Home / Browse projects / Hingoli, Maharashtra / R M Dhariwal Garden City - Balsond Hingoli Plotting Phase - 1

Registered No litigation declared Plotted project

R M Dhariwal Garden City - Balsond Hingoli Plotting Phase - 1

By Dhariwal And Chhoriya Developers LLP

RG-MH-72550 · RERA P51200026958 · Last updated on MahaRERA portal: 11 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Hingoli registration emailed to you, free during the pilot beta.
Jun 2030Possession promisedno revision filed
65 of 101Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

R M Dhariwal Garden City - Balsond Hingoli Plotting Phase - 1 is a Plotted project by Dhariwal And Chhoriya Developers LLP in Hingoli, Maharashtra, registered with MahaRERA as P51200026958 on 7 Nov 2020. Possession is promised by 30 Jun 2030. 36 of the 101 units on this registration are recorded sold or booked.

At a glance

Project

  • NameR M Dhariwal Garden City - Balsond Hingoli Plotting Phase - 1
  • TypePlotted
  • Location
    • Akola To Nanded Road
    • Balsond
    • Hingoli
    • Balsond
    • Hingoli
    • 451513
  • Pincode451513
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51200026958
  • ReraGenie IDRG-MH-72550

Builder

  • NameDhariwal And Chhoriya Developers LLP
  • Entity typePartnership
  • GSTIN27AAIFD2049JIZD
  • PartnerAnmol Kanhaiyalal Chhoriya
  • Other registrations10 more →
  • Completed2 of 11
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2020PromisedJun 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Nov 2020
  • Promised completion30 Jun 2030
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed95 files

Current status

36%36 of 101 units booked
25.4%Work done, per cost certificate

Figures as on 11 Jul 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities16

As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Ent GateYes100%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area18,230 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jun 2026

Approvals and building plan

Sanctioning authorityCorporation
Permissible FSI11963.13
Proposed, not sanctioned11,963 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSI Branch, Pune
Estimated costRs 1.19 cr
Cost incurredRs 30.21 lakh
Work done25.41%
BuildingWingEstimatedIncurred
-NARs 1.19 crRs 30.21 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Kunal P Patil Patil
EngineerIMPower Projects - Mr Manish Pande
EngineerAvinash Wadgaonkar
Chartered AccountantAyush S. Kankariya
PartnerRole in project
Dhariwal And Chhoriya Developers LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Oct 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2030

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Hingoli Phase 1 Form 1 March 2026.pdf11 Jul 2026
Withdrawal Update Form 2File: Hingoli Phase 1 Form 2 March 2026.pdf11 Jul 2026
Withdrawal Update Form 3File: Hingoli Form 3 March 2026.pdf11 Jul 2026
Form 1File: Hingoli Form 1 Dec 2025.pdf17 Mar 2026
Form 2File: Hingoli Form 2 Dec 2025.pdf17 Mar 2026
Form 3File: Hingoli Form 3 Dec 2025.pdf17 Mar 2026
Disclosure of Sold and Booked InventoryFile: Hingoli Sold-Unsold Dec 2025.pdf17 Mar 2026
Form 1File: Hingoli Form 1 Sept 2025.pdf16 Jan 2026
Form 2File: Hingoli Form 2 Sept 2025.pdf16 Jan 2026
Form 3File: Hingoli Form 3 Sept 2025.pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: Hingoli.pdf16 Jan 2026
Form 1File: Hingoli Form 1 June 25.pdf28 Aug 2025
Form 2File: Hingoli Form 2 June 25.pdf28 Aug 2025
Form 3File: Hingoli Form 3 June 25.pdf28 Aug 2025
Disclosure of Sold and Booked InventoryFile: Hingoli Sold & Unsold June 2025.pdf28 Aug 2025
Form 1File: Hingoli Form 1 March 2025.pdf23 Jun 2025
Form 2File: Hingoli Form 2 March 2025.pdf23 Jun 2025
Form 3File: Hingoli Form 3 March 2025.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Hingoli Sold & Unsold.pdf23 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Hingoli Form 3 Dec 2024.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Hingoli Phase 1 Form 1 Dec 2024.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hingoli Phase 1 Form 2 Dec 2024.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hingoli Phase 1 Form 2 Dec 2024.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Hingoli P1 Sept24.pdf26 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Hingoli Phase 1 Form 1.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Hingoli Phase 1 Form 1.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hingoli Phase 1 Form 2.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hingoli Phase 1 Form 2.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hingoli Phase 1 Form 2.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Hingoli P1 June24.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Hingoli P1 June24.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Hingoli P1 June24.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Hingoli P1 March 24.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Hingoli P1 March 24.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Hingoli P1 March 24_compressed.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: F5 CA Balsond hingoli (P-1) Plotting 20-21.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: F5 CA Balsond hingoli (P-1) Plotting 21-22.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: F5 CA Balsond hingoli (P-1) Plotting 22-23.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: F5 CA Balsond hingoli (P-1) Plotting 23-24.pdf5 Jun 2024
Disclosure of sold/ booked inventoryFile: Arvi P1.pdf7 May 2024
Disclosure of sold/ booked inventoryFile: Hingoli.pdf7 May 2024
Disclosure of sold/ booked inventoryFile: Hingoli.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Hingoli P1 Dec23.pdf23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Hingoli P1 Dec23.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Hingoli P1 Sept 2023_compressed.pdf5 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Hingoli Sept23.pdf29 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Hingoli Sept23.pdf29 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Hingoli P1 June 20231.pdf29 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Hingoli P1 Dec 2022.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Hingoli P1 March 2023.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Hingoli P1 june 2033.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Hingoli P1 Dec 2022.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Hingoli P1 March 2023.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Hingoli P1 june 2023.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Hingoli P1 Dec 2022.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Hingoli March 2023.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Hingoli P1 June 20231.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar hongoli site.pdf30 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er hingoli site.pdf30 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA hongoli_11zon.pdf30 Dec 2022
Disclosure of sold/ booked inventoryFile: Hingoli.pdf28 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Hingoli_11zon.pdf28 Sep 2022
Disclosure of sold/ booked inventoryFile: Hingoli.pdf27 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ar hingoli.pdf23 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er hingoli.pdf23 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar cert R M Dhariwal Garden City Balsand Hingoli plotting phase 1.pdf6 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certi R M Dhariwal Garden City Balsand Hingoli plotting phase 1.pdf6 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert R M Dhariwal Garden City Balsand Hingoli plotting phase 1.pdf6 Jul 2022
CERSAI detailsFile: CERSAI HINGOLI.pdf13 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 HINGOLI PHASE 1.pdf14 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 HINGOLI PHASE 1.pdf14 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 HINGOLI PHASE 3_compressed.pdf14 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 HINGOLI.pdf10 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 HINGOLI.pdf10 Feb 2022
Disclosure of sold/ booked inventoryFile: Hingoli.pdf22 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA HINGOLI PLOTTING PHASE 1_compressed.pdf7 Dec 2021
Declaration about Commencement CertificateFile: DECLARATION HINGOLI PHASE 1.pdf30 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Hingoli CA Certificate.pdf2 Nov 2020
Layout approvalFile: Hingoli sanction layout.pdf5 Oct 2020
Layout approvalFile: Hingoli RERA PHASEWISE LAYOUT.pdf5 Oct 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
R M Dhariwal Township Tembhurni PlottingPost - Tembhurni Tal - madha Dist - solapur193CompletedDec 2019Dec 2019

Keep R M Dhariwal Garden City - Balsond Hingoli P on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Balsond, Hingoli7 in Hingoli

Builder: Dhariwal And Chhoriya Developers LLP

Dhariwal And Chhoriya Developers LLP has 11 registrations on MahaRERA, including R M Dhariwal Greens Yavatmal Phase 1 and R M Dhariwal Greens Yavatmal Phase - 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Hingoli district page.

Frequently asked questions

What are my rights if R M Dhariwal Garden City - Balsond Hingoli Plotting Phase - 1 is delayed beyond 30 Jun 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of R M Dhariwal Garden City - Balsond Hingoli Plotting Phase - 1?

The registered promoter entity is Dhariwal And Chhoriya Developers LLP, a partnership as per the filing. Its GSTIN 27AAIFD2049JIZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in R M Dhariwal Garden City - Balsond Hingoli Plotting Phase - 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for R M Dhariwal Garden City - Balsond Hingoli Plotting Phase - 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at R M Dhariwal Garden City - Balsond Hingoli Plotting Phase - 1?

The professionals named in the filing: Architect: Mr Kunal P Patil Patil; Engineer: IMPower Projects - Mr Manish Pande; Engineer: Avinash Wadgaonkar; Chartered Accountant: Ayush S. Kankariya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in R M Dhariwal Garden City - Balsond Hingoli Plotting Phase - 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About R M Dhariwal Garden City - Balsond Hingoli Plotting Phase - 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save R M Dhariwal Garden City - Balsond Hingoli P to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.