Home / Browse projects / Mumbai Suburban, Maharashtra / Construction of LIG and MIG Tenement at Virar Bolinj
Construction of LIG and MIG Tenement at Virar Bolinj
By KONKAN HOUSING AND AREA DEVELOPMENT BOARD
RG-MH-08502 · RERA P51800002836 · Last updated on MahaRERA portal: 14 Aug 2019
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Construction of LIG and MIG Tenement at Virar Bolinj is a Residential / Group Housing project by KONKAN HOUSING AND AREA DEVELOPMENT BOARD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800002836 on 4 Aug 2017. The registration is recorded completed; possession was promised by 29 Mar 2018.
At a glance
Project
- NameConstruction of LIG and MIG Tenement at Virar Bolinj
- TypeResidential / Group Housing
- Location
- MIG Road
- Kalanagar
- Bandra East
- Andheri
- Mumbai Suburban
- 400051
- Pincode400051
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800002836
- ReraGenie IDRG-MH-08502
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Aug 2017
- Promised completion29 Mar 2018
- Revised completionNone
- Buildings72 building records
- Documents filed26 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 1 | NA | 23 | 0 | 0 | 0 | 0 |
| BUILDING NO 2 | NA | 24 | 0 | 0 | 0 | 0 |
| BUILDING NO 3A | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 3B | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 3C | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 3F | NA | 24 | 0 | 0 | 0 | 0 |
| BUILDING NO 3G | NA | 24 | 0 | 0 | 0 | 0 |
| BUILDING NO 3H | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 3J | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 3K | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 3E | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 3D | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 4J | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 4F | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 6L | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 6H | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 6B | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 6C | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 7B | NA | 23 | 0 | 0 | 0 | 0 |
| BUILDING NO 7C | NA | 23 | 0 | 0 | 0 | 0 |
| BUILDING NO 7G | NA | 23 | 0 | 0 | 0 | 0 |
| BUILDING NO 7H | NA | 23 | 0 | 0 | 0 | 0 |
| BUILDING NO 8A | NA | 23 | 0 | 0 | 0 | 0 |
| BUILDING NO 8B | NA | 23 | 0 | 0 | 0 | 0 |
| BUILDING NO 8C | NA | 23 | 0 | 0 | 0 | 0 |
| BUILDING NO 9C | NA | 23 | 0 | 0 | 0 | 0 |
| BUILDING NO 9D | NA | 23 | 0 | 0 | 0 | 0 |
| BUILDING NO 9A | NA | 23 | 0 | 0 | 0 | 0 |
| BUILDING NO 9B | NA | 23 | 0 | 0 | 0 | 0 |
| BUILDING NO 4A | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 4B | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 4C | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 4D | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 4E | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 4G | NA | 24 | 0 | 0 | 0 | 0 |
| BUILDING NO 4H | NA | 24 | 0 | 0 | 0 | 0 |
| BUILDING NO 5A | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 5B | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 6A | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 6D | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 6E | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 6F | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 6G | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 6J | NA | 24 | 0 | 0 | 0 | 0 |
| BUILDING NO 6K | NA | 24 | 0 | 0 | 0 | 0 |
| BUILDING NO 7A | NA | 23 | 0 | 0 | 0 | 0 |
| BUILDING NO 7D | NA | 23 | 0 | 0 | 0 | 0 |
| BUILDING NO 7E | NA | 23 | 0 | 0 | 0 | 0 |
| BUILDING NO 7F | NA | 23 | 0 | 0 | 0 | 0 |
| BUILDING NO 7J | NA | 23 | 0 | 0 | 0 | 0 |
| BUILDING NO 10A | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 11B | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 11C | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 11D | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 11E | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 11F | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 11G | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 12A | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 12B | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 12C | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 12D | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 12E | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 12F | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 12G | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 13A | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 13B | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 13C | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 11A | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 11H | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 11J | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 12H | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING NO 14A | NA | 25 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 14 Aug 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 72 buildings; the table lists the first 20.
792 of 792 construction stages are filed complete across 72 buildings.
BUILDING NO 1100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 2100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 3A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 3B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 3C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 3F100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 3G100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 3H100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 3J100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 3K100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 3E100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 3D100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 4J100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 4F100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 6L100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 6H100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 6B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 6C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 7B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 7C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 14 Aug 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed3434
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| BUILDING NO 1 | 13 | 50 | 63 |
| BUILDING NO 2 | 4 | 18 | 22 |
| BUILDING NO 3A | 1 | 18 | 19 |
| BUILDING NO 3B | 1 | 18 | 19 |
| BUILDING NO 3C | 1 | 18 | 19 |
| BUILDING NO 3F | 8 | 18 | 26 |
| BUILDING NO 3G | 8 | 18 | 26 |
| BUILDING NO 3H | 1 | 18 | 19 |
| BUILDING NO 3J | 1 | 18 | 19 |
| BUILDING NO 3K | 1 | 18 | 19 |
| BUILDING NO 3E | 1 | 18 | 19 |
| BUILDING NO 3D | 1 | 18 | 19 |
| BUILDING NO 4J | 1 | 18 | 19 |
| BUILDING NO 4F | 1 | 18 | 19 |
| BUILDING NO 6L | 1 | 18 | 19 |
| BUILDING NO 6H | 1 | 18 | 19 |
| BUILDING NO 6B | 1 | 18 | 19 |
| BUILDING NO 6C | 1 | 18 | 19 |
| BUILDING NO 7B | 1 | 39 | 40 |
| BUILDING NO 7C | 9 | 39 | 48 |
| BUILDING NO 7G | 6 | 39 | 45 |
| BUILDING NO 7H | 6 | 39 | 45 |
| BUILDING NO 8A | 6 | 46 | 52 |
| BUILDING NO 8B | 12 | 46 | 58 |
| BUILDING NO 8C | 12 | 46 | 58 |
| BUILDING NO 9C | 1 | 41 | 42 |
| BUILDING NO 9D | 12 | 41 | 53 |
| BUILDING NO 9A | 12 | 41 | 53 |
| BUILDING NO 9B | 1 | 41 | 42 |
| BUILDING NO 4A | 1 | 18 | 19 |
| BUILDING NO 4B | 1 | 18 | 19 |
| BUILDING NO 4C | 1 | 18 | 19 |
| BUILDING NO 4D | 8 | 18 | 26 |
| BUILDING NO 4E | 1 | 18 | 19 |
| BUILDING NO 4G | 8 | 18 | 26 |
| BUILDING NO 4H | 8 | 18 | 26 |
| BUILDING NO 5A | 1 | 18 | 19 |
| BUILDING NO 5B | 1 | 18 | 19 |
| BUILDING NO 6A | 1 | 18 | 19 |
| BUILDING NO 6D | 1 | 18 | 19 |
| BUILDING NO 6E | 1 | 18 | 19 |
| BUILDING NO 6F | 1 | 18 | 19 |
| BUILDING NO 6G | 1 | 18 | 19 |
| BUILDING NO 6J | 8 | 18 | 26 |
| BUILDING NO 6K | 8 | 18 | 26 |
| BUILDING NO 7A | 1 | 39 | 40 |
| BUILDING NO 7D | 1 | 39 | 40 |
| BUILDING NO 7E | 1 | 39 | 40 |
| BUILDING NO 7F | 1 | 39 | 40 |
| BUILDING NO 7J | 1 | 39 | 40 |
| BUILDING NO 10A | 1 | 92 | 93 |
| BUILDING NO 11B | 1 | 92 | 93 |
| BUILDING NO 11C | 1 | 92 | 93 |
| BUILDING NO 11D | 1 | 92 | 93 |
| BUILDING NO 11E | 1 | 92 | 93 |
| BUILDING NO 11F | 1 | 92 | 93 |
| BUILDING NO 11G | 1 | 92 | 93 |
| BUILDING NO 12A | 1 | 92 | 93 |
| BUILDING NO 12B | 1 | 92 | 93 |
| BUILDING NO 12C | 1 | 92 | 93 |
| BUILDING NO 12D | 1 | 92 | 93 |
| BUILDING NO 12E | 1 | 92 | 93 |
| BUILDING NO 12F | 1 | 92 | 93 |
| BUILDING NO 12G | 1 | 92 | 93 |
| BUILDING NO 13A | 1 | 92 | 93 |
| BUILDING NO 13B | 1 | 92 | 93 |
| BUILDING NO 13C | 1 | 92 | 93 |
| BUILDING NO 11A | 1 | 92 | 93 |
| BUILDING NO 11H | 1 | 92 | 93 |
| BUILDING NO 11J | 1 | 92 | 93 |
| BUILDING NO 12H | 1 | 47 | 48 |
| BUILDING NO 14A | 1 | 47 | 48 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NITIN PATIL |
| Engineer | Y P KAJALE |
| Partner | Role in project |
|---|---|
| KONKAN HOUSING AND AREA DEVELOPMENT BOARD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jun 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jun 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed26
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5)File: Form-5.PDF | 14 Aug 2019 |
| OtherFile: OC 22 Bldgs (Virar) - New.pdf | 22 Jan 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC1.pdf | 27 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC2.pdf | 27 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC3.pdf | 27 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 27 Mar 2018 |
| Certificates of Architect (Form 4)File: Form 4.pdf | 27 Mar 2018 |
| OtherFile: EE's Letter.pdf | 27 Mar 2018 |
| OtherFile: Final OC.pdf | 27 Mar 2018 |
| OtherFile: OC Application.pdf | 27 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Virar.pdf | 26 Jul 2017 |
| Certificates of CA (Form 3)File: C A Certificate - Virar.pdf | 26 Jul 2017 |
| Proforma of Allotment letterFile: allotment letter draft.PDF | 26 Jul 2017 |
| Layout approvalFile: Virar Layout.pdf | 3 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Virar Layout.pdf | 3 Jul 2017 |
| Building plan approvalFile: Development Permsission - 24-03-2015.pdf | 29 Jun 2017 |
| Building plan approvalFile: Revised Devel Permission - 01-03-2016.pdf | 29 Jun 2017 |
| Building plan approvalFile: Revised Devel Permission - 13-04-2017.pdf | 29 Jun 2017 |
| Copy of the legal title reportFile: Posession Receipt Virar.pdf | 29 Jun 2017 |
| Details of encumbrancesFile: Non Encumbrance Cetificate.pdf | 29 Jun 2017 |
| Building Plan Approval (IOD)File: Development Permsission - 24-03-2015.pdf | 29 Jun 2017 |
| Building Plan Approval (IOD)File: Revised Devel Permission - 01-03-2016.pdf | 29 Jun 2017 |
| Building Plan Approval (IOD)File: Revised Devel Permission - 13-04-2017.pdf | 29 Jun 2017 |
| Declaration in FORM BFile: Form - B.pdf | 29 Jun 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1.pdf | 29 Jun 2017 |
| Certificates of Architect (Form 4)File: Form - 4.pdf | 29 Jun 2017 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| SURVEY NO 162 VILLAGE KHONI TAL KALYANp51700016831 | 162, BADALAPUR MIDC PIPELINE ROAD, AT POST KHONI, Khoni, Kalyan, Thane, 421301, MAHARASHTRA | - | - | Ongoing | Jan 2028 | Not due yet |
| Residential Buildings of LIG MIG HIG at Balkum Thane under lum sum TurnkeyP51700003172 | Balkum Dhokali Thane, Thane | 2 | Aug 2017 | Certificate Signed | Feb 2024Registered original: Aug 2019 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 26 filed documents as one ZIP, foldered, with a manifest
Keep Construction of LIG and MIG Tenement at Vira on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kalanagar, Bandra East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 113 registered projects within 2 km.
12 PEGASUS
Jayant Enterprises S N Project
Kalpataru Magnus
Kalpataru Properties Pvt. Ltd.
Plotted Development Scheme at Sindhudurhnagari
MAHARASHTRA HOUSING AND AREA DEVELOPMENT A
SAJAY AVENUE 18
Vinca Realtors Private Limited
Sahakar excel Acropolis - I
EXCEL ENTERPRISES REALTY LLP
ADDRESS 51
V LAXMI EKTA DEVELOPERS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: KONKAN HOUSING AND AREA DEVELOPMENT BOARD
KONKAN HOUSING AND AREA DEVELOPMENT BOARD has 2 registrations on MahaRERA, including Construction of LIG and MIG Tenement at Virar Bolinj and Residential Buildings of LIG MIG HIG at Balkum Thane under lum sum Turnkey. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Construction of LIG and MIG Tenement at Virar Bolinj is delayed beyond 29 Mar 2018?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Construction of LIG and MIG Tenement at Virar Bolinj?
The registered promoter entity is KONKAN HOUSING AND AREA DEVELOPMENT BOARD, a public authority as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Construction of LIG and MIG Tenement at Virar Bolinj?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Construction of LIG and MIG Tenement at Virar Bolinj?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Construction of LIG and MIG Tenement at Virar Bolinj?
The professionals named in the filing: Architect: NITIN PATIL; Engineer: Y P KAJALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Construction of LIG and MIG Tenement at Virar Bolinj?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback