ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Dnyanmanjula

Registered No litigation declared Residential / Group Housing project

Dnyanmanjula

By Veer Buildcon

RG-MH-72825 · RERA P52100018197 · Last updated on MahaRERA portal: 16 Oct 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 74 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 74 months from the original
8 of 11Construction stages donefurthest along: Installation of Lifts, 95%
4 of 16Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

Dnyanmanjula is a Residential / Group Housing project by Veer Buildcon in Pune, Maharashtra, registered with MahaRERA as P52100018197 on 15 Oct 2018. Possession is promised by 31 Dec 2026. The completion date has moved by 74 months from the original filing. 12 of the 16 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameDnyanmanjula
  • TypeResidential / Group Housing
  • Location
    • VILLAGE BAVADHAN BK
    • BAVADHAN
    • Bavdhan Kh.
    • Haveli
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100018197
  • ReraGenie IDRG-MH-72825

Builder

  • NameVeer Buildcon
  • Entity typeCompany
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2018First promiseOct 2020Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Oct 2018
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 1 Oct 2020)
  • Buildings1 building record
  • Documents filed107 files

Current status

75%12 of 16 units booked

Figures as on 16 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DnyanmanjulaNA4416016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

Dnyanmanjula: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 16 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area516 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI898.76
Proposed, not sanctioned358 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGALORE IT PARK LMD CHOWK BAVADHAN PUNE 411021

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShivanand swami
Chartered AccountantSandip Aswale & Company
PartnerRole in project
Veer Buildcon-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024592Oct 2020 → Jul 2025

Reason as filed by the promoterDue to OC not receive from Corporation.

EXT52100013798Oct 2020 → Jun 2024

Reason as filed by the promoterDue to changes in UDCPR, we received revised commencement certificate on 23/01/2023. Also resolution of allottees is attached to change the date of completion of project to 30 June 2024.

EXT52100003643Oct 2020 → Oct 2021

Reason as filed by the promoterObtained revised Sanction on dated 03-06-2019 hence apartment areas got revised . But we have not sold any flat yet.

EA16102518139Oct 2020 → Dec 2026

Reason as filed by the promoterSince OC not received from Pune Municipal Corporation.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 22 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf16 Oct 2025
Form 2File: 25 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf16 Oct 2025
Form 3File: 27 Certificates of CA (Form 3).pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold_ booked inventory.pdf16 Oct 2025
Withdrawal Update Form 1File: 30-06-2024.pdf16 Oct 2025
Withdrawal Update Form 1File: 30-06-2024.pdf16 Oct 2025
Withdrawal Update Form 2File: F2- June 2024.pdf16 Oct 2025
Withdrawal Update Form 2File: F2- June 2024.pdf16 Oct 2025
Withdrawal Update Form 3File: June 2024.pdf16 Oct 2025
Withdrawal Update Form 3File: June 2024.pdf16 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2018.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2019.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-09-2018.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2018.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2019.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2018.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2019.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-09-2019.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2019.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2021.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2021.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2021.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2022.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2022.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-09-2022.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2022.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2023.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2023.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-09-2023.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2023.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2024.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2024.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2- March 2018.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2- June 2018.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-Sept 2018.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2- Dec 2018.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2- March 2019.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-June 2019.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-Sept 2019.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-Dec 2019.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-March 2020.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-June 2020.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-Sept 2020.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-Dec 2020.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2- March 2021.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-June 2021.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2- Sept 2021.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-Dec 2021.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-March 2022.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-June 2022.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-Sept 2022.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-Dec 2022.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2- March 2023.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2- June 2023.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2- Dec 2023.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2- March 2024.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2- June 2024.pdf12 Aug 2024
Certificates of CA (Form 3)File: March 2018.pdf12 Aug 2024
Certificates of CA (Form 3)File: June 2018.pdf12 Aug 2024
Certificates of CA (Form 3)File: Sept 2018.pdf12 Aug 2024
Certificates of CA (Form 3)File: Dec 2018.pdf12 Aug 2024
Certificates of CA (Form 3)File: March 2019.pdf12 Aug 2024
Certificates of CA (Form 3)File: June 2019.pdf12 Aug 2024
Certificates of CA (Form 3)File: Sept 2019.pdf12 Aug 2024
Certificates of CA (Form 3)File: Dec 2019.pdf12 Aug 2024
Certificates of CA (Form 3)File: March 2020.pdf12 Aug 2024
Certificates of CA (Form 3)File: June 2020.pdf12 Aug 2024
Certificates of CA (Form 3)File: Sept 2020.pdf12 Aug 2024
Certificates of CA (Form 3)File: Dec 2020.pdf12 Aug 2024
Certificates of CA (Form 3)File: March 2021.pdf12 Aug 2024
Certificates of CA (Form 3)File: June 2021.pdf12 Aug 2024
Certificates of CA (Form 3)File: Sept 2021.pdf12 Aug 2024
Certificates of CA (Form 3)File: Dec 2021.pdf12 Aug 2024
Certificates of CA (Form 3)File: March 2022.pdf12 Aug 2024
Certificates of CA (Form 3)File: June 2022.pdf12 Aug 2024
Certificates of CA (Form 3)File: Sept 2022.pdf12 Aug 2024
Certificates of CA (Form 3)File: Dec 2022.pdf12 Aug 2024
Certificates of CA (Form 3)File: March 2023.pdf12 Aug 2024
Certificates of CA (Form 3)File: June 2023.pdf12 Aug 2024
Certificates of CA (Form 3)File: Sept 2023 (1).pdf12 Aug 2024

How this compares with Pune

75%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 74 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dnyanmanjula on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BAVADHAN13,700+ in Pune

2 kmDnyanmanjulaCompleted 46Lapsed / revoked 30Other 58Dot size: filed unitsN

Filed coordinates, straight-line distance. 134 registered projects within 2 km.

Builder: Veer Buildcon

Veer Buildcon has 2 registrations on MahaRERA, including Dnyanmanjula and SHANTAI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Dnyanmanjula is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dnyanmanjula?

The registered promoter entity is Veer Buildcon, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dnyanmanjula?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dnyanmanjula?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dnyanmanjula?

The professionals named in the filing: Architect: Shivanand swami; Chartered Accountant: Sandip Aswale & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dnyanmanjula?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dnyanmanjula. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dnyanmanjula to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.