Home / Browse projects / Pune, Maharashtra / DOLPHIN PALMS WINGS C, D AND E

Registered No litigation declared Residential / Group Housing project

DOLPHIN PALMS WINGS C, D AND E

By M/S DOLPHIN REALTY

RG-MH-65068 · RERA P52100055197 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
12 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 88%
38 of 178Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 131 documents Report an error

DOLPHIN PALMS WINGS C, D AND E is a Residential / Group Housing project by M/S DOLPHIN REALTY in Pune, Maharashtra, registered with MahaRERA as P52100055197 on 11 Mar 2024. Possession is promised by 31 Mar 2027. 140 of the 178 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete.

At a glance

Project

  • NameDOLPHIN PALMS WINGS C, D AND E
  • TypeResidential / Group Housing
  • Location
    • RAVET
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055197
  • ReraGenie IDRG-MH-65068

Builder

  • NameM/S DOLPHIN REALTY
  • Entity typePartnership
  • PartnersUMESH SURESH PARASWAR, SANTOSH SUWALALJI LALWANI, POONAM HARISH AGARWAL, URMILA PANDURANG PALLEWAR, JATINDERKUMAR PREMCHAND GOEL, UMANG RAJESH AGARWAL, Rahul Premparakash Agarwal, SURAJ CHANDRAPRAKASH SHARMA, UDAY SURESH PARASWAR

Key dates

this monthRegisteredMar 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Mar 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed131 files

Current status

79%140 of 178 units booked
83.0%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DOLPHIN PALMS WING CNA141248048
DOLPHIN PALMS WING DNA151352052
DOLPHIN PALMS WING ENA151378078

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 88%.

DOLPHIN PALMS WING C44%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
DOLPHIN PALMS WING D44%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
DOLPHIN PALMS WING E45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure88%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed122

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots122
Open Space122
BuildingOpen SpaceTotal
DOLPHIN PALMS WING C3232
DOLPHIN PALMS WING D1212
DOLPHIN PALMS WING E7878

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,070 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jul 2025
LandownerVillageDistrict
CHAITRALI KIRAN KHANEKARRavetPune
DAULAT PANDURANG BHONDVERavetPune
KIRTI ABHIJEET PHADKERavetPune
KULDEEP DAULAT BHONDVERavetPune
SUSHILA DAULAT BHONDVERavetPune

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI16656.52
Proposed, not sanctioned16,050 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 1, SECTOR 27A PRADHIKARAN, NIGDI
Estimated costRs 47.00 cr
Cost incurredRs 38.99 cr
Work done82.95%
BuildingWingEstimatedIncurred
DOLPHIN PALMS WING ENARs 17.00 crRs 14.10 cr
DOLPHIN PALMS WING CNARs 12.75 crRs 10.57 cr
DOLPHIN PALMS WING DNARs 12.75 crRs 10.57 cr
-NARs 4.50 crRs 3.74 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCUBIX ARCHITECTS ASSOCIATES
EngineerAKASH KASBE
EngineerJITENDRA SHARMA
Chartered AccountantNAVDEEP JINDAL
Chartered AccountantPGMJ & ASSOCIATES
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
M/S DOLPHIN REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed131

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 131 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A FY 25-26_compressed.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM 3 FINAL.pdf20 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A_compressed.pdf14 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf15 Jan 2026
Withdrawal Update Form 2File: Form 2_compressed.pdf15 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf15 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 Final.pdf29 Nov 2025
Withdrawal Update Form 1File: Form 1.pdf20 Oct 2025
Withdrawal Update Form 1File: Form 1.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf20 Oct 2025
Withdrawal Update Form 1File: Form 1_compressed.pdf4 Oct 2025
Withdrawal Update Form 2File: Form 2_compressed.pdf4 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf4 Oct 2025
Form 1File: Form 1 Final.pdf20 Jul 2025
Form 2File: Form 2 Final.pdf20 Jul 2025
Form 3File: Form 3 Final_compressed.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Circular Final.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final_compressed.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Circular Final.pdf20 Apr 2025
Layout approvalFile: Layout Final Uploaded.pdf11 Mar 2025
Building plan approvalFile: Sanctioned Plans -2.pdf11 Mar 2025
Building plan approvalFile: Sanctioned Plans -3.pdf11 Mar 2025
Building plan approvalFile: Sanctioned Plans -4.pdf11 Mar 2025
Building plan approvalFile: Sanctioned Plans -5.pdf11 Mar 2025
Building plan approvalFile: Sanctioned Plans -6.pdf11 Mar 2025
Building plan approvalFile: Sanctioned Plans -7.pdf11 Mar 2025
Building plan approvalFile: Sanctioned Plans -8.pdf11 Mar 2025
Building plan approvalFile: Sanctioned Plans -9.pdf11 Mar 2025
Building plan approvalFile: Sanctioned Plans -10.pdf11 Mar 2025
Building plan approvalFile: Sanctioned Plans -9.pdf11 Mar 2025
Copy of Layout Approval (in case of layout)File: Layout Final Uploaded.pdf11 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plans -2.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plans -3.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plans -4.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plans -5.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plans -6.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plans -7.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plans -8.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plans -9.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plans -10.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plans -9.pdf11 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final_compressed.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf18 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Final.pdf20 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final_compressed.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf19 Oct 2024
Layout approvalFile: Final Layout_compressed.pdf12 Aug 2024
Building plan approvalFile: Building 1_compressed.pdf12 Aug 2024
Building plan approvalFile: Building 2.pdf12 Aug 2024
Building plan approvalFile: Building 3_compressed.pdf12 Aug 2024
Building plan approvalFile: Building 4_compressed.pdf12 Aug 2024
Building plan approvalFile: Building 5.pdf12 Aug 2024
Building plan approvalFile: Building 6.pdf12 Aug 2024
Building plan approvalFile: Building 7.pdf12 Aug 2024
Copy of Layout Approval (in case of layout)File: Final Layout_compressed.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 1_compressed.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 2.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 3_compressed.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 4_compressed.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 5.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 6.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 7.pdf12 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Dolphin Palms_Commencement Certificate_04-07-2024.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Realty_Form-1_01-07-2024_compressed.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Realty_Form-2_15-07-2024_compressed.pdf19 Jul 2024

How this compares with Pune

79%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DOLPHIN PALMS WINGS C, D AND E on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAVET13,700+ in Pune

2 kmDOLPHIN PALMS WINGS C, DCompleted 93Lapsed / revoked 38Other 79Dot size: filed unitsN

Filed coordinates, straight-line distance. 210 registered projects within 2 km.

Builder: M/S DOLPHIN REALTY

M/S DOLPHIN REALTY has 1 registration on MahaRERA, including DOLPHIN PALMS WINGS C, D AND E. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if DOLPHIN PALMS WINGS C, D AND E is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DOLPHIN PALMS WINGS C, D AND E?

The registered promoter entity is M/S DOLPHIN REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DOLPHIN PALMS WINGS C, D AND E?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DOLPHIN PALMS WINGS C, D AND E?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DOLPHIN PALMS WINGS C, D AND E?

The professionals named in the filing: Architect: CUBIX ARCHITECTS ASSOCIATES; Engineer: AKASH KASBE; Engineer: JITENDRA SHARMA; Chartered Accountant: NAVDEEP JINDAL; Chartered Accountant: PGMJ & ASSOCIATES; Chartered Accountant: NITISH VAIDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DOLPHIN PALMS WINGS C, D AND E?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DOLPHIN PALMS WINGS C, D AND E. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DOLPHIN PALMS WINGS C, D AND E to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.