Home / Browse projects / Mumbai Suburban, Maharashtra / Emarald Castle

Registered No litigation declared Others project

Emarald Castle

By Shreeji Buildcon Projects Private Limited

RG-MH-05423 · RERA P51800052182 · Last updated on MahaRERA portal: 19 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 90%
16 of 19Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

Emarald Castle is a Others project by Shreeji Buildcon Projects Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052182 on 27 Jul 2023. Possession is promised by 31 Dec 2027. 3 of the 19 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameEmarald Castle
  • TypeOthers
  • Location
    • LBS Marg
    • L Ward
    • Kurla West
    • Kurla
    • Mumbai Suburban
    • 400070
  • Pincode400070
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800052182
  • ReraGenie IDRG-MH-05423

Builder

  • NameShreeji Buildcon Projects Private Limited
  • Entity typeCompany
  • DirectorsShahbaz Abdul Wali Ansari, Mohammed Ajmal Farooqui, Tausif Ahmed Peer Khan

Key dates

this monthRegisteredJul 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jul 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed61 files

Current status

16%3 of 19 units booked

Figures as on 19 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Emarald Castle - Wing BNA99303
Emarald Castle - Wing ANA141414216

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

Emarald Castle - Wing B52%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises8%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Emarald Castle - Wing A52%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises8%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed84

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots84
Closed/Covered84
BuildingClosed/CoveredTotal
Emarald Castle - Wing B1616
Emarald Castle - Wing A6868

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,251 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Jul 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3127.2
Proposed, not sanctioned3,127 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSonapur Lane, Near City Hospital Father Peter Pereira Road,Off LBS Marg,Kurla W,Mumbai 400070

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/S Deole Bros, Mr Sunil Deole
ArchitectSunil R Deole
EngineerM/S S V Patel & Associates
EngineerTRENDZ DESIGN CONSULTANTS
EngineerS V Patel and Associates
Chartered AccountantV S Patangia and Co
Chartered AccountantY N K AND ASSOCIATES
PartnerRole in project
Shreeji Buildcon Projects Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: FORM 2A - March 24.pdf19 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A - March 25.pdf19 Feb 2026
Form 1File: Architect Certificate Jun 25.pdf22 Aug 2025
Form 2File: Engineer Certificate Jun 25.pdf22 Aug 2025
Form 3File: CA Certificate jun 25.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD BOOKED INVENTORY -EMARALD CASTLE JUNE25 (1).pdf22 Aug 2025
Form 1File: FORM 1 UPDATE.pdf16 Jul 2025
Form 2File: Engineer Certificate Form 2.pdf16 Jul 2025
Form 3File: FORM 3 SEP24.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sept 24.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD BOOKED INVENTORY -EMARALD CASTLE MAR25.pdf28 Jun 2025
Form 1File: Form1 Mar25.pdf28 Jun 2025
Form 2File: FORM 2 MAR25.pdf28 Jun 2025
Form 3File: FORM 3 MAR25.pdf28 Jun 2025
Disclosure of sold/ booked inventoryFile: disclosure.pdf7 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Cert June24.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Cert Sept23.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Cert March24.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Cert June24.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Cert Sept23.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Cert March24.pdf14 Oct 2024
Building plan approvalFile: APPROVED Drawing UPTO 14TH FLR.pdf2 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: APPROVED Drawing UPTO 14TH FLR.pdf2 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: 2433096_FurtherCC_signed (1).pdf2 Aug 2024
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD BOOKED INVENTORY -EMARALD CASTLE JUNE24.pdf30 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30 September 2023 (1).pdf20 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31 December 2023.pdf20 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31 March 2024.pdf20 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 (1).pdf3 May 2024
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD BOOKED INVENTORY -EMARALD CASTLE.pdf17 Apr 2024
Other - TechnicalFile: 2A-Rera 16-04-2024.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: RERA DEC UPDATE.pdf5 Feb 2024
Building plan approvalFile: Drawing 1 5FS_1 (5 files merged).pdf19 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Drawing 1 5FS_1 (5 files merged).pdf19 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC_of Shreeji.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 UPDATE.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD BOOKED INVENTO.pdf19 Oct 2023
Declaration about Commencement CertificateFile: Form D.pdf24 Jul 2023
Building plan approvalFile: Copy of Layout Approval.pdf22 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Copy of Layout Approval.pdf22 Jul 2023
Other - TechnicalFile: DECLARATION.pdf11 Jul 2023
Layout approvalFile: Drawing 0 iod.pdf27 Jun 2023
Copy of Layout Approval (in case of layout)File: Drawing 0 iod.pdf27 Jun 2023
Other - FinanceFile: FORM 3 FINAL-Com.pdf27 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Other - Finance-ca.pdf19 Jun 2023
Proforma of Agreement for saleFile: AFS FInal.pdf19 May 2023
Deviation Report with respect to model copy of AgreementFile: DEVI.pdf19 May 2023
Other - TechnicalFile: Declaration.pdf9 May 2023
Copy of the legal title reportFile: Final -Title Report.pdf14 Apr 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf14 Apr 2023
Details of encumbrances concerned to FinanceFile: No encumbrances concern to legal.pdf14 Apr 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf14 Apr 2023
Details of encumbrances concerned to LegalFile: No encumbrances concern to legal.pdf14 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report.pdf14 Apr 2023
PAN CardFile: Firm Pan Card_rotated.pdf12 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf12 Apr 2023
Declaration in FORM BFile: Developers Form B.pdf12 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure.pdf12 Apr 2023
Proforma of Allotment letterFile: Allotment Letter rera_compressed.pdf12 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEparate Bank Declaration.pdf12 Apr 2023
Deviation Report with respect to Allotment letterFile: Deviations of the allotment.pdf12 Apr 2023

How this compares with Mumbai Suburban

16%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Emarald Castle on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near L Ward, Kurla West6,700+ in Mumbai Suburban

2 kmEmarald CastleCompleted 91Lapsed / revoked 76Other 113Dot size: filed unitsN

Filed coordinates, straight-line distance. 280 registered projects within 2 km.

Builder: Shreeji Buildcon Projects Private Limited

Shreeji Buildcon Projects Private Limited has 1 registration on MahaRERA, including Emarald Castle. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Emarald Castle is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Emarald Castle?

The registered promoter entity is Shreeji Buildcon Projects Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Emarald Castle?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Emarald Castle?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Emarald Castle?

The professionals named in the filing: Architect: M/S Deole Bros, Mr Sunil Deole; Architect: Sunil R Deole; Engineer: M/S S V Patel & Associates; Engineer: TRENDZ DESIGN CONSULTANTS; Engineer: S V Patel and Associates; Chartered Accountant: V S Patangia and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Emarald Castle?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Emarald Castle. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Emarald Castle to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.