Home / Browse projects / Palghar, Maharashtra / CRD GARDENIA BUNGALOWS

Registration lapsed No litigation declared Mixed project

CRD GARDENIA BUNGALOWS

By Dr Chandrashekhar Raghunath Dound

RG-MH-86725 · RERA P99000008857 · Last updated on MahaRERA portal: 19 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
9 of 253Construction stages doneacross 24 buildings; furthest along: Excavation, 0%
40 of 41Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

CRD GARDENIA BUNGALOWS is a Mixed project by Dr Chandrashekhar Raghunath Dound in Palghar, Maharashtra, registered with MahaRERA as P99000008857 on 19 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date. 1 of the 41 units on this registration are recorded sold or booked, and 9 of 253 construction stages are filed complete.

At a glance

Project

  • NameCRD GARDENIA BUNGALOWS
  • TypeMixed
  • Location
    • Velgaon
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000008857
  • ReraGenie IDRG-MH-86725

Builder

  • NameDr Chandrashekhar Raghunath Dound
  • Entity typeIndividual
  • Other registrations12 more →
  • Completed7 of 13
  • No longer live4 lapsed, de-registered or revoked

Key dates

34 months past promisethis monthRegisteredAug 2017PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings23 building records
  • Documents filed82 files

Current status

2%1 of 41 units booked

Figures as on 19 Apr 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TRENDY 01 - 02NA20000
TRENDY 03 - 04NA20000
TRENDY 05 - 06NA20000
TRENDY 07 - 08NA20000
TRENDY 09 - 10NA20000
TRENDY 11 - 12NA20000
TRENDY 13 - 14NA20000
TRENDY 15 - 16NA20000
TRENDY 17 - 18NA20000
TRENDY 19 - 20NA20000
TRENDY 21 - 22NA20000
TRENDY 23 - 24NA20000
TRENDY 25NA20000
TRENDY 26 - 27NA20000
TRENDY 28 - 29NA20000
TRENDY 30 - 31NA20000
TRENDY 32 - 33NA20000
TRENDY 34 - 35NA20000
TRENDY 36 - 37NA20000
ROYAL 41NA30000
ROYAL 42NA30000
ROYAL 43NA30000
ROYAL 44NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 19 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 24 buildings; the table lists the first 20.

9 of 253 construction stages are filed complete across 24 buildings. The stage furthest along is Excavation, at 0%.

TRENDY 01 - 020%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 03 - 040%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 05 - 060%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 07 - 080%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 09 - 100%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 11 - 120%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 13 - 140%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 15 - 160%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 17 - 180%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 19 - 200%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 21 - 220%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 23 - 240%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 250%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 26 - 270%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 28 - 290%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 30 - 310%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 32 - 330%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 34 - 350%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TRENDY 36 - 370%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROYAL 4182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes40%
Landscaping & Tree PlantingYes90%
Street LightingYes40%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed41

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots41
Open Space41
BuildingOpen SpaceTotal
TRENDY 01 - 0222
TRENDY 03 - 0422
TRENDY 05 - 0622
TRENDY 07 - 0822
TRENDY 09 - 1022
TRENDY 11 - 1222
TRENDY 13 - 1422
TRENDY 15 - 1622
TRENDY 17 - 1822
TRENDY 19 - 2022
TRENDY 21 - 2222
TRENDY 23 - 2422
TRENDY 2511
TRENDY 26 - 2722
TRENDY 28 - 2922
TRENDY 30 - 3122
TRENDY 32 - 3322
TRENDY 34 - 3522
TRENDY 36 - 3722
ROYAL 4111
ROYAL 4211
ROYAL 4311
ROYAL 4411

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,438 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI10756.8
Proposed, not sanctioned5,534 sq m
Buildings approved23
Buildings sanctioned23

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHRAM SADHANA TRUST BANDRA EAST MUMBAI 400051

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTrupti Jadhav
EngineerVidyadhar joshi
EngineerSamir Dilip Mehta
PartnerRole in project
Dr Chandrashekhar Raghunath Dound-

Litigation declared1

CaseCourtStatus
47/2014/2014Civil Judge Senior Division PalgharCase Pending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Jan 2025

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Bungalows_UPLOADED ON 19TH APRIL 2025.pdf19 Apr 2025
Certificates of CA (Form 3)File: Gardenia Bunglow form 3 - Q4_compressed_compressed (1).pdf19 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 bungalow Q4 FY 2024-25 UPLOADED ON 19TH APRIL 2025.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Crd Gardenia Bungalows SOLD UNSOLD AS ON 31MARCH25.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 bungalow Q3 FY 2024-25 UPLOADED 18 JAN 20245.pdf18 Jan 2025
Certificates of CA (Form 3)File: FORM 3 Bunglows Date 31DEC24 UPLOADED 18 JAN 2024.pdf18 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 bungalow Q3 FY 2024-25 Date 06JAN2025.pdf18 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 bungalow Q3 FY 2024-25_compressed (2).pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Crd Gardenia Bungalows SOLD UNSOLD.pdf16 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate - Bungalow 41.pdf11 Jan 2025
Certificates of CA (Form 3)File: FORM 3 BUNGALOW FY 2024-25 Q2 UPLOADED 7 DEC 24.pdf7 Dec 2024
Certificates of CA (Form 3)File: FORM 3 BUNGALOW FY 2024-25 Q1_UPLOADED 7 DEC 24.pdf7 Dec 2024
Certificates of CA (Form 3)File: FORM 3 BUNGALOW FY 2023-24_UPLOADED 7 DEC 24.pdf7 Dec 2024
Certificates of CA (Form 3)File: FORM 3 BUNGALOW FY 2022-23_UPLOADED 7 DEC 24.pdf7 Dec 2024
Certificates of CA (Form 3)File: FORM 3 BUNGALOW FY 2021-22_UPLOADED 7 DEC 24.pdf7 Dec 2024
Certificates of CA (Form 3)File: FORM 3 BUNGALOW FY 2019-20_UPLOADED 7 DEC 24.pdf7 Dec 2024
Certificates of CA (Form 3)File: FORM 3 BUNGALOW FY 2018-19_UPLOADED 7 DEC 24.pdf7 Dec 2024
Certificates of CA (Form 3)File: FORM 3 BUNGALOW FY 2017-18_UPLOADED 7 DEC 24.pdf7 Dec 2024
Certificates of CA (Form 3)File: FORM 3 BUNGALOW FY 2020-21_UPLOADED 7 DEC 24.pdf7 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Bungalow Form 2A FY 2019-20.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Bungalow Form 2A FY 2020-21.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DISCLOSURE BUNGLOW 30 SEPT 2024.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Bungalow Form 2A FY 2021-22.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Bungalow Form 2A FY 2022-23.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Bungalow Form 2A FY 2023-24.pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 FY 2017-18 BUNGALOW UPLOADED 30 NOV 24_.pdf30 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 FY 2018-19 BUNGALOW.pdf30 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 FY 2019-20 BUNGALOW.pdf30 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 FY 2020-21 BUNGALOW.pdf30 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 FY 2021-22 BUNGALOW_compressed (1).pdf30 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 FY 2022-23 BUNGALOW.pdf30 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 FY 2023-24 BUNGALOW.pdf30 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 FY 2024-25 Q1 BUNGALOW.pdf30 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 FY 2024-25 Q2 BUNGALOW.pdf30 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 -BUNGALOW FY 2023-24.pdf30 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 -BUNGALOW FY 2024-25 Q2.pdf30 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 -BUNGALOW FY 2024-25 Q1.pdf30 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 -BUNGALOW FY 2022-23.pdf30 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 -BUNGALOW FY 2021-22 UPLOADED 30 NOV 24.pdf30 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 -BUNGALOW FY 2020-21.pdf30 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 -BUNGALOW FY 2019-20.pdf30 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 -BUNGALOW FY 2018-19.pdf30 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 -BUNGALOW FY 2017-18.pdf30 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - BUNGLOW FY 2023-24.pdf12 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - BUNGLOW FY 2023-24.pdf12 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - BUNGLOWS FY 2022-23.pdf19 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 BUNGLOW FY 2020-21.pdf2 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22 Bunglow.pdf2 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CRDBunglow_Form5_1920.pdf29 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: BUNGALOW FY2018 19.pdf28 Dec 2019
Certificates of CA (Form 5)File: CRD Form 5 Bungalows.pdf2 Nov 2018
Proforma of Allotment letterFile: Agreement.pdf25 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Revised-Form-2_31-07-17-1-6.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Revised-Form-2_31-07-17-7-11.pdf31 Jul 2017
Building plan approval or NA orderFile: NA Order 2014-compressed.pdf30 Jul 2017
Building plan approval or NA orderFile: NA Order 2013-compressed.pdf30 Jul 2017
Layout approvalFile: Layout 2014.pdf30 Jul 2017
Layout approvalFile: Layout 2013.pdf30 Jul 2017
Layout approvalFile: 15-16.pdf30 Jul 2017
Layout approvalFile: 25.pdf30 Jul 2017
Layout approvalFile: 40 to 43.pdf30 Jul 2017
Layout approvalFile: 1 to 6-11 to 14.pdf30 Jul 2017
Layout approvalFile: 7 to 10-17 to 24-26 to 39.pdf30 Jul 2017
Layout approvalFile: 44.pdf30 Jul 2017
PAN CardFile: PAN.pdf30 Jul 2017
Copy of the legal title reportFile: Title Certificate 48-1A-1C.pdf30 Jul 2017
Details of encumbrancesFile: encumberance Bungalows.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: 1 to 6-11 to 14.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: 7 to 10-17 to 24-26 to 39.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: 15-16.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: 25.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: 40 to 43.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: 44.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout 2013.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout 2014.pdf30 Jul 2017
Building Plan Approval (IOD)File: NA Order 2013-compressed.pdf30 Jul 2017
Building Plan Approval (IOD)File: NA Order 2014-compressed.pdf30 Jul 2017
Declaration in FORM BFile: Form B.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Bugalows 1.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Bugalows 2.pdf30 Jul 2017

How this compares with Palghar

2%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CRD GARDENIA BUNGALOWS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Velgaon3,200+ in Palghar

2 kmCRD GARDENIA BUNGALOWSCompleted 7Lapsed / revoked 3Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: Dr Chandrashekhar Raghunath Dound

Dr Chandrashekhar Raghunath Dound has 13 registrations on MahaRERA, including CRD Gardenia Apartments 1 and CRD Gardenia Apartments 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that CRD GARDENIA BUNGALOWS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if CRD GARDENIA BUNGALOWS is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CRD GARDENIA BUNGALOWS?

The registered promoter entity is Dr Chandrashekhar Raghunath Dound, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CRD GARDENIA BUNGALOWS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CRD GARDENIA BUNGALOWS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CRD GARDENIA BUNGALOWS?

The professionals named in the filing: Architect: Trupti Jadhav; Engineer: Vidyadhar joshi; Engineer: Samir Dilip Mehta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CRD GARDENIA BUNGALOWS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CRD GARDENIA BUNGALOWS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CRD GARDENIA BUNGALOWS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.