Home / Browse projects / Pune, Maharashtra / EAGLE ERA

Completed No litigation declared Commercial project

EAGLE ERA

By EAGLE REALITIES

RG-MH-22529 · RERA P52100031682 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
29 of 65Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 135 documents Report an error

EAGLE ERA is a Commercial project by EAGLE REALITIES in Pune, Maharashtra, registered with MahaRERA as P52100031682 on 3 Nov 2021. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 36 of the 65 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameEAGLE ERA
  • TypeCommercial
  • Location
    • NEXT TO VIVGYOR SCHOOL
    • SUS
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • RERA no.P52100031682
  • ReraGenie IDRG-MH-22529

Builder

  • NameEAGLE REALITIES
  • Entity typePartnership
  • PartnersSURESH YASHWANT MOHITE, ESMMAILL IBRAHIM MUJAWAR, KOUSSAR ESMMAILL MUJAWAR, SANJAY SHRIRANG MOHOLKAR, SUHEL SANJAY MOHOLKAR, UDDHAV SOPANRAO GAWADE, NIRAJ BALKRISHNA MOHOLKAR, GAURAV UDDHAV GAWADE, BRAHMA SURESH MOHITE

Key dates

this monthRegisteredNov 2021First promiseDec 2025Revised toDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Nov 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed135 files

Current status

55%36 of 65 units booked
82.7%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EAGLE ERANA9806565

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

EAGLE ERA: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNo100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo100%
Energy managemcntNo100%
Fire protection and fire safety requirementsYesNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed164

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots164
Closed/Covered164

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Dec 2025

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGION DEVELOPMENT AUTHORITY PUNE
Permissible FSI3375.0
Proposed, not sanctioned3,375 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD UPPER GROUND FLOOR ,JAY GANESH VISION ,CENTRE,SHOP NO 76 AND 77 ,B WING ,ACURDI,PUNE 411035
Estimated costRs 16.13 cr
Cost incurredRs 13.34 cr
Work done82.7%
BuildingWingEstimatedIncurred
EAGLE ERANARs 14.13 crRs 12.22 cr
-NARs 2.00 crRs 1.11 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNLESH SASWADE
Engineersuhel sanjay moholkar
EngineerRK RANDHAVE
Chartered AccountantANUPAMA shetty
Chartered AccountantGanesh Gapatand Associates
PartnerRole in project
EAGLE REALITIES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20122518854Dec 2025 → Dec 2026

Reason as filed by the promoterDue to delays caused by material shortages, labor shortages, and insufficient funding, the project has been delayed. “In this project, we will receive the completion certificate within 5-6 months; therefore, we request that the extension be granted until -- 31/12/2026

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed135

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Eagle Architect Certificate Q1.pdf15 Jul 2026
Withdrawal Update Form 1File: Eagle Architect Certificate Q1.pdf15 Jul 2026
Withdrawal Update Form 2File: Eagle Engg. Cert..pdf15 Jul 2026
Withdrawal Update Form 2File: Eagle Engineer Certificate Q1.pdf15 Jul 2026
Withdrawal Update Form 3File: Eagle CA Certificate Q1.pdf15 Jul 2026
Withdrawal Update Form 3File: Eagle CA Certificate Q1.pdf15 Jul 2026
Occupational CertificateFile: FULL OCCUPANCY CERTIFICATE.pdf13 Jul 2026
Occupational CertificateFile: Gmail Verification of Completion Certificate.pdf13 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2A.pdf6 May 2026
Withdrawal Update Form 1File: Eagle Architect Cert..pdf20 Apr 2026
Withdrawal Update Form 1File: Eagle Architect Cert..pdf20 Apr 2026
Withdrawal Update Form 2File: Eagle Engg. Cert..pdf20 Apr 2026
Withdrawal Update Form 2File: Eagle Engg. Cert..pdf20 Apr 2026
Withdrawal Update Form 3File: Eagle C A Cert..pdf20 Apr 2026
Withdrawal Update Form 3File: Eagle C A Cert..pdf20 Apr 2026
Layout approvalFile: plan 1.pdf19 Feb 2026
Building plan approvalFile: Full Building_HPSC0934 NS New.pdf19 Feb 2026
Building plan approvalFile: Elevation_HPSC0935 NS New.pdf19 Feb 2026
Withdrawal Update Form 1File: Eagle Architect Certificate.pdf6 Feb 2026
Withdrawal Update Form 2File: Eagle Engineer Certificate.pdf6 Feb 2026
Withdrawal Update Form 3File: FORM 3.pdf6 Feb 2026
Withdrawal Update Form 1File: Eagle Architect Certificate.pdf20 Jan 2026
Withdrawal Update Form 2File: Eagle Engineer Certificate.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf20 Jan 2026
Form 2A (FY 2024-2025)File: form2a.pdf19 Dec 2025
Form 1File: Architect Certificate.pdf8 Oct 2025
Form 2File: ENG.pdf8 Oct 2025
Form 3File: CA.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Eagle Era Sold Unsold List.pdf8 Oct 2025
Form 5 (FY 2024-2025)File: sign form 5 done.pdf1 Oct 2025
Form 1File: FORM 1.pdf22 Jul 2025
Form 2File: FORM 2.pdf22 Jul 2025
Form 3File: CA.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD.pdf22 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 - ARCHITECT CERTIFICATE Q4 Jan - Mar 25.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Q4 Jan - Mar 2025.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q4 Jan-Mar 25.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf13 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG.pdf13 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf13 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect RERA certificate Q3.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Q3 Oct-Dec 24.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARTERED ACCOUNTANTS_page-0001.pdf8 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARTERED ACCOUNTANTS (3)_page-0001.pdf8 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf8 Jan 2025
Layout approvalFile: 1-3.pdf12 Nov 2024
Building plan approvalFile: Full Building_HPSC0934 NS New.pdf12 Nov 2024
Building plan approvalFile: Elevation_HPSC0935 NS New.pdf12 Nov 2024
Copy of Layout Approval (in case of layout)File: 1-3.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Full Building_HPSC0934 NS New.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Elevation_HPSC0935 NS New.pdf12 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A declaration about separate bank account_page-0001.pdf12 Nov 2024
Details of encumbrances concerned to FinanceFile: 2 Legal Ecumbarance.pdf11 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Updated Commencement Certificate.pdf11 Nov 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate (3).pdf11 Nov 2024
CERSAI detailsFile: CERSAI Declaration_page-0001.pdf11 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A declaration about separate bank account.pdf11 Nov 2024
Details of encumbrances concerned to LegalFile: 2 Legal Ecumbarance.pdf11 Nov 2024
Other - TechnicalFile: ANNEXURE - A.pdf11 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Updated FY 2022.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30092024 CA.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG 30092024.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: 31122022.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: 30092024.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: 30062024.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: 31032023.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: 31032022.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: 30062023.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A (2).pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From -3.pdf6 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng certificate.pdf27 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: EAGLE INVNTOARY.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Inventory.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Jan 2024

How this compares with Pune

55%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EAGLE ERA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SUS13,700+ in Pune

Builder: EAGLE REALITIES

EAGLE REALITIES has 1 registration on MahaRERA, including EAGLE ERA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if EAGLE ERA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EAGLE ERA?

The registered promoter entity is EAGLE REALITIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EAGLE ERA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EAGLE ERA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EAGLE ERA?

The professionals named in the filing: Architect: NLESH SASWADE; Engineer: suhel sanjay moholkar; Engineer: RK RANDHAVE; Chartered Accountant: ANUPAMA shetty; Chartered Accountant: Ganesh Gapatand Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EAGLE ERA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EAGLE ERA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EAGLE ERA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.