ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / EKTA GREENVILLE PHASE 2 WING O , P , Q AND R

Registered Litigation declared Residential / Group Housing project

EKTA GREENVILLE PHASE 2 WING O , P , Q AND R

By EKTA HOUSING PRIVATE LIMITED

RG-MH-00743 · RERA P51600000685 · Last updated on MahaRERA portal: 5 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 8 complaints at MahaRERA
  • Completion date moved by 90 months
  • 5 extensions taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 90 months from the original
29 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 95%
24 of 128Units unsoldnot recorded sold or booked
8Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

EKTA GREENVILLE PHASE 2 WING O , P , Q AND R is a Residential / Group Housing project by EKTA HOUSING PRIVATE LIMITED in Nashik, Maharashtra, registered with MahaRERA as P51600000685 on 20 Jul 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 90 months from the original filing. 104 of the 128 units on this registration are recorded sold or booked, and 29 of 44 construction stages are filed complete. 8 complaints are on record with the regulator.

At a glance

Project

  • NameEKTA GREENVILLE PHASE 2 WING O , P , Q AND R
  • TypeResidential / Group Housing
  • Location
    • PATHARDI
    • Nashik
    • 422010
  • Pincode422010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600000685
  • ReraGenie IDRG-MH-00743

Builder

  • NameEKTA HOUSING PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200MH1990PTC058279
  • GSTIN27AAACE2460K1ZP
  • DirectorsVIVEK ASHOK MOHANANI, ASHOK GOBINDRAM MOHANANI
  • Other registrations8 more →
  • Completed5 of 9
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredJul 2017First promiseJun 2019Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jul 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2019)
  • Buildings4 building records
  • Documents filed102 files

Current status

81%104 of 128 units booked

Figures as on 5 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ONA10032032
WING PNA10032032
WING QNA10032032
WING RNA10032032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

29 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

WING O90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING P90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING Q80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
WING R60%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.11%

Progress on shared amenities33

As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes86%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes80%
Open ParkingYes80%
Gazebo with size 8 feet x 8 feet for people to sit and relaxYes65%
Children Play Area with playing equipmentsYes100%
CHESS and CARDS area will be in CLUB HOUSEYes100%
PAVED SITTING AREAYes85%
CLUB HOUSE with gymnasium and games room with squash court and steam facilityYes100%
GUARD HOUSE with separate Entry and ExitYes100%
GYMNASIUM with area of approx 62 sqm with fitness equipment will be in CLUB HOUSEYes100%
KIDS POOL of size 4 m x 4mYes77%
MUTIPURPOSE COURT to play Basketball and BadmintonYes100%
NET CRICKET with cricket pitch enclosed with net aroundYes100%
PARTY LAWN with lush green grass for party functions get togetherYes100%
PATHWAY of 5 feet in width for jogging and walking through the landscape areaYes91%
SNOOKER TABLE area will be in Club HouseYes100%
SQUASH COURT will be in CLUB HOUSEYes100%
SWIMMING POOL of size 11 m x 5 mYes67%
TABLE TENNIS area will be in Club HouseYes100%
TEMPLE with size of 8 feet x 8 feetYes100%
TREE PITS WITH SEATS AROUNDYes90%

Parking filed29

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots29
Closed/Covered4
Open Space25
BuildingClosed/CoveredOpen SpaceTotal
WING O189
WING P178
WING Q11011
WING R101

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,219 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Sep 2024

Approvals and building plan

Sanctioning authorityNASHIK MAHANAGARP PALIKA
Permissible FSI41448.45
Proposed, not sanctioned9,007 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Unit No 001A, Hallmark Business Plaza , New Collector Office, Bandra East Mumbai 40005

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUMESH BAGUL
ArchitectSamir Desai
EngineerJW CONSULTANTS LLP
EngineerAmit Parshuram Kamble
EngineerSACHIN S KARAWADE
Chartered AccountantVikas Mangal
Chartered AccountantManoj Chaturvedi
PartnerRole in project
EKTA HOUSING PRIVATE LIMITED-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600009833Jun 2019 → Mar 2022

Reason as filed by the promoterIn the above said project, there are 4 wings O,P, Q & R and we have obtained Occupation Certificate for Wing O & P. Now we are applying for extension date for Q & R wing. In the Q & R Wing there are 24 Registered flats and we have obtained consent of 51% allottee i.e. 13 allottees. Due to non availability of material and labour for the constructions of the Project and outbreak of novel Corona Virus Pandemic and imposition of the Lock down in entire State of Maharashtra which caused delay in Project. Due to non availability of material and labour for the constructions of the Project and outbrea

EXT51600000830Jun 2019 → Jun 2020

Reason as filed by the promoterDue to scarcity of availability of the resources and also some technical reasons.

EXT51600017875Jun 2019 → Mar 2025

Reason as filed by the promoterReply Annexed.

EXT51600012726Jun 2019 → Sep 2023

Reason as filed by the promoterWe hereby apply for extension u/s 7(3) for the registered project naming Ekta Greenville Phase II bearing MahaRERA registration No. P51600000685 comprising of Four wings i.e. O,P,Q and R, out of the Two wings i.e. O and P have received O.C on 06th January, 2020. The O.C still pending for wings Q and R, and while the Buildings are almost complete, application for O.C is pending only for some technical issue. The current registration expired on 30.09.2022, and we are applying u/s 7(3) for the extension till 30.09.2023. As prescribed under circular No. 07/2019 dated 8th Feb, 2019 the details of c

EA11092401792Jun 2019 → Dec 2026

Reason as filed by the promoterShortage of sand and skilled labour

Litigation declared1

CaseCourtStatus
1197/2016State Commission Maharashtra MumbaiPENDING

Complaints filed with MahaRERA8

Case no.ComplainantRespondentFiled
CC001000000000033BAHULA PARIKHEKTA HOUSING PVT LTD20/12/2017
CC001000000000012Sudesh SharmaVIVEK MOHANANI24/10/2017
CC001000000000110MOHINESH ADVANIEKTA HOUSING PVT. LTD.26/07/2019
CC001000000020214Ranjana Devraj BalistiEkta Housing Private Limited02/12/2021
CC001000000020263ASHOK BANDU SALVEEKTA HOUSING PVT LTD11/05/2022
CC001000000060327Anoop Murildhar KatareEkta Housing Private Limited08/06/2023
CC001000000080349Kailash GuptaM/s. Ekta Housing Pvt. Ltd. Through its Promoter Mr. Vivek A. Mohanan11/09/2023
CC12502203Sunil Vasant ShindeEKTA HOUSING PRIVATE LIMITED02/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Jan 2020

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: SIGNED GREENVILLE PHASE II FORM 1 WING Q R TILL 31-3-2026 NEW FORMAT.pdf5 May 2026
Form 2File: SIGNED EKTA GREENVILLA PHASE II FORM 2 MARCH 26.pdf5 May 2026
Form 3File: SIGNED FORM 3 Greenville Phase II 31_03_2026.pdf5 May 2026
Disclosure of Sold and Booked InventoryFile: QUARTERLY SOLD AND UNSOLD 31_03_2026.pdf5 May 2026
Form 1File: EW GREENVILLE PHASE II FORM 1 DEC 25.pdf20 Jan 2026
Form 2File: Form 2EKTA GREENVILLE PHASE 2.pdf20 Jan 2026
Form 3File: signed FORM 3 GV P II.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD EKTA GREENVILLE PHASE II.pdf20 Jan 2026
Form 1File: EW GREENVILLE PHASE II FORM 1 WING Q& R TILL 30-09-2025.pdf17 Oct 2025
Form 2File: greenville phase 2 form 2 Sep 2025.pdf17 Oct 2025
Form 3File: signed FORM 3 GV P II.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: EKTA GREENVILLE PHASE 2 SOLD UNSOLD.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5 EKTA GREENVILLE PHASE II 31_03_25.pdf29 Sep 2025
Form 1File: EKTA GREENVILLE PHASE II FORM 1 30-06-2025.pdf18 Jul 2025
Form 2File: FORM 2 EKTA GREENVILEE PHASE 2.pdf18 Jul 2025
Form 3File: signed FORM 3 GV P II 30_06_2025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD & UNSOLD Greenville phase 2.pdf18 Jul 2025
Disclosure of sold/ booked inventoryFile: EKTA GREENVILLE SOLD UNSOLD INVENTORY.pdf22 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EW GREENVILLE PHASE II FORM 1 WING Q R 31_12_2024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: GV P II_compressed.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EKTA GREENVILLE II.PDF18 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EW GREENVILLE PHASE II FORM 1 WING Q R TILL 30_09_24.pdf19 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EW GREENVILLE PHASE II FORM 1 WING Q R TILL 30_09_24 R1.pdf19 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062024 EW GREENVILLE PHASE II Form 2 ENGINEER CERTIFICATE 30_09_24.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: GV P II SOLD UNSOLD.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ekta greenville phase 2.pdf18 Oct 2024
Certificates of CA (Form 3)File: FORM 3 GV P II_30062024.pdf8 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf29 Jul 2024
Disclosure of sold/ booked inventoryFile: EKTA GREENVILLE- OPQR WINGS Quaterly Inventory Updates.pdf17 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EW GREENVILLE PHASE II FORM 1 WING Q R TILL 31-03-2024.pdf3 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EW GREENVILLE PHASE II Form 2 ENGINEER CERTIFICATE 31032024.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: EW GREENVILLE Q R FORM 2A Quality Assurance Certificate 31-3-2024.pdf3 May 2024
Certificates of CA (Form 3)File: SIGNED Form 3 GV P II 31-03-2024.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: EKTA GREENVILLE- OPQR WINGS Quaterly Inventory Updates.pdf16 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EW GREENVILLE PHASE II FORM 1 WING Q and R TILL 31-12-2023.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: GREENVILLE-02012024.pdf17 Jan 2024
OtherFile: construction schedule Qand R.pdf3 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Greenville Phase II.pdf15 Dec 2023
Proforma of Agreement for saleFile: AFS Ekta Greenville Phase 2 Wing OPQR.pdf8 Dec 2023
Certificates of CA (Form 3)File: Signed Form 3 Greenville Phase 3 Sep 2023.pdf30 Oct 2023
Disclosure of sold/ booked inventoryFile: EKTA GREENVILLE- OPQR WINGS Quaterly Inventory Updates.pdf23 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EW GREENVILLE PHASE II Form 1 ARCH CERTIFICATE 30-9-2023.pdf17 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EW GREENVILLE PHASE II Form 2 ENGINEER CERTIFICATE 30-9-2023.pdf17 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: greenville phase II.pdf6 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GREENVILLE PHASE II.pdf3 Aug 2023
Disclosure of sold/ booked inventoryFile: 01072023-GREENVILLE OPQR.pdf16 Jul 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: GREENVILLE Phase II O TO R.pdf12 Jun 2023
OtherFile: Ekta Greenville phase2.pdf2 May 2023
Disclosure of sold/ booked inventoryFile: GREEN VILLE PHASE II.pdf6 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCH GREENVILLE PHASE II.pdf4 Mar 2023
OtherFile: Greenville Phase 2.pdf11 Feb 2023
Certificates of CA (Form 3)File: FORM 3 EKTA GREENVILLE PHASE II.pdf10 Feb 2023
Certificates of CA (Form 3)File: FORM 3 EKTA GREENVILLE PHASE II.pdf10 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EW GREENVILLE PHASE II Form 2 ENGINEER CERTIFICATE 31-12-22.pdf8 Feb 2023
Details of encumbrances concerned to FinanceFile: Greenville Phase 2.pdf4 Feb 2023
Details of encumbrances concerned to LegalFile: Greenville Phase 2.pdf4 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A QUALITY ASSURANCE GREENVILLE PHASE II 1-01-2022.pdf4 Feb 2023
CERSAI detailsFile: Housing.pdf4 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Housing.pdf4 Feb 2023
Proforma of Agreement for saleFile: Allottment Letter and Agreement - Greenville Ph II.pdf4 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: GREENVILLE PHASE II.pdf23 Jan 2023
Disclosure of sold/ booked inventoryFile: GREENVILEE O P Q R.pdf15 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Greenville Phase 2.pdf1 Nov 2022
Disclosure of sold/ booked inventoryFile: GREEN VILLE PHASE II.pdf9 Oct 2022
Disclosure of sold/ booked inventoryFile: GREENVILLE PHASE II OPQR.pdf6 Jul 2022
Disclosure of sold/ booked inventoryFile: greenville Phase II.pdf5 Apr 2022
Disclosure of sold/ booked inventoryFile: OPQR GREENVILLE PHASE II.pdf7 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: GREENVILLE PHASE II.pdf30 Dec 2021
Disclosure of sold/ booked inventoryFile: ekta green ville phase II.pdf9 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclouser of sold inventory of Oand P wing.pdf25 Aug 2021
OtherFile: Nashik Club OC.pdf25 Aug 2021
Declaration about Commencement CertificateFile: Declaration of Commencement certificate.pdf3 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certifcate for 2020-2021.pdf27 Jul 2021
Disclosure of sold/ booked inventoryFile: DIsclosure of Sold Inventory.pdf27 Jul 2021
Declaration about Commencement CertificateFile: Declaration of CC.pdf22 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certifcate for 2020-2021.pdf22 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Ekta Greenville Phase-2.pdf10 Feb 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Nasik OC.pdf6 Jan 2020
Details of encumbrancesFile: Index-2 Jm 20 Crs.pdf3 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Greenville Phase II.pdf16 Nov 2019

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
EKTA GREENVILLE WING F,G,H,L,M,NSURVEY NO 231 AT PATHARDI NASHIK - 422 010192CompletedMar 2017Late, Jul 2017
EKTA CALIFORNIA WING A,B,C,D,ESurvey No 9 Hissa No 1 Part Undri Pune120CompletedMar 2015Late, Jul 2015
EKTA GREENVILLE ROW HOUSES AND VILLASSURVEY NO 231 AT PATHARDI NASHIK - 422 01020CompletedMay 2014Late, Jul 2017
EKTA GREENVILLE ROW HOUSE NO 29 AND 30SURVEY NO 231 AT PATHARDI NASHIK - 422 0102CompletedJul 2012Jul 2012
EKTA GREENVILLE WING A, B, C, D, E, KSURVEY NO 231 AT PATHARDI NASHIK - 422 010192CompletedApr 2012Late, Jul 2012

How this compares with Nashik

81%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 90 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EKTA GREENVILLE PHASE 2 WING O , P , Q AND R on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nashik4,100+ in Nashik

2 kmEKTA GREENVILLE PHASE 2 Completed 78Lapsed / revoked 12Other 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 137 registered projects within 2 km.

Builder: EKTA HOUSING PRIVATE LIMITED

EKTA HOUSING PRIVATE LIMITED has 9 registrations on MahaRERA, including EKTA GREENVILLE PHASE 1 WING I AND J and EKTA GREENVILLE PHASE 2 WING O , P , Q AND R. Its filings disclose 5 earlier MahaRERA projects: declares 1 of 5 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if EKTA GREENVILLE PHASE 2 WING O , P , Q AND R is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EKTA GREENVILLE PHASE 2 WING O , P , Q AND R?

The registered promoter entity is EKTA HOUSING PRIVATE LIMITED, a company as per the filing. Its CIN U45200MH1990PTC058279 and GSTIN 27AAACE2460K1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EKTA GREENVILLE PHASE 2 WING O , P , Q AND R?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against EKTA GREENVILLE PHASE 2 WING O , P , Q AND R?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for EKTA GREENVILLE PHASE 2 WING O , P , Q AND R?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EKTA GREENVILLE PHASE 2 WING O , P , Q AND R?

The professionals named in the filing: Architect: UMESH BAGUL; Architect: Samir Desai; Engineer: JW CONSULTANTS LLP; Engineer: Amit Parshuram Kamble; Engineer: SACHIN S KARAWADE; Chartered Accountant: Vikas Mangal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EKTA GREENVILLE PHASE 2 WING O , P , Q AND R?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EKTA GREENVILLE PHASE 2 WING O , P , Q AND R. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EKTA GREENVILLE PHASE 2 WING O , P , Q AND R to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.