Home / Browse projects / Mumbai City, Maharashtra / Daffodil Heights

Registered No litigation declared Residential / Group Housing project

Daffodil Heights

By Shree Krishna Constructions

RG-MH-51785 · RERA P51900013369 · Last updated on MahaRERA portal: 10 Jun 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 84 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 84 months from the original
27 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 30%
197 of 326Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 255 documents Report an error

Daffodil Heights is a Residential / Group Housing project by Shree Krishna Constructions in Mumbai City, Maharashtra, registered with MahaRERA as P51900013369 on 26 Sep 2017. Possession is promised by 31 Dec 2029. The completion date has moved by 84 months from the original filing. 129 of the 326 units on this registration are recorded sold or booked, and 27 of 44 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameDaffodil Heights
  • TypeResidential / Group Housing
  • Location
    • Mumbai city
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900013369
  • ReraGenie IDRG-MH-51785

Builder

  • NameShree Krishna Constructions
  • Entity typePartnership
  • PartnersVishal Gulshan Chanda, Vimalkumar Kishanlal Hinger
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2017First promiseDec 2022Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Sep 2017
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 30 Dec 2022)
  • Buildings4 building records
  • Documents filed255 files

Current status

40%129 of 326 units booked
71.9%Work done, per cost certificate

Figures as on 10 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Daffodil Heights A WingNA232385691
Daffodil Heights B WingNA232296096
Daffodil Heights C wingNA222172072
Daffodil Heights D WingNA151467067

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 10 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 30%.

Daffodil Heights A Wing73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Daffodil Heights B Wing73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Daffodil Heights C wing73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Daffodil Heights D Wing30%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes55%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes55%
Water conservation /Rain water harvestingYes75%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed45

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots45
Closed/Covered45

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,161 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Mar 2026

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI10241.67
Proposed, not sanctioned6,103 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSector 17, Vashi
Estimated costRs 52.14 cr
Cost incurredRs 37.51 cr
Work done71.94%
BuildingWingEstimatedIncurred
Daffodil Heights A WingNARs 16.43 crRs 14.12 cr
Daffodil Heights D WingNARs 16.43 crRs 5.09 cr
Daffodil Heights B WingNARs 9.18 crRs 8.90 cr
Daffodil Heights C wingNARs 9.18 crRs 8.90 cr
-NARs 93.00 lakhRs 50.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAYUREE CONSULTANTS
EngineerMilind Arjun Wankhade
EngineerShravani Consultants
Chartered AccountantManish k Ramawati and Company
Chartered AccountantJB PATEL & ASSOCIATES
PartnerRole in project
Shree Krishna Constructions-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900013101Dec 2022 → Dec 2023

Reason as filed by the promoterDear Sir/ Madam, We have registered our Project “Daffodil Heights” located at Plot bearing / CTS / survey no- 35pt Village -Kanjur, Mumbai Suburban District pin 400078, vide Registration No. P51900013369 With RERA authority in the month of Sept 2017, we have committed Dec 31, 2021, as the possession date at the time of registration and it was extended to Dec 31, 2022, by the MahaRERA as per Order. Unfortunately, due to a delay in receiving the necessary commencement certificate from Slum Rehabilitation Authority, we have been unable to complete the project. As such, we are now requesting an ex

EXT51900018695Dec 2022 → Dec 2024

Reason as filed by the promoterWe would like to Summarize reasons for not getting consent from allottees in brief • In November 2023, a meeting was conducted with all allottees of the project to seek their consent for the extension. Unfortunately, despite our efforts, none of the allottees provided their consent for the project extension. • Despite our attempts to communicate and collaborate, it appears that the allottees are not currently willing to cooperate with us in extending the project. • We understand the importance of consensus in project-related decisions and have made sincere efforts to engage with the allottees.

EXT51900027290Dec 2022 → Dec 2029

Reason as filed by the promoterThe reasons for seeking an extension of the project registration are as follows: 1. Grant of Additional FSI: Recently, we were granted additional Floor Space Index (FSI) for the project, which has required us to apply for new approvals and consents to incorporate these changes into the project. This process has taken longer than anticipated, causing delays in the overall project timeline. 2. Part OC Application for Existing 3 Towers: We have submitted the application for the Part Occupation Certificate (OC) for the existing 3 towers of the project. As soon as we receive the Part OC, we will be

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000333989Tushar BobhateShree Krishna Contructions17/01/2023
CC006000000428715KRANTI AMRUT BENDAKEVimalkumar Kishanlal Hinger04/01/2024
CC006000000591110DARSHANA DILIP GADADESHREE KRISHNA CONSTRUCTIONS11/07/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed255

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 255 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RERA FORM 1 Architect Certificate Signed.pdf10 Jun 2026
Withdrawal Update Form 2File: Form 2 Daffodil heights March 26.pdf10 Jun 2026
Withdrawal Update Form 3File: Form 3 Daffodil Heights Mar 26- Final.pdf10 Jun 2026
Withdrawal Update Form 1File: form 1.pdf26 Feb 2026
Withdrawal Update Form 1File: form 1.pdf26 Feb 2026
Withdrawal Update Form 2File: Form2DaffodilHeightsDec2025.pdf26 Feb 2026
Withdrawal Update Form 2File: Form2DaffodilHeightsDec2025.pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf26 Feb 2026
Form 1File: Signed Form 1 Sept 2025.pdf16 Jan 2026
Form 2File: Form2DaffofilSept25.pdf16 Jan 2026
Form 3File: Form 3 Daffodil Heights Sept 25 Signed (1).pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Sept 25.pdf16 Jan 2026
Form 1File: FORM 1 Architect Certificate June2025.pdf10 Dec 2025
Form 2File: Form2 June25.pdf10 Dec 2025
Form 3File: Form 3 Daffodil Heights June 25.pdf10 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked June25.pdf10 Dec 2025
Form 5 (FY 2024-2025)File: Form 5_Daffodil heights_2024-25_scanned.pdf31 Oct 2025
Form 1File: FORM 1 Architect Certificate - Sep 24.pdf1 Oct 2025
Form 2File: Form 2 Sept24.pdf1 Oct 2025
Form 3File: Form 3 - CA.pdf1 Oct 2025
Disclosure of Sold and Booked InventoryFile: SoldUnsold InventoryDaffodil (1).pdf1 Oct 2025
Form 1File: FORM 1.pdf1 Oct 2025
Form 2File: FORM 2.pdf1 Oct 2025
Form 3File: Signed FORM 3_31-03-2025.pdf1 Oct 2025
Disclosure of Sold and Booked InventoryFile: Daffodil Sold Book .pdf1 Oct 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf19 Apr 2025
Certificates of CA (Form 3)File: final form 3.pdf4 Apr 2025
Certificates of CA (Form 3)File: Form 3 31st Dec 2024_compressed.pdf26 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Daffodil_compressed.pdf26 Mar 2025
Other - TechnicalFile: Updated Pert chart.pdf25 Mar 2025
Declaration in FORM BFile: form b final.pdf15 Mar 2025
Other - TechnicalFile: 6 (2).pdf15 Mar 2025
CERSAI detailsFile: Undertaking About CERSAI Certificate.pdf3 Mar 2025
Deviation Report with respect to Allotment letterFile: No Deviation from Model Allotment Letter.pdf3 Mar 2025
Other - TechnicalFile: Annexure A.pdf3 Mar 2025
Deviation Report with respect to model copy of AgreementFile: No Deviation from Agreement for Sale.pdf3 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (Vimal).pdf3 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (Vishal).pdf3 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Dec 24.pdf28 Jan 2025
Certificates of CA (Form 3)File: Form3DaffodilHeightsSept2024(Signed by Manish Sir)_.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: Final Sold - Booked Inventory Disclosure Sep 24.pdf8 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Architect Certificate - Sep 24.pdf7 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Daffodil Heights CC.pdf6 Jan 2025
Declaration about Commencement CertificateFile: Declaration about CC.pdf6 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf6 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf4 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sept24.pdf3 Jan 2025
Disclosure of sold/ booked inventoryFile: SoldUnsoldDaffodilHeightsSept24.pdf3 Jan 2025
Certificates of CA (Form 3)File: Form 3- Daffodil height_compressed.pdf25 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf7 Aug 2024
Layout approvalFile: Page14_compressed.pdf11 Jul 2024
Layout approvalFile: Page13_compressed.pdf11 Jul 2024
Layout approvalFile: Page12_compressed.pdf11 Jul 2024
Layout approvalFile: page11_compressed.pdf11 Jul 2024
Layout approvalFile: page10_compressed.pdf11 Jul 2024
Layout approvalFile: page9_compressed.pdf11 Jul 2024
Layout approvalFile: page8_compressed.pdf11 Jul 2024
Layout approvalFile: Page7_compressed.pdf11 Jul 2024
Layout approvalFile: Page6_compressed.pdf11 Jul 2024
Layout approvalFile: Page 5_compressed.pdf11 Jul 2024
Layout approvalFile: Page 3_compressed.pdf11 Jul 2024
Layout approvalFile: Page 2_compressed.pdf11 Jul 2024
Layout approvalFile: Page 1_compressed.pdf11 Jul 2024
Copy of Layout Approval (in case of layout)File: Page14_compressed.pdf11 Jul 2024
Copy of Layout Approval (in case of layout)File: Page13_compressed.pdf11 Jul 2024
Copy of Layout Approval (in case of layout)File: Page12_compressed.pdf11 Jul 2024
Copy of Layout Approval (in case of layout)File: page11_compressed.pdf11 Jul 2024
Copy of Layout Approval (in case of layout)File: page10_compressed.pdf11 Jul 2024
Copy of Layout Approval (in case of layout)File: page9_compressed.pdf11 Jul 2024
Copy of Layout Approval (in case of layout)File: page8_compressed.pdf11 Jul 2024
Copy of Layout Approval (in case of layout)File: Page7_compressed.pdf11 Jul 2024
Copy of Layout Approval (in case of layout)File: Page6_compressed.pdf11 Jul 2024
Copy of Layout Approval (in case of layout)File: Page 5_compressed.pdf11 Jul 2024
Copy of Layout Approval (in case of layout)File: Page 3_compressed.pdf11 Jul 2024
Copy of Layout Approval (in case of layout)File: Page 2_compressed.pdf11 Jul 2024
Copy of Layout Approval (in case of layout)File: Page 1_compressed.pdf11 Jul 2024
Proforma of Agreement for saleFile: DarftSaleAgreementDaffodilHeightsNew.pdf11 Jul 2024
Certificates of CA (Form 3)File: SelfDeclarationforForm3March24.pdf20 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE.pdf8 Apr 2024

How this compares with Mumbai City

40%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 84 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Daffodil Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mumbai CIty780+ in Mumbai City

2 kmDaffodil HeightsCompleted 24Lapsed / revoked 17Other 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 87 registered projects within 2 km.

Builder: Shree Krishna Constructions

Shree Krishna Constructions has 3 registrations on MahaRERA, including Krishna Heights and Krishna Pride. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Daffodil Heights is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Daffodil Heights?

The registered promoter entity is Shree Krishna Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Daffodil Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Daffodil Heights?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Daffodil Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Daffodil Heights?

The professionals named in the filing: Architect: MAYUREE CONSULTANTS; Engineer: Milind Arjun Wankhade; Engineer: Shravani Consultants; Chartered Accountant: Manish k Ramawati and Company; Chartered Accountant: JB PATEL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Daffodil Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Daffodil Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Daffodil Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.