ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / DARUL MUSTAFA

Registered No litigation declared Residential / Group Housing project

DARUL MUSTAFA

By Citymaker Builders Private Limited

RG-MH-34948 · RERA P51900048664 · Last updated on MahaRERA portal: 1 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
8 of 11Construction stages donefurthest along: Basement (if any), 0%
63 of 72Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

DARUL MUSTAFA is a Residential / Group Housing project by Citymaker Builders Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900048664 on 12 Jan 2023. Possession is promised by 31 Dec 2027. 9 of the 72 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameDARUL MUSTAFA
  • TypeResidential / Group Housing
  • Location
    • DLIMA STREET
    • Mazgaon
    • Mumbai City
    • 400010
  • Pincode400010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900048664
  • ReraGenie IDRG-MH-34948

Builder

  • NameCitymaker Builders Private Limited
  • Entity typeCompany
  • CINU45202BR2008PTC014010
  • GSTIN27AACCC4081A1Z5
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorWASIUR AZIZUR REHMAN SHAIKH
  • Other registrations2 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredJan 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Jan 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed103 files

Current status

12%9 of 72 units booked
39.5%Work done, per cost certificate

Figures as on 1 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DARUL MUSTAFANA261968472

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

DARUL MUSTAFA: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 1 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes50%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered20

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area436 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Jul 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2982.6
Proposed, not sanctioned2,848 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMumbai
Estimated costRs 15.90 cr
Cost incurredRs 6.28 cr
Work done39.5%
BuildingWingEstimatedIncurred
DARUL MUSTAFANARs 14.31 crRs 6.28 cr
-NARs 1.59 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTECHNO CONSULTANTS
EngineerKAISER NADEEM
EngineerZZ CONSULTANT
Chartered AccountantB M CHAUHAN & CO
Chartered AccountantH. S. SHAH & ASSOCIATES
PartnerRole in project
Citymaker Builders Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q3 25-26 Darul Mustafa Dec-25.pdf1 Apr 2026
Withdrawal Update Form 2File: Form 2 Q3 25-26 Darul Mustafa Dec-25.pdf1 Apr 2026
Withdrawal Update Form 3File: Form 3 Q3 25-26 Darul Mustafa Dec-25.pdf1 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf25 Mar 2026
Form 1File: Form 1 as on 31-12-23 Q3 23-24.pdf26 Feb 2026
Form 2File: Form 2 As on 31-12-23 Q3 23-24.pdf26 Feb 2026
Form 3File: Form-3 As on 31-12-23 Q3 23-24.pdf26 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD AND UNSOLD Dec-23.pdf26 Feb 2026
Form 1File: Form 1 as on 31-12-24 Q3 24-25 (Darul Mustafa)..pdf26 Feb 2026
Form 2File: Form-2 Darul 31-12-24 Signed.pdf26 Feb 2026
Form 3File: Signed Final Form-3Darul Mustafa Dec-23.pdf26 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD AND UNSOLD Dec-24.pdf26 Feb 2026
Form 2A (FY 2022-2023)File: Form 2A 22-23.pdf26 Feb 2026
Form 2A (FY 2023-2024)File: Form 2A_ 23-24.pdf26 Feb 2026
Form 5 (FY 2024-2025)File: Form-5 Darul Mustafa 24-25.pdf21 Jan 2026
Form 5 (FY 2022-2023)File: FORM 5 22-23.pdf5 Jan 2026
Form 5 (FY 2023-2024)File: FORM 5 23-24.pdf5 Jan 2026
Form 1File: Form-1 As on 31-3-23 (Q4 22-23).pdf27 Dec 2025
Form 2File: Form 2 As on 31-3-23 (Q4 22-23).pdf27 Dec 2025
Form 3File: Form-3 As on 31-3-23 (Q4 22-23).pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of sold unsold.pdf27 Dec 2025
Form 1File: Form-1 As on 30-6-23 (Q1 23-24).pdf27 Dec 2025
Form 2File: Form 2 As on 30-6-23 (Q1 23-24).pdf27 Dec 2025
Form 3File: Form-3 As on 30-6-23 (Q1 23-24).pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD UNSOLD Jun-23.pdf27 Dec 2025
Form 1File: Form-1 As on 30-9-23 (Q2 23-24).pdf27 Dec 2025
Form 2File: Form 2 As on 30-9-23 (Q2 23-24).pdf27 Dec 2025
Form 3File: Form-3 As on 30-9-23 (Q1 23-24).pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD UNSOLD Sep-23.pdf27 Dec 2025
Form 1File: Form 1 as on 31-03-24 Q4 23-24_ Darul Mustafa.pdf27 Dec 2025
Form 2File: Form 2 As on 31-03-24 Q4 23-24 Darul Mustafa.pdf27 Dec 2025
Form 3File: Form-3 As on 31-03-24 Q4 23-24.pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD UNSOLD Mar-24.pdf27 Dec 2025
Form 1File: Form 1 as on 30-06-24 Q1 24-25 (Darul Mustafa).pdf27 Dec 2025
Form 2File: Form 2 As on 30-06-24 Q1 24-25 Darul Mustafa.pdf27 Dec 2025
Form 3File: Form-3 As on 30-06-24 Q1 24-25_compressed.pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD UNSOLD Jun-24.pdf27 Dec 2025
Form 1File: Form 1 as on 30-09-24 Q2 24-25 (Darul Mustafa).pdf27 Dec 2025
Form 2File: Form 2 As on 30-09-24 Q2 24-25 (Darul Mustafa).pdf27 Dec 2025
Form 3File: Form-3 As on 30-09-24 Q2 24-25.pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD UNSOLD Sep-24.pdf27 Dec 2025
Form 1File: Form-1 Mar-25 Signed.pdf27 Dec 2025
Form 2File: Form-2 31-03-2025 Signed.pdf27 Dec 2025
Form 3File: Form-3 As on 31-03-25 (Q4 24-25).pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD UNSOLD Mar-25.pdf27 Dec 2025
Withdrawal Update Form 1File: Form 1 Q2 25-26 Darul Mustafa sep-25.pdf27 Dec 2025
Withdrawal Update Form 2File: Form 2 Q2 25-26 Darul Mustafa sep-25.pdf27 Dec 2025
Withdrawal Update Form 3File: Form 3 Q2 25-26 Darul Mustafa sep-25.pdf27 Dec 2025
Withdrawal Update Form 1File: Form-1 Jun-25 Signed.pdf15 Dec 2025
Withdrawal Update Form 2File: Form-2 30-06-2025 Signed.pdf15 Dec 2025
Withdrawal Update Form 3File: Signed Final Form-3Darul Mustafa Jun-25.pdf15 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 As on 30-6-23 (Q1 23-24).pdf28 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 As on 30-9-23 (Q2 23-24).pdf28 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on 31-12-23 Q3 23-24.pdf28 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on 31-03-24 Q4 23-24_ Darul Mustafa.pdf28 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on 30-06-24 Q1 24-25 (Darul Mustafa).pdf28 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on 30-09-24 Q2 24-25 (Darul Mustafa).pdf28 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 As on 31-3-23 (Q4 22-23).pdf28 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 As on 30-06-24 Q1 24-25.pdf28 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 As on 30-09-24 Q2 24-25.pdf28 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 As on 31-03-24 Q4 23-24.pdf28 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 As on 31-12-23 Q3 23-24.pdf28 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 As on 30-9-23 (Q1 23-24).pdf28 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 As on 30-6-23 (Q1 23-24)_compressed.pdf28 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 As on 31-3-23 (Q4 22-23).pdf28 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 As on 31-3-23 (Q4 22-23).pdf28 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 As on 30-6-23 (Q1 23-24).pdf28 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 As on 30-9-23 (Q2 23-24).pdf28 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 As on 31-12-23 Q3 23-24.pdf28 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 As on 31-03-24 Q4 23-24 Darul Mustafa.pdf28 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 As on 30-06-24 Q1 24-25 Darul Mustafa.pdf28 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 As on 30-09-24 Q2 24-25 (Darul Mustafa).pdf28 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf28 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_ 23-24.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23-24.pdf28 Dec 2024
Copy of the legal title reportFile: 2 Copy of the legal title report.pdf21 Dec 2022
Copy of the legal title reportFile: Search Report_Old.pdf21 Dec 2022
Declaration in FORM BFile: Form B.pdf21 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf21 Dec 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
HASAN ALIP51900050081Jail Road, Maheshwari Road, Mumbai City98Mar 2023OngoingDec 2028Not due yet
CITY PRIDEGOLIBAR SANTACRUZ EAST MUMBAI 40005593-CompletedSep 2018Late, Jun 2020

How this compares with Mumbai City

12%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DARUL MUSTAFA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mazgaon780+ in Mumbai City

2 kmDARUL MUSTAFACompleted 5Lapsed / revoked 25Other 53Dot size: filed unitsN

Filed coordinates, straight-line distance. 83 registered projects within 2 km.

Builder: Citymaker Builders Private Limited

Citymaker Builders Private Limited has 3 registrations on MahaRERA, including DARUL MUSTAFA and HASAN ALI. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if DARUL MUSTAFA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DARUL MUSTAFA?

The registered promoter entity is Citymaker Builders Private Limited, a company as per the filing. Its CIN U45202BR2008PTC014010 and GSTIN 27AACCC4081A1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DARUL MUSTAFA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DARUL MUSTAFA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DARUL MUSTAFA?

The professionals named in the filing: Architect: TECHNO CONSULTANTS; Engineer: KAISER NADEEM; Engineer: ZZ CONSULTANT; Chartered Accountant: B M CHAUHAN & CO; Chartered Accountant: H. S. SHAH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DARUL MUSTAFA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DARUL MUSTAFA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DARUL MUSTAFA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.