ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / Darpan A Wing

Registered No litigation declared Residential / Group Housing project

Darpan A Wing

By THDC Siddhivinayak LLP

RG-MH-30298 · RERA P99000030707 · Last updated on MahaRERA portal: 24 Sep 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 34 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 34 months from the original
1 of 11Construction stages donefurthest along: Basement (if any), 0%
4 of 31Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 23 documents Report an error

Darpan A Wing is a Residential / Group Housing project by THDC Siddhivinayak LLP in Palghar, Maharashtra, registered with MahaRERA as P99000030707 on 8 Sep 2021. Possession is promised by 30 Jun 2027. The completion date has moved by 34 months from the original filing. 27 of the 31 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameDarpan A Wing
  • TypeResidential / Group Housing
  • Location
    • Mahim Road
    • Palghar
    • Shirgaon
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000030707
  • ReraGenie IDRG-MH-30298

Builder

  • NameTHDC Siddhivinayak LLP
  • Entity typeOthers
  • Named personsPawan Abhimanyu Singh, Vivek Omkar Singh

Key dates

this monthRegisteredSep 2021First promiseAug 2024Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Sep 2021
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 31 Aug 2024)
  • Buildings1 building record
  • Documents filed23 files

Current status

87%27 of 31 units booked
65.6%Work done, per cost certificate

Figures as on 24 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Darpan A WingNA8831031

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Darpan A Wing: 9% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area529 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Sep 2025
LandownerVillageDistrict
Umesh Vardichand JainBoisarPalghar

Approvals and building plan

Sanctioning authorityCOLLECTOR OFFICE PALGHAR
Permissible FSI891.51
Proposed, not sanctioned892 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Old Uma Villa, Mahim Road, Palghar, Thane 401404
Estimated costRs 1.60 cr
Cost incurredRs 1.05 cr
Work done65.62%
BuildingWingEstimatedIncurred
Darpan A WingNARs 1.40 crRs 1.05 cr
-NARs 20.05 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastu Shilp Associates
ArchitectNISHANT PATIL
EngineerB N Shah And Associates
EngineerVISHVAS S SHAH
Chartered AccountantVinit Gada And Associates
Chartered AccountantVINIT GADA
Chartered AccountantSWAPNESH & VINIT CHARTED ACCOUNTANT
PartnerRole in project
THDC Siddhivinayak LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20092502648Aug 2024 → Jun 2027

Reason as filed by the promoter1. While registering the project with MahaRERA,we had underestimated the project completion time which proved to be less for such a project. 2. Also due to Covid project got delayed which lead to lack of sales and Financial Difficulties 3. Still the project progress was on track but in between due to some issues with our labour contractor led to few months delay of works. 4. But rest assured,now the works are in full swing & will be completed with in the stipulated time lines of this extended date and OC will be obtained. 5. Also,we are uploading the PERTChart/work completion schedule of the p

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed23

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 June 2025.pdf24 Sep 2025
Withdrawal Update Form 2File: Form-2 June 2025.pdf24 Sep 2025
Withdrawal Update Form 3File: Darpan A wing Form 3.pdf24 Sep 2025
Form 1File: Form-1 June 2024.pdf20 Sep 2025
Form 2File: Form-2 June 2024.pdf20 Sep 2025
Form 3File: Form-3 June 2024.pdf20 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked June 2024.pdf20 Sep 2025
Form 1File: Form-1 September 2024.pdf20 Sep 2025
Form 2File: Form-2 September 2024.pdf20 Sep 2025
Form 3File: Form-3 September 2024.pdf20 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked 3092024.pdf20 Sep 2025
Copy of the legal title reportFile: Revised Title Report.pdf27 Aug 2021
Proforma of Allotment letterFile: Draft.pdf27 Aug 2021
Declaration about Commencement CertificateFile: Declaration about CC.pdf4 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Darpan A wing Form 3.pdf4 Aug 2021
PAN CardFile: PAN.pdf31 Jul 2021
Layout approvalFile: Layout.pdf17 Jul 2021
Building plan approvalFile: Layout.pdf17 Jul 2021
Details of encumbrancesFile: Declaration.pdf17 Jul 2021
Copy of Layout Approval (in case of layout)File: Layout.pdf17 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: Layout.pdf17 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: NA cum CC.pdf17 Jul 2021
Declaration in FORM BFile: Form B.pdf17 Jul 2021

How this compares with Palghar

87%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 34 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Darpan A Wing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Palghar3,200+ in Palghar

2 kmDarpan A WingCompleted 118Lapsed / revoked 61Other 128Dot size: filed unitsN

Filed coordinates, straight-line distance. 307 registered projects within 2 km.

Builder: THDC Siddhivinayak LLP

THDC Siddhivinayak LLP has 1 registration on MahaRERA, including Darpan A Wing. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Darpan A Wing is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Darpan A Wing?

The registered promoter entity is THDC Siddhivinayak LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Darpan A Wing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Darpan A Wing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Darpan A Wing?

The professionals named in the filing: Architect: Vastu Shilp Associates; Architect: NISHANT PATIL; Engineer: B N Shah And Associates; Engineer: VISHVAS S SHAH; Chartered Accountant: Vinit Gada And Associates; Chartered Accountant: VINIT GADA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Darpan A Wing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Darpan A Wing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Darpan A Wing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.