ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / DIAS RESIDENCY PARK

Registered No litigation declared Others project

DIAS RESIDENCY PARK

By DIAS PROPERTIES & PROJECTS

RG-MH-23499 · RERA P99000078811 · Last updated on MahaRERA portal: 17 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

DIAS RESIDENCY PARK is a Others project by DIAS PROPERTIES & PROJECTS in Palghar, Maharashtra, registered with MahaRERA as P99000078811 on 13 Jan 2025. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameDIAS RESIDENCY PARK
  • TypeOthers
  • Location
    • Sativali Road
    • Village Sativali
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • RERA no.P99000078811
  • ReraGenie IDRG-MH-23499

Builder

  • NameDIAS PROPERTIES & PROJECTS
  • Entity typePartnership
  • PartnerBarthol Dias
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Jan 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CFC BuildingNA40000
Residential Building No 2NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

CFC Building27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Residential Building No 227%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Closed/Covered2
Open Space44
BuildingClosed/CoveredOpen SpaceTotal
CFC Building11314
Residential Building No 213132

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,258 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Jun 2025
LandownerVillageDistrict
Chintaman JadhavVasai-Virar City (M Corp)Palghar
Jayashree JadhavVasai-Virar City (M Corp)Palghar
Anand JadhavVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVASAI-VIRAR CITY MUNICIPAL CORPORATION
Permissible FSI4351.34
Proposed, not sanctioned2,176 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPADAMAVATI GRACE, OPP. SUNRISE SUPERMARKET, NR. SHREE KRISHNA COMPLEX, VASAI- 401202.

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEN CON
EngineerSANJAY S NARANG
Chartered AccountantAnilkumar Mehta
PartnerRole in project
DIAS PROPERTIES & PROJECTS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Annexure A Arcnitects Cerificate.pdf17 Jun 2026
Form 2File: Form 2 Annexure B Engineer Certifcate.pdf17 Jun 2026
Form 3File: Form 3 CA Jan To March.pdf17 Jun 2026
Disclosure of Sold and Booked InventoryFile: Discolusre of Slod and Booked Inventory.pdf17 Jun 2026
Self-declaration of Quarterly ProgressFile: Self_Declaration_QPR MahaRERA.pdf17 Jun 2026
Form 1File: Annexure-A Form 1 Certifcate ..pdf13 Mar 2026
Form 2File: Annexure-B Form 2 Enginering Certifcate..pdf13 Mar 2026
Form 3File: From 3 CA Certifcate.pdf13 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold And Unsold Inventory.pdf13 Mar 2026
Self-declaration of Quarterly ProgressFile: Self_Declaration_QPR MahaRERA.pdf13 Mar 2026
Form 1File: Form 1 Annexure A Arcnitects Cerificate.pdf13 Mar 2026
Form 2File: Form 2 Annexure B Engineer Certifcate.pdf13 Mar 2026
Form 3File: Form 3 CA.pdf13 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold and Unsold Inventory.pdf13 Mar 2026
Self-declaration of Quarterly ProgressFile: Self_Declaration_QPR MahaRERA.pdf13 Mar 2026
Form 1File: Form 1.pdf28 Jul 2025
Form 2File: Form 2.pdf28 Jul 2025
Form 3File: Form 3.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold &Unsold Inventory.pdf28 Jul 2025
Self-declaration of Quarterly ProgressFile: Self_Declaration_QPR MahaRERA.pdf28 Jul 2025
Form 1File: Form 1.pdf28 May 2025
Form 2File: Form 2.pdf28 May 2025
Form 3File: Form 3 CA.pdf28 May 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Inventory.pdf28 May 2025
Self-declaration of Quarterly ProgressFile: Self-Declaration.pdf28 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 2 Declaration about all RERA Designated Bank Accounts (Format A).pdf6 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank Declaration Format B-pages.pdf6 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3.pdf3 Jan 2025
Details of encumbrances concerned to FinanceFile: 3 a Details of encumbrances concerned to Finance.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 .pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf26 Dec 2024
Details of encumbrances concerned to LegalFile: 3 a Details of encumbrances concerned to Finance.pdf26 Dec 2024
Other - FinanceFile: Annexure A.pdf26 Dec 2024
Other - FinanceFile: Declaration regarding not selling units.pdf26 Dec 2024
Proforma of Allotment letterFile: Annexure I Proforma Allottement Letter.pdf12 Dec 2024
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf12 Dec 2024
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement.pdf12 Dec 2024
Proforma of Agreement for saleFile: Proforma Agreement for Sale_.pdf12 Dec 2024
Other - LegalFile: Declaration regarding not selling units.pdf10 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Eastate.pdf12 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclsure of Interest.pdf12 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CFC bearing no 214 CC 01122023.pdf18 Oct 2024
Building plan approvalFile: sanctioned CFC Building plan.pdf16 Oct 2024
Building plan approvalFile: Sanctioned Layout Sheet plan.pdf16 Oct 2024
Building plan approvalFile: Building No 2 plan Highlight.pdf16 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Building No 2 plan Highlight.pdf16 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Layout Sheet plan.pdf16 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: sanctioned CFC Building plan.pdf16 Oct 2024
Other - TechnicalFile: Declaration Cum Undertaking Annexure A.pdf16 Oct 2024
Other - TechnicalFile: Disclosure on CFC Bldg.pdf16 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate.pdf10 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for Secured and Unsecured Finance.pdf10 Oct 2024
Copy of the legal title reportFile: Legal Title Report 10 12 2024.pdf1 Jul 2024
Declaration in FORM BFile: Form B.pdf1 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: RDP BLDG NO 2 and CFC.pdf1 Jul 2024
Declaration about Commencement CertificateFile: Declaration about CC Dias Residency Park.pdf1 Jul 2024
CERSAI detailsFile: CERSAI Search Report.pdf1 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure on other Real estate interest-DPP Partner -DBR.pdf1 Jul 2024
Layout approvalFile: CC BLDG NO 2 PLAN.pdf18 Jun 2024
PAN CardFile: Pan Card.pdf18 Jun 2024
Details of encumbrances concerned to FinanceFile: Details of Encumbrance Concerned to Legal.pdf18 Jun 2024
Copy of Layout Approval (in case of layout)File: CC BLDG NO 2 PLAN.pdf18 Jun 2024
Details of encumbrances concerned to LegalFile: Details of Encumbrance Concerned to Legal.pdf18 Jun 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationRegisteredStatusPromisedDelivered
Dias Residency ParkP99000007801Sativali, PalgharAug 2017CompletedDec 2022Registered original: Jun 2021Late, Jan 2023

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DIAS RESIDENCY PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Sativali3,200+ in Palghar

Builder: DIAS PROPERTIES & PROJECTS

DIAS PROPERTIES & PROJECTS has 1 registration on MahaRERA, including DIAS RESIDENCY PARK. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if DIAS RESIDENCY PARK is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DIAS RESIDENCY PARK?

The registered promoter entity is DIAS PROPERTIES & PROJECTS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DIAS RESIDENCY PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DIAS RESIDENCY PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DIAS RESIDENCY PARK?

The professionals named in the filing: Architect: EN CON; Engineer: SANJAY S NARANG; Chartered Accountant: Anilkumar Mehta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DIAS RESIDENCY PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DIAS RESIDENCY PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DIAS RESIDENCY PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.