Home / Browse projects / Thane, Maharashtra / COSMOS ENCLAVE BLDG-JASMINE

Registered Litigation declared Others project

COSMOS ENCLAVE BLDG-JASMINE

By MONARCH DEVELOPERS

RG-MH-05790 · RERA P51700052301 · Last updated on MahaRERA portal: 16 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 90%
90 of 164Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

COSMOS ENCLAVE BLDG-JASMINE is a Others project by MONARCH DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700052301 on 9 Aug 2023. Possession is promised by 31 Dec 2026. 74 of the 164 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameCOSMOS ENCLAVE BLDG-JASMINE
  • TypeOthers
  • Location
    • RAM MANDIR ROAD
    • KASARVADAVLI
    • THANE WEST
    • Thane (M Corp.)
    • Thane
    • 400615
  • Pincode400615
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700052301
  • ReraGenie IDRG-MH-05790

Builder

  • NameMONARCH DEVELOPERS
  • Entity typeOthers
  • PartnersMAINSH DEVKINANADAN KHANDELWAL, ANKISH PRADEEP VARDAWAT, PRADEEP KEWALCHAND VARDAWAT, COSMOS SKYLINE HOMES PVT LTD Pvt Ltd
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Current status

45%74 of 164 units booked
84.4%Work done, per cost certificate

Figures as on 16 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JASMINENA212015410164

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

JASMINE: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 16 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed282

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots282
Closed/Covered1
Open Space281

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,018 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Jun 2025
LandownerVillageDistrict
Sanjay Shantilal ShahThane (M Corp.)Thane
Valkya Joma ShingeThane (M Corp.)Thane
Mahesh Bhaskar JoshiThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI10453.7
Proposed, not sanctioned10,454 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOpp Gavdevi Mandir,Gokhlae Road, 4, Krishnakala Bldg, Naupada thane west-400602
Estimated costRs 52.03 cr
Cost incurredRs 43.92 cr
Work done84.41%
BuildingWingEstimatedIncurred
-NARs 26.06 crRs 18.74 cr
JASMINENARs 25.97 crRs 25.18 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSuvarna Ghosh
EngineerR C Tipnis
Chartered AccountantNehal Mitul Faria
Chartered AccountantAshwin B Shah & Co.
PartnerRole in project
MONARCH DEVELOPERS-

Litigation declared1

CaseCourtStatus
46/2020Additional Collector ThaneClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 31-03-26.pdf16 May 2026
Withdrawal Update Form 2File: Form 2 31-03-26.pdf16 May 2026
Withdrawal Update Form 3File: Form 3 31-03-26.pdf16 May 2026
Withdrawal Update Form 1File: Form 1 31-12-2025.pdf4 Feb 2026
Withdrawal Update Form 2File: Form 2 31-12-25.pdf4 Feb 2026
Withdrawal Update Form 3File: Form 3 31-12-2025.pdf4 Feb 2026
Form 5 (FY 2023-2024)File: Form 5 FY 23-24.pdf11 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 FY 24-25.pdf11 Dec 2025
Withdrawal Update Form 1File: Form 1 S 25.pdf12 Nov 2025
Withdrawal Update Form 2File: Form 2 S 25.pdf12 Nov 2025
Withdrawal Update Form 3File: Form 3 S 25.pdf12 Nov 2025
Form 1File: Form 1 -30-06-2025.pdf30 Jul 2025
Form 2File: Form 2 -30-06-2025.pdf30 Jul 2025
Form 3File: Form 3 -30-06-2025.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 30-06-2025.pdf30 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-03-2025.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-03-2025.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-03-2025.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Jasmine Sold Unsold.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 31-12-2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-12-2024.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf6 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 March 2024.pdf6 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-06-2024.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jasmine.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I Architect Certificate Jasmine Bldg_0001.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I Architect Certificate Jasmine Bldg_0001.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jasmine.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-06-2024.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final.pdf24 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -mar 24.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf22 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SEP- 2023- FORM 1 - 1ST.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM- 1 - DEC- 23- 2ND.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 MARCH - 24 - 3RD.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: SEP- 2023- 1ST- SOLD UNSOLD-.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: DEC- 2023 - 3RD - SOLD UNSOLD.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: MARC- 24- 3RD - SOLD UNSOLD.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jasmine Form 1_0001.pdf7 Mar 2024
Layout approvalFile: Amended Plan.pdf4 Mar 2024
Building plan approvalFile: Amended Plan.pdf4 Mar 2024
Copy of Layout Approval (in case of layout)File: Amended Plan.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan.pdf4 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Amended CC.pdf4 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold List_0001.pdf4 Mar 2024
CERSAI detailsFile: Cersai -comos.pdf3 Jul 2023
Copy of the legal title reportFile: Agreement sale Mr Mahesh.pdf24 Jun 2023
CERSAI detailsFile: Cersai Declaration revised.pdf24 Jun 2023
Other - LegalFile: Agreement sale Mr Mahesh.pdf24 Jun 2023
Details of encumbrances concerned to FinanceFile: DECLARATION OF NO ENCUMBERANCE-finance.pdf21 Jun 2023
Details of encumbrances concerned to LegalFile: DECLARATION OF NO ENCUMBERANCE-finance.pdf21 Jun 2023
Other - LegalFile: Supplementary agreement.pdf5 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed (1).pdf26 May 2023
Building plan approvalFile: MYSCAN_20230522_0006.pdf22 May 2023
Building plan approvalFile: MYSCAN_20230522_0005.pdf22 May 2023
Layout approvalFile: MYSCAN_20230522_0003 (1).pdf22 May 2023
PAN CardFile: IMG-20230511-WA0039.pdf22 May 2023
Copy of Layout Approval (in case of layout)File: MYSCAN_20230522_0003 (1).pdf22 May 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230522_0005.pdf22 May 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230522_0006.pdf22 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf22 May 2023
Copy of the legal title reportFile: New Title_0001_compressed.pdf19 May 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory_compressed.pdf19 May 2023
Building plan approvalFile: MYSCAN_20230522_0004.pdf18 May 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230522_0004.pdf18 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MR ANKISH P VARDAWAT.pdf18 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MR MANISH D KHANDELWAL.pdf18 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MR PRADEEP KVARDAWAT.pdf18 May 2023
Proforma of Agreement for saleFile: Agreement for Sale.pdf18 May 2023
Proforma of Allotment letterFile: Allotment Letter.pdf18 May 2023
Deviation Report with respect to Allotment letterFile: No Deviation Report for Allotment Letter.pdf16 May 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation Report for Agreement For Sale.pdf16 May 2023
Declaration in FORM BFile: Affidavit cum Declaration-Form B_compressed.pdf11 May 2023
Details of encumbrances concerned to FinanceFile: DECLARATION OF NO ENCUMBERANCE.pdf4 May 2023
Details of encumbrances concerned to LegalFile: DECLARATION OF NO ENCUMBERANCE.pdf4 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Jasmine.pdf4 May 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
COSMOS ORCHID- Blossom,Florica,Iris, Lily 1A, Lily 1BKASARVADAVALI G B ROAD THANE176CompletedDec 2016Late, Jan 2017

How this compares with Thane

45%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep COSMOS ENCLAVE BLDG-JASMINE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KASARVADAVLI, THANE WEST7,600+ in Thane

Builder: MONARCH DEVELOPERS

MONARCH DEVELOPERS has 6 registrations on MahaRERA, including COSMOS ORCHID and COSMOS ENCLAVE - CHESTNUT. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if COSMOS ENCLAVE BLDG-JASMINE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of COSMOS ENCLAVE BLDG-JASMINE?

The registered promoter entity is MONARCH DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in COSMOS ENCLAVE BLDG-JASMINE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for COSMOS ENCLAVE BLDG-JASMINE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at COSMOS ENCLAVE BLDG-JASMINE?

The professionals named in the filing: Architect: Suvarna Ghosh; Engineer: R C Tipnis; Chartered Accountant: Nehal Mitul Faria; Chartered Accountant: Ashwin B Shah & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in COSMOS ENCLAVE BLDG-JASMINE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About COSMOS ENCLAVE BLDG-JASMINE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save COSMOS ENCLAVE BLDG-JASMINE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.