ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / EKAANT

Registration lapsed No litigation declared Residential / Group Housing project

EKAANT

By SHREE BALAJI ASSOCIATES

RG-MH-88135 · RERA P52100047560 · Last updated on MahaRERA portal: 21 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
7 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 153 documents Report an error

EKAANT is a Residential / Group Housing project by SHREE BALAJI ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100047560 on 9 Nov 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameEKAANT
  • TypeResidential / Group Housing
  • Location
    • MAMURDI
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100047560
  • ReraGenie IDRG-MH-88135

Builder

  • NameSHREE BALAJI ASSOCIATES
  • Entity typePartnership
  • PartnersARJUN DEVIDAS VIDHATE, Rohan Sumedh Bhosale, Shrikant Shinde
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredNov 2022First promiseDec 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Nov 2022
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed153 files

Current status

100.0%Work done, per cost certificate

Figures as on 21 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EKAANT A WINGNA88000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

EKAANT A WING: 64% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed59

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots59
Closed/Covered24
Open Space35

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
Encumbrance on the landDeclared none
Declared on22 May 2025
LandownerVillageDistrict
PANKAJ SHIVAJI JAGDALEPimpri Chinchawad (M Corp.)Pune
MANISH SHAAM OHALPimpri Chinchawad (M Corp.)Pune
NITIN SHAM OHOLPimpri Chinchawad (M Corp.)Pune
SHANTANU VITTHAL RAUTNimgaon BhogiPune
PRAVIN SOPAN RAIPUREbuldana (MCL)Buldana
NAVNATH JAGDALEPimpri Chinchawad (M Corp.)Pune
VIJAY KHATATESaswadSatara
BABAN RAMDAS KANHURKARCHARHOLIPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI854.22
Proposed, not sanctioned854 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAVET PUNE 412101
Estimated costRs 3.93 cr
Cost incurredRs 3.93 cr
Work done100.0%
BuildingWingEstimatedIncurred
EKAANT A WINGNARs 3.93 crRs 3.93 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectINTEGRITY ARCH & ASSOCIATES
EngineerARJUN VIDHATE
Chartered AccountantPRAVIN EKNATH PISE
Chartered AccountantVAIBHAV S BHISE & ASSOCIATES
PartnerRole in project
SHREE BALAJI ASSOCIATES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025730Dec 2024 → Dec 2025

Reason as filed by the promoterThe delays have occurred due to the following reasons: Technical issues with the planning authority, resulting in delays in issuing the full Completion Certificate. Insufficient funding, material shortages, and unavailability of labour, further hindering our progress.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed153

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 153 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: F1-Q3.pdf21 Jan 2026
Withdrawal Update Form 2File: F2-Q3.pdf21 Jan 2026
Withdrawal Update Form 3File: FORM-3.pdf21 Jan 2026
Withdrawal Update Form 1File: F1-Q2.pdf20 Oct 2025
Withdrawal Update Form 2File: F2-Q2.pdf20 Oct 2025
Withdrawal Update Form 3File: F3-Q2.pdf20 Oct 2025
Form 1File: F1.pdf19 Jul 2025
Form 2File: FORM-2 -MARCH-25.pdf19 Jul 2025
Form 3File: F3-EKAANT -MARCH-25.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: SU-MARCH-25.pdf19 Jul 2025
Withdrawal Update Form 1File: F1.pdf19 Jul 2025
Withdrawal Update Form 2File: FORM-2-JUNE-25.pdf19 Jul 2025
Withdrawal Update Form 3File: FORM-3(JUNE-25).pdf19 Jul 2025
Form 1File: F1-DEC-22.pdf22 May 2025
Form 2File: F2-DEC-22.pdf22 May 2025
Form 3File: F3-DEC-22.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: SU-DEC22.pdf22 May 2025
Form 1File: F1-MARCH-23.pdf22 May 2025
Form 2File: F2-MARCH-23.pdf22 May 2025
Form 3File: F3-MARCH-23.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: SU-MARCH-23.pdf22 May 2025
Form 1File: F1-JUNE 23.pdf22 May 2025
Form 2File: F2-JUNE-23.pdf22 May 2025
Form 3File: F3-JUNE-23.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: SU-JUNE-23.pdf22 May 2025
Form 1File: F1-SEPT 23.pdf22 May 2025
Form 2File: F2-SEPT-23.pdf22 May 2025
Form 3File: F3-SEPT-23.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: SU-SEPT-23.pdf22 May 2025
Form 1File: F1-DEC-23.pdf22 May 2025
Form 2File: F2-DEC-23.pdf22 May 2025
Form 3File: F3-DEC-23.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: SU-DEC23.pdf22 May 2025
Form 1File: F1-MARCH-24.pdf22 May 2025
Form 2File: F2-MARCH-24.pdf22 May 2025
Form 3File: F3-MARCH-24.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: SU-MARCH-24.pdf22 May 2025
Form 1File: F1-JUNE-24.pdf22 May 2025
Form 2File: F2-JUNE-24.pdf22 May 2025
Form 3File: F3-JUNE-24.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: SU-JUNE-24.pdf22 May 2025
Form 1File: F1-SEPT-24.pdf22 May 2025
Form 2File: F2-SEPT-24.pdf22 May 2025
Form 3File: F3-SEPT-24.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: SU-SEPT-24.pdf22 May 2025
Form 1File: F1-DEC-24.pdf22 May 2025
Form 2File: F2-DEC-24.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: SU-DEC24.pdf22 May 2025
Form 3File: F3-DEC-24_compressed.pdf22 May 2025
Form 5 (FY 2022-2023)File: 22-23.pdf22 May 2025
Form 5 (FY 2023-2024)File: 23-24.pdf22 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3-JUNE-23_compressed.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3-DEC-24_compressed.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3-SEPT-24_compressed.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3-JUNE-24_compressed.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3-MARCH-24_compressed.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3-DEC-23_compressed.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3-SEPT-23_compressed.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3-MARCH-23_compressed.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3-DEC-22_compressed.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: SU-DEC22.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: SU-MARCH-23.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: SU-JUNE-23.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: SU-SEPT-23.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: SU-DEC23.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: SU-MARCH-24.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: SU-JUNE-24.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: SU-SEPT-24.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: SU-DEC24.pdf8 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1-MARCH-23.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1-JUNE 23.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1-SEPT 23.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1-DEC-23.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1-MARCH-24.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1-JUNE-24.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1-SEPT-24.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1-DEC-24.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1-DEC-22.pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-MARCH-23.pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-DEC-24.pdf7 Mar 2025

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EKAANT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAMURDI13,700+ in Pune

2 kmEKAANTCompleted 52Lapsed / revoked 29Other 70Dot size: filed unitsN

Filed coordinates, straight-line distance. 151 registered projects within 2 km.

Builder: SHREE BALAJI ASSOCIATES

SHREE BALAJI ASSOCIATES has 4 registrations on MahaRERA, including MEGHDOOT and EKAANT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that EKAANT shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if EKAANT is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EKAANT?

The registered promoter entity is SHREE BALAJI ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EKAANT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EKAANT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EKAANT?

The professionals named in the filing: Architect: INTEGRITY ARCH & ASSOCIATES; Engineer: ARJUN VIDHATE; Chartered Accountant: PRAVIN EKNATH PISE; Chartered Accountant: VAIBHAV S BHISE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EKAANT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EKAANT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EKAANT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.