ReraGenieLog inGet a buyer report

Home / Browse projects / DIAMOND HERITAGE-2

Registered No litigation declared Residential / Group Housing project

DIAMOND HERITAGE-2

By DIAMOND PALM INFRASTRUCTURE PRIVATE LIMITED

RG-MH-33313 · RERA P99000080666 · Last updated on MahaRERA portal: 12 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: .
Dec 2030Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Plinth, 50%
234 of 234Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

DIAMOND HERITAGE-2 is a Residential / Group Housing project by DIAMOND PALM INFRASTRUCTURE PRIVATE LIMITED in PELHAR, 401208, registered with MahaRERA as P99000080666 on 23 Jun 2025. Possession is promised by 31 Dec 2030. 0 of the 234 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameDIAMOND HERITAGE-2
  • TypeResidential / Group Housing
  • Location
    • PELHAR
    • 401208
  • Pincode401208
  • RERA no.P99000080666
  • ReraGenie IDRG-MH-33313

Builder

  • NameDIAMOND PALM INFRASTRUCTURE PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsAAYSHA ABDURRAZZAK SELIYA, AFREEN ABDURRAZZAK SELIYA, AKIF RASOOL SOLJAR, JUNED HABIBURREHMAN SHELIA, AMZAD KASAM PATEL
  • Other registrations1 more →

Key dates

this monthRegisteredJun 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jun 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed55 files

Current status

0%0 of 234 units booked
3.8%Work done, per cost certificate

Figures as on 12 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 20NA15152340234

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 50%.

BUILDING NO 20: 14% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed233

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots233
Closed/Covered1
Open Space232

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,247 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Aug 2025
LandownerVillageDistrict
METRO DEVELOPERSVasai-Virar City (M Corp)Palghar
RELIABLE TARANGVasai-Virar City (M Corp)Palghar
AVORA REALTYVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVVCMC
Permissible FSI12675.29
Proposed, not sanctioned12,675 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Ground Floor, Vrindavan, Building No. 15, Shivdham Complex, Dindoshi, Malad East, Mumbai.400097, Maharashtra
Estimated costRs 49.35 cr
Cost incurredRs 1.89 cr
Work done3.83%
BuildingWingEstimatedIncurred
BUILDING NO 20NARs 37.83 crRs 1.89 cr
-NARs 11.51 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIPL ADHIA
EngineerARIF RUPALWALA
EngineerASRAR AHMED JATOO
Chartered AccountantASHWIN NAIR
PartnerRole in project
DIAMOND PALM INFRASTRUCTURE PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jun 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jun 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 SEP 25.pdf12 Mar 2026
Withdrawal Update Form 1File: FORM 1 SEP 25.pdf12 Mar 2026
Withdrawal Update Form 2File: FORM 2 SEP 25.pdf12 Mar 2026
Withdrawal Update Form 2File: FORM 2 SEP 25.pdf12 Mar 2026
Withdrawal Update Form 3File: FORM 3 SEP 25.pdf12 Mar 2026
Withdrawal Update Form 3File: FORM 3 SEP 25.pdf12 Mar 2026
Withdrawal Update Form 1File: FORM 1 JUN 25.pdf25 Aug 2025
Withdrawal Update Form 1File: FORM 1 JUN 25.pdf25 Aug 2025
Withdrawal Update Form 2File: FORM 2 JUN 25.pdf25 Aug 2025
Withdrawal Update Form 2File: FORM 2 JUN 25.pdf25 Aug 2025
Withdrawal Update Form 3File: FORM 3 JUN 25.pdf25 Aug 2025
Withdrawal Update Form 3File: FORM 3 JUN 25.pdf25 Aug 2025
Commencement Certificates / NA Order for plotted developmentFile: VVCMC LETTER LATEST.pdf17 Jun 2025
Other - TechnicalFile: VVCMC LETTER LATEST.pdf17 Jun 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: landowner declaration latest.pdf17 Jun 2025
Layout approvalFile: LAYOUT PLAN_compressed (1).pdf4 Jun 2025
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN_compressed (1).pdf4 Jun 2025
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf23 May 2025
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf23 May 2025
Commencement Certificates / NA Order for plotted developmentFile: appendix f of bldg 18.pdf23 May 2025
Other - TechnicalFile: dd additional fee.pdf23 May 2025
Other - TechnicalFile: appendix f of bldg 18.pdf23 May 2025
Other - TechnicalFile: plot area calculation.pdf23 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: landowner bank dec.pdf21 Apr 2025
Other - TechnicalFile: CC VERIFICATION MAIL.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 REVISED.pdf3 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: PLINTH CLARIFICATION.pdf3 Apr 2025
Other - LegalFile: DEED WITH BIFURCATION OF BUILDING.pdf3 Apr 2025
Other - LegalFile: declaration.pdf3 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A REVISED.pdf3 Apr 2025
Other - TechnicalFile: PLOT AREA DEC.pdf3 Apr 2025
Other - TechnicalFile: ANNEXURE A-PLOT AREA.pdf3 Apr 2025
Other - TechnicalFile: declaration.pdf3 Apr 2025
Other - TechnicalFile: DEED WITH BIFURCATION OF BUILDING.pdf3 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B REVISED.pdf3 Apr 2025
Copy of the legal title reportFile: title_compressed.pdf18 Mar 2025
Declaration in FORM BFile: FORM B-DIAMOND OWNER.pdf18 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE OF FINANCE.pdf18 Mar 2025
Building plan approvalFile: BLUE PRINT_compressed (1)_compressed.pdf17 Mar 2025
PAN CardFile: PAN COMPANY.pdf17 Mar 2025
Details of encumbrances concerned to FinanceFile: LOE-LEGAL.pdf17 Mar 2025
Details of encumbrances concerned to FinanceFile: LOE-FINANCE.pdf17 Mar 2025
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf17 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf17 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf17 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf17 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT_compressed (1)_compressed.pdf17 Mar 2025
Declaration about Commencement CertificateFile: FORMAT-D.pdf17 Mar 2025
CERSAI detailsFile: CERSAI.pdf17 Mar 2025
Deviation Report with respect to Allotment letterFile: DEVIATION-ALLOTMENT.pdf17 Mar 2025
Details of encumbrances concerned to LegalFile: LOE-FINANCE.pdf17 Mar 2025
Details of encumbrances concerned to LegalFile: LOE-LEGAL.pdf17 Mar 2025
Deviation Report with respect to model copy of AgreementFile: DEVIATION-AGREEMENT.pdf17 Mar 2025
Proforma of Agreement for saleFile: AFS.pdf17 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (1).pdf17 Mar 2025

Keep DIAMOND HERITAGE-2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PELHAR

Builder: DIAMOND PALM INFRASTRUCTURE PRIVATE LIMITED

DIAMOND PALM INFRASTRUCTURE PRIVATE LIMITED has 2 registrations on MahaRERA, including DIAMOND HERITAGE 1 and DIAMOND HERITAGE-2. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if DIAMOND HERITAGE-2 is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DIAMOND HERITAGE-2?

The registered promoter entity is DIAMOND PALM INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DIAMOND HERITAGE-2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DIAMOND HERITAGE-2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DIAMOND HERITAGE-2?

The professionals named in the filing: Architect: VIPL ADHIA; Engineer: ARIF RUPALWALA; Engineer: ASRAR AHMED JATOO; Chartered Accountant: ASHWIN NAIR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DIAMOND HERITAGE-2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DIAMOND HERITAGE-2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DIAMOND HERITAGE-2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.