Home / Browse projects / Latur, Maharashtra / DURWANKUR RESIDENCY

Registration lapsed No litigation declared Residential / Group Housing project

DURWANKUR RESIDENCY

By BARURE B K AND DEVBELOPERS

RG-MH-51645 · RERA P52400032384 · Last updated on MahaRERA portal: 12 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 29 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Latur registration emailed to you, free during the pilot beta.
May 2024Possession promised29 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 25 documents Report an error

DURWANKUR RESIDENCY is a Residential / Group Housing project by BARURE B K AND DEVBELOPERS in Latur, Maharashtra, registered with MahaRERA as P52400032384 on 4 Jan 2022. Possession was promised by 14 May 2024 and is now 29 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameDURWANKUR RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • AMBEJOGAI ROAD
    • BEHIND AJINKYA MEGA CITY
    • LATUR
    • Latur (M Cl)
    • Latur
    • 413512
  • Pincode413512
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52400032384
  • ReraGenie IDRG-MH-51645

Builder

  • NameBARURE B K AND DEVBELOPERS
  • Entity typeOthers
  • Named personBhagwat Kamlakar Barure
  • Authorized PartnerBHAGWAT KAMLAKAR BARURE Kamlakar Barure

Key dates

29 months past promisethis monthRegisteredJan 2022First promiseMay 2023Revised toMay 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Jan 2022
  • Promised completion14 May 2024
  • Revised completionRevised to 14 May 2024 (originally 15 May 2023)
  • Buildings1 building record
  • Documents filed25 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DURWANKUR RESIDENCYNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

DURWANKUR RESIDENCY: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership8

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area445 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
LandownerVillageDistrict
Nagesh Narsing BhandarePangaonLatur
Swarupa Narsing BhandarePangaonLatur
Mangalbai Babruwan RachmaleMahalangra Wadi Latur
Raj Navnath BhandarePangaonLatur
Manjusha Ganesh MurmudeLatur (M Cl)Latur
Sonubai Abhimanyu ChittadePangaonLatur
Divya Shrikant HaridasPangaonLatur
Radhabai Ram HaridasPangaonLatur

Approvals and building plan

Sanctioning authorityLatur Municipal Corporation
Permissible FSI742.9
Proposed, not sanctioned743 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWADGAVE PLAZA, NEAR VISHWA SUPER MARKET, BARSHI ROAD, LATUR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRITI VIVEK PATWARI
EngineerBHAGWAT KAMLAKAR BARURE
Chartered AccountantGANESH MAHAPURKAR
PartnerRole in project
BARURE B K AND DEVBELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52400016816May 2023 → May 2024

Reason as filed by the promoterExternal Dependencies: We encountered dependencies on external entities, such as vendors, regulatory bodies, or third-party contractors, whose delays or unavailability impacted our ability to complete certain project tasks on time. Despite our proactive engagement, these external factors were beyond our direct control.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Nov 2024

Documents filed25

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Durwankur Form 4.pdf12 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Durwankur Form 5.pdf12 Dec 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Durwankur Residency Society Reg.pdf10 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Durwankur Residency .pdf15 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Durwankur Residency.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf28 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2021-22.pdf28 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2022-23.pdf28 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22.pdf28 Mar 2023
CERSAI detailsFile: CERSAI_Search_Report_200227008478_For_Asset_Based_Search_31_12_2021_11_13_37_942.pdf31 Dec 2021
Declaration in FORM BFile: Form B.pdf17 Dec 2021
Proforma of Allotment letterFile: 2 Proforma of the allotment letter and agreement for sale.pdf27 Nov 2021
OtherFile: 1 Other.pdf27 Nov 2021
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf15 Nov 2021
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf3 Nov 2021
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf3 Nov 2021
Proforma of Allotment letterFile: 1 Proforma of the allotment letter and agreement for sale (1).pdf3 Nov 2021
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf21 Oct 2021
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf20 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf20 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (1).pdf20 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Certificate.pdf20 Oct 2021
Details of encumbrancesFile: 1 Details of encumbrances.pdf5 Oct 2021
PAN CardFile: 1 PAN Card.pdf11 Sep 2021

How this compares with Latur

10%of Latur projects moved their completion datethis one moved by 12 months
31%of Latur registrations have lapsed or been cancelledthis one is among them

Computed across the 150+ Latur projects on ReraGenie, from their own filings.

Keep DURWANKUR RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BEHIND AJINKYA MEGA CITY, LATUR150+ in Latur

2 kmDURWANKUR RESIDENCYCompleted 3Lapsed / revoked 3Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: BARURE B K AND DEVBELOPERS

BARURE B K AND DEVBELOPERS has 1 registration on MahaRERA, including DURWANKUR RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Latur district page.

Frequently asked questions

What does it mean that DURWANKUR RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if DURWANKUR RESIDENCY is delayed beyond 14 May 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DURWANKUR RESIDENCY?

The registered promoter entity is BARURE B K AND DEVBELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DURWANKUR RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DURWANKUR RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DURWANKUR RESIDENCY?

The professionals named in the filing: Architect: PRITI VIVEK PATWARI; Engineer: BHAGWAT KAMLAKAR BARURE; Chartered Accountant: GANESH MAHAPURKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DURWANKUR RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DURWANKUR RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DURWANKUR RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.