2021PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Sep 2021
  • Promised completion31 Dec 2023
  • Revised completionNone
  • Buildings6 building records
  • Documents filed40 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Unit no 1NA00000
Unit no 3NA00000
Unit no 4NA00000
Unit no 5NA00000
Unit no 6NA10000
Unit no 7NA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 14 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 90%.

Unit no 177%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Unit no 377%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Unit no 477%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Unit no 577%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Unit no 677%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Unit no 777%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 14 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes80%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes80%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes80%
Open ParkingYes80%

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area31,760 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
M/s. ED RealtyAndheriMumbai Suburban

Approvals and building plan

Permissible FSI12638.09
Proposed, not sanctioned10,138 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMALAD WEST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEN CON Project Consultants for Architectural & Structural Works
EngineerSanjay S Narang
Chartered AccountantDALAL & DALAL
PartnerRole in project
Javed Yasin Kojar-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Jan 2022

Documents filed40

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: New Doc 02-07-2025 11_compressed.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 1.pdf5 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: resize Form 5 Phase 1.pdf5 Apr 2023
Other - LegalFile: Submission of Maharera email.pdf5 Apr 2023
Details of encumbrances concerned to FinanceFile: ENCRUMBRANCES CONCERN TO LEGAL.pdf25 Feb 2023
Details of encumbrances concerned to LegalFile: ENCRUMBRANCES CONCERN TO LEGAL.pdf25 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE.pdf25 Feb 2023
Disclosure of sold/ booked inventoryFile: Sold unsold booked inventory.pdf25 Feb 2023
CERSAI detailsFile: CERSAI report Empire Estate 1.pdf25 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure on interest in other real estate project ANNEXURE A.pdf25 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration about seperate Bank account.pdf25 Feb 2023
Deviation Report with respect to Allotment letterFile: DEVIATION OF ALLOTMENT LETTER.pdf25 Feb 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT TO AFS.pdf25 Feb 2023
Proforma of Agreement for saleFile: Final AFS Empire Estate 1.pdf7 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc_certificate.pdf28 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PLINT_CC_U6_U7.pdf28 Jan 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 for 1, 3, 4, 5.pdf27 Jan 2022
Building plan approvalFile: CC PLAN FULL BUILDING LAYOUT.pdf25 Sep 2021
PAN CardFile: PAN CARD -ED Realty.pdf25 Sep 2021
Copy of the legal title reportFile: legal titled report.pdf25 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: CC PLAN FULL BUILDING LAYOUT.pdf25 Sep 2021
Layout approvalFile: Full Layout part 1.pdf21 Sep 2021
Layout approvalFile: Full layout part 2.pdf21 Sep 2021
Copy of Layout Approval (in case of layout)File: Full Layout part 1.pdf21 Sep 2021
Copy of Layout Approval (in case of layout)File: Full layout part 2.pdf21 Sep 2021
Declaration in FORM BFile: FORM B 9 9 21 .pdf21 Sep 2021
PAN CardFile: javid_pan_card.pdf15 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: FULL CC_PART 1.pdf30 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: FULL CC_PART 2.pdf30 Aug 2021
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate-Form D-.pdf30 Aug 2021
Proforma of Allotment letterFile: Allotment Letter.pdf30 Aug 2021
Layout approvalFile: CC PLAN FULL LAYOUT.pdf29 Aug 2021
Details of encumbrancesFile: Nil encumbrance letter.pdf29 Aug 2021
Copy of Layout Approval (in case of layout)File: CC PLAN FULL LAYOUT.pdf29 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: REVESED_CC_UNIT_NO_6_PART_1_compressed.pdf29 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCTITEC CERTIFICATE Form 1.pdf29 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINER CERTIFICATE Form 2.pdf29 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY ASSURANCE CERTI.pdf29 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM-3.pdf29 Aug 2021
Proforma of Allotment letterFile: AFS_FINAL_DRAFT_ON_6_8_2021.pdf29 Aug 2021

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Empire Estate 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kaman village3,200+ in Palghar

2 kmEmpire Estate 1Completed 123Lapsed / revoked 57Other 136Dot size: filed unitsN

Filed coordinates, straight-line distance. 316 registered projects within 2 km.

Builder: Javed Yasin Kojar

Javed Yasin Kojar has 1 registration on MahaRERA, including Empire Estate 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Empire Estate 1 is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Empire Estate 1?

The registered promoter entity is Javed Yasin Kojar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Empire Estate 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Empire Estate 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Empire Estate 1?

The professionals named in the filing: Architect: EN CON Project Consultants for Architectural & Structural Works; Engineer: Sanjay S Narang; Chartered Accountant: DALAL & DALAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Empire Estate 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Empire Estate 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Empire Estate 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.