Home / Browse projects / Palghar, Maharashtra / CRD Gardenia Apartments 4 - Phase II

Registered No litigation declared Residential / Group Housing project

CRD Gardenia Apartments 4 - Phase II

By Dr Chandrashekhar Raghunath Dound

RG-MH-73207 · RERA P99000019668 · Last updated on MahaRERA portal: 28 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 84 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 84 months from the original
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
52 of 52Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 115 documents Report an error

CRD Gardenia Apartments 4 - Phase II is a Residential / Group Housing project by Dr Chandrashekhar Raghunath Dound in Palghar, Maharashtra, registered with MahaRERA as P99000019668 on 20 Feb 2019. Possession is promised by 31 Dec 2030. The completion date has moved by 84 months from the original filing. 0 of the 52 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete.

At a glance

Project

  • NameCRD Gardenia Apartments 4 - Phase II
  • TypeResidential / Group Housing
  • Location
    • Manor Velgaon Road
    • Velgaon
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000019668
  • ReraGenie IDRG-MH-73207

Builder

  • NameDr Chandrashekhar Raghunath Dound
  • Entity typeIndividual
  • Other registrations12 more →
  • Completed7 of 13
  • No longer live4 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2019First promiseDec 2023Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Feb 2019
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 30 Dec 2023)
  • Buildings3 building records
  • Documents filed115 files

Current status

0%0 of 52 units booked
10.5%Work done, per cost certificate

Figures as on 28 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA00000
Wing BNA8847047
PodiumNA11055

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 28 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

Wing A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Podium0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes80%
Street LightingYes80%
Community BuildingsYes95%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes80%
Open ParkingNoNot applicable

Parking filed37

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots37
Open Space37

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,868 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Apr 2026

Approvals and building plan

Sanctioning authorityCollector, Palghar
Permissible FSI3474.97
Proposed, not sanctioned3,475 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch99 ABDE VILLA S V ROAD KHAR WEST MUMBAI 400052
Estimated costRs 9.63 cr
Cost incurredRs 1.01 cr
Work done10.53%
BuildingWingEstimatedIncurred
Wing ANARs 7.44 cr-
-NARs 1.13 crRs 1.01 cr
PodiumNARs 1.06 cr-

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTRUPTI JADHAV Jadhav
ArchitectTrupti Tukaram Jadhav
EngineerAPARNA DABAK
EngineerV.J. Joshi & Associates
EngineerSUHAS JADHAV
EngineerSamir Dilip Mehta
Chartered AccountantR.C. JAIN & ASSOCIATES LLP
Chartered AccountantAbhishek Lilani
Chartered AccountantVINOD KUMAR JAIN
PartnerRole in project
Dr Chandrashekhar Raghunath Dound-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000013656Dec 2023 → Dec 2024

Reason as filed by the promoterTotal four buildings are proposed on a single parcel of land bearing Gat no. 48/1A/1B, Velgaon, Palghar. Out of these four buildings, three buildings namely CRD Gardenia Apt 1, 2 and 6 are completed and have received OC. Now as per the unified DCPR , the plans are revised and approved on 10/11/2022. As per the new approval, Plans of Apt no. 4 are completely changed. The construction of this Apt 4 is not started yet and there are no sales in the building. Now wing B of Building No 4 and podium which is building no 3 is proposed to be part of this registered project “CRD Gardenia Apartments 4 -

EA19052621016Dec 2023 → Dec 2030

Reason as filed by the promoterThe current facts of the case are being explained hereunder. The reason for the delay is pace of sales being lower than expected and thereby affecting the cash flows of the project. It is evident from Table C of Form 3 and sold booked inventory as on 31/03/2025 that there are no units sold in the project. Lower than expected cash flows has in turn affected the pace of construction of the project thereby making it impossible to meet the scheduled due date 31/12/2026. Due to no sale in the project, the applicant landed into the financial difficulties which spiraled the event of stoppage of const

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Feb 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed115

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 APT 4 PHASE II FY 2026-27 Q1.pdf28 Jul 2026
Withdrawal Update Form 2File: FORM 2 APT 4 PHASE II FY 2026-27 Q1.pdf28 Jul 2026
Withdrawal Update Form 3File: Form 3 Apartment 4 Phase II 18-07-26.pdf28 Jul 2026
Form 2A (FY 2025-2026)File: Apt 4 Phase II Form 2A (3) March 2026 signed Final.pdf30 Jun 2026
Form 2A (FY 2024-2025)File: FORM - 2A APT 4 Phase II March 2025.pdf21 May 2026
Form 5 (FY 2019-2020)File: Form 5 Apartment 4 Phase II Scanned FY 2019-20.pdf21 May 2026
Form 5 (FY 2020-2021)File: Form 5 20-21.pdf21 May 2026
Form 5 (FY 2021-2022)File: Form 5 FY 2021-22 Apt 4 -Phase II.pdf21 May 2026
Form 5 (FY 2022-2023)File: FORM 5 - APT 4 PHASE II FY 2022-23.pdf21 May 2026
Form 5 (FY 2023-2024)File: FORM 5 - APT 4 PHASE II FY 2023-24.pdf21 May 2026
Form 5 (FY 2024-2025)File: Form 5 Apt 4 Phase II.pdf21 May 2026
Form 2A (FY 2018-2019)File: FORM - 2A APT 4 Phase II March 2020.pdf19 May 2026
Form 2A (FY 2019-2020)File: FORM - 2A APT 4 Phase II March 2020.pdf19 May 2026
Form 2A (FY 2020-2021)File: FORM -2A APT 4 Phase II March 2021.pdf19 May 2026
Form 2A (FY 2021-2022)File: FORM - 2A APT 4 Phase II March 2022.pdf19 May 2026
Form 2A (FY 2022-2023)File: FORM - 2A APT 4 Phase II March 2023.pdf19 May 2026
Form 2A (FY 2023-2024)File: FORM - 2A APT 4 Phase II March 2024.pdf19 May 2026
Withdrawal Update Form 1File: Form 1 crd gardinia Apt 4 phase ll - Q4.pdf21 Apr 2026
Withdrawal Update Form 1File: Form 1 Apt 4 - Phase II -Q1 - June 2025.pdf21 Apr 2026
Withdrawal Update Form 1File: FORM 1 -Apt 4 phase II Q2 Sep 2025.pdf21 Apr 2026
Withdrawal Update Form 1File: Form 1 crd gardinia Apt 4 phase ll Q3 Dec 2025.pdf21 Apr 2026
Withdrawal Update Form 1File: Form 1 crd gardinia Apt 4 phase ll - Q4.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 - Apt 4 Phase II Jan 26 to March Q4.pdf21 Apr 2026
Withdrawal Update Form 2File: form 2 - Apt 4 phase II - Q1 June 2025.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 - Apt 4 phase II Q2 Sep 2025.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 crd gardinia apt 4 phase ll Q2 Dec 2025.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 - Apt 4 Phase II Jan 26 to March Q4.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3 Apt 4 Phase II Q4 MARCH 2026.pdf21 Apr 2026
Withdrawal Update Form 3File: form 3 Apt 4 phase II - Q1 June 2025_compressed r.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3 Apt 4 phase II Q2 sEP 2025.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3 Apt 4 phase II Q3 Dec 2025.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3 Apt 4 Phase II Q4 MARCH 2026 - ok_compressed (1).pdf21 Apr 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 APT 4 PHASE II Q4 FY 2024-25.pdf19 Apr 2025
Certificates of CA (Form 3)File: FORM 3 APT 4 PHASE II Q4 FY 2024-25_compressed.pdf19 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 APT 4 PHASE II Q4 FY 2024-25.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: APT 4 PHASE II SOLD UNSOLD AS ON 31 MARCH 2025.pdf19 Apr 2025
Certificates of CA (Form 3)File: FORM 3 Date 30june24 APT 4 PHASEII uploaded.pdf18 Jan 2025
Certificates of CA (Form 3)File: FORM 3 Date 31dec24 APT 4 PHASEII uploaded.pdf18 Jan 2025
Certificates of CA (Form 3)File: FORM 3 Date 30sept 24 APT 4 PHASEII uploaded.pdf18 Jan 2025
Certificates of CA (Form 3)File: FORM 3 Date 31march24 APT 4 PHASEII uploaded.pdf18 Jan 2025
Certificates of CA (Form 3)File: FORM 3 Date 31dec 23 APT 4 PHASEII uploaded.pdf18 Jan 2025
Certificates of CA (Form 3)File: FORM 3 Date 30sept23 APT 4 PHASEII uploaded.pdf18 Jan 2025
Certificates of CA (Form 3)File: FORM 3 Date 30june23 APT 4 PHASEII uploaded.pdf18 Jan 2025
Certificates of CA (Form 3)File: FORM 3 Date 31march 23 APT 4 PHASEII uploaded.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: APT 4 PHASE II SOLD UNSOLD AS ON 31 DEC 2024.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Apartments 4 SOLD UNSOLD.pdf15 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 APT 4 PHASE II Q1 FY 2023-24.pdf13 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 APT 4 PHASE II Q2 FY 2023-24.pdf13 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 APT 4 PHASE II Q3 FY 2023-24.pdf13 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 APT 4 PHASE II Q4 FY 2023-24.pdf13 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 APT 4 PHASE II Q1 FY 2024-25.pdf13 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 APT 4 PHASE II Q2 FY 2024-25.pdf13 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 APT 4 PHASE II Q3 FY 2024-25.pdf13 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 APT 4 PHASE II Q4 FY 2022-23 UPLOADED 13 JAN 2025.pdf13 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 APT 4 PHASE II Q4 FY 2022-23.pdf13 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 APT 4 PHASE II Q1 FY 2023-24.pdf13 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 APT 4 PHASE II Q2 FY 2023-24.pdf13 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 APT 4 PHASE II Q3 FY 2023-24.pdf13 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 APT 4 PHASE II Q4 FY 2023-24.pdf13 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 APT 4 PHASE II Q1 FY 2024-25.pdf13 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 APT 4 PHASE II Q2 FY 2024-25.pdf13 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 APT 4 PHASE II Q3 FY 2024-25.pdf13 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - APT 4 PHASE II FY 2023-24.pdf12 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - APT 4 PHASE II FY 2023-24.pdf12 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - APT 4 PHASE II FY 2022-23.pdf19 Dec 2023
Layout approvalFile: Layout Apt 4 II_31-1-23_compressed.pdf9 Feb 2023
Copy of Layout Approval (in case of layout)File: Layout Apt 4 II_31-1-23_compressed.pdf9 Feb 2023
Layout approvalFile: Layout Apt 4 _compressed.pdf2 Feb 2023
Building plan approvalFile: Apt 4 PII_31-01-23_compressed.pdf2 Feb 2023
Building plan approvalFile: Apt 4B PII_31-01-23.pdf2 Feb 2023
Copy of Layout Approval (in case of layout)File: Layout Apt 4 _compressed.pdf2 Feb 2023
Building Plan Approval (IOD)File: Apt 4 PII_31-01-23_compressed.pdf2 Feb 2023
Building Plan Approval (IOD)File: Apt 4B PII_31-01-23.pdf2 Feb 2023
Declaration about Commencement CertificateFile: Declaration about CC_Apt 4-PII.pdf2 Feb 2023
Disclosure of sold/ booked inventoryFile: RERA Apt4 phase II.pdf2 Feb 2023
Disclosure of sold/ booked inventoryFile: rera4 phase II.pdf2 Feb 2023
Layout approvalFile: Layout_compressed.pdf29 Dec 2022
Building plan approvalFile: 4.pdf29 Dec 2022
Building plan approvalFile: 4B.pdf29 Dec 2022
Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf29 Dec 2022

How this compares with Palghar

0%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 84 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CRD Gardenia Apartments 4 - Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Velgaon3,200+ in Palghar

2 kmCRD Gardenia Apartments Completed 7Lapsed / revoked 4Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: Dr Chandrashekhar Raghunath Dound

Dr Chandrashekhar Raghunath Dound has 13 registrations on MahaRERA, including CRD Gardenia Apartments 1 and CRD Gardenia Apartments 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if CRD Gardenia Apartments 4 - Phase II is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CRD Gardenia Apartments 4 - Phase II?

The registered promoter entity is Dr Chandrashekhar Raghunath Dound, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CRD Gardenia Apartments 4 - Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CRD Gardenia Apartments 4 - Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CRD Gardenia Apartments 4 - Phase II?

The professionals named in the filing: Architect: TRUPTI JADHAV Jadhav; Architect: Trupti Tukaram Jadhav; Engineer: APARNA DABAK; Engineer: V.J. Joshi & Associates; Engineer: SUHAS JADHAV; Engineer: Samir Dilip Mehta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CRD Gardenia Apartments 4 - Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CRD Gardenia Apartments 4 - Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CRD Gardenia Apartments 4 - Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.