Home / Browse projects / Thane, Maharashtra / CONCORDE REALTY KAILASH BUILDING NO 11
CONCORDE REALTY KAILASH BUILDING NO 11
RG-MH-49915 · RERA P51700053222 · Last updated on MahaRERA portal: 9 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Litigation declared, 2 cases
- 1 complaint at MahaRERA
Clear
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CONCORDE REALTY KAILASH BUILDING NO 11 is a Residential / Group Housing project by Concorde Realty in Thane, Maharashtra, registered with MahaRERA as P51700053222 on 23 Oct 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 0 of the 110 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameCONCORDE REALTY KAILASH BUILDING NO 11
- TypeResidential / Group Housing
- Location
- KHIDKALI
- Thane (M Corp.)
- Thane
- 421204
- Pincode421204
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700053222
- ReraGenie IDRG-MH-49915
Builder
- NameConcorde Realty
- Entity typePartnership
- PartnersSanjay Chandan Parekh, Manish Gyanchand Mehta, Cosmos Skyline Homes Pvt Ltd Cosmos Skyline Homes pvt Ltd Company, Pradeep Ghisulal Rathod
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on23 Oct 2023
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed76 files
Current status
Figures as on 9 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CONCORDE REALTY KAILASH BUILDING NO 11 | NA | 16 | 16 | 110 | 0 | 110 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
CONCORDE REALTY KAILASH BUILDING NO 11: 86% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 9 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed178
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| BALKRISHNA POSHATHAKUR | Kalyan | Thane |
| Mahadev Posha Thakur | Kalyan | Thane |
| Pandharinath Posha Thakur | Kalyan | Thane |
| Shankar Posha Thakur | Kalyan | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| CONCORDE REALTY KAILASH BUILDING NO 11 | NA | Rs 23.17 cr | Rs 18.77 cr |
| - | NA | Rs 3.00 cr | Rs 1.80 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Suvarna Ghosh |
| Engineer | R.C. Tipnis |
| Engineer | R C TIPNIS |
| Chartered Accountant | Shrikant Dilip Kawde |
| Chartered Accountant | SHRIKANT KAWDE |
| Chartered Accountant | VISHAL KHATRI |
| Partner | Role in project |
|---|---|
| Concorde Realty | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 746/2013/2013 | CIVIL COURT THANE | PENDING |
| 746 2013/2013 | CIVIL COURT THANE | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12602734 | Prabha Nadar | Concorde Realty | 10/05/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Sep 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed76
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Jun 2025.pdf | 9 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Sept 25.pdf | 9 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Sept 25.pdf | 9 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Dec 25.pdf | 9 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Dec 25.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 june25.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Sept 25.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Sept 25.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 25.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 25.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Jun 25.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Sept 25.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Sept 25.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Sept 25.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Dec 25.pdf | 9 Mar 2026 |
| Form 1File: Concorde Realty (Form 1).pdf | 6 Aug 2025 |
| Form 2File: Form 2 March 25 - Copy.pdf | 6 Aug 2025 |
| Form 3File: Form 3 March 25.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: KAILASH SOLD BOOKED INVENTORY.pdf | 6 Aug 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Kailash Mar 24.pdf | 17 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 25 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2024_compressed.pdf | 25 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 March 2024_compressed.pdf | 25 Oct 2024 |
| Copy of the legal title reportFile: legal Title Report_11zon.pdf | 26 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: legal Encumbrance Certificate.pdf | 11 Sep 2023 |
| Details of encumbrances concerned to LegalFile: legal Encumbrance Certificate.pdf | 11 Sep 2023 |
| Other - LegalFile: DA DATED 1.pdf | 11 Sep 2023 |
| Other - LegalFile: DA DATED 2.pdf | 11 Sep 2023 |
| Other - LegalFile: DA DATED 3.pdf | 11 Sep 2023 |
| Other - LegalFile: DA DATED 4.pdf | 11 Sep 2023 |
| Other - LegalFile: DA DATED 5.pdf | 11 Sep 2023 |
| Other - LegalFile: DA DATED 6.pdf | 11 Sep 2023 |
| Other - LegalFile: DA DATED 7.pdf | 11 Sep 2023 |
| Other - LegalFile: DA DATED 8.pdf | 11 Sep 2023 |
| Other - LegalFile: DA DATED 9.pdf | 11 Sep 2023 |
| Other - LegalFile: 7-12 DATED 07-12-2020 OWNER.pdf | 11 Sep 2023 |
| Other - LegalFile: 7-12 MIDC DATED 21-04-2015.pdf | 11 Sep 2023 |
| Other - LegalFile: over possession.pdf | 11 Sep 2023 |
| Other - LegalFile: POSSESSION RECEIPT DATED 17-09-2013.pdf | 11 Sep 2023 |
| Other - LegalFile: RERA DECALRATION DATED 26-08-2023.pdf | 11 Sep 2023 |
| Other - LegalFile: 7-12 TMC.pdf | 11 Sep 2023 |
| Other - LegalFile: RECTIFICATION DATED 20-12-2013 1.pdf | 11 Sep 2023 |
| Other - LegalFile: RECTIFICATION DATED 20-12-2013 2.pdf | 11 Sep 2023 |
| Proforma of Allotment letterFile: Allottment letter Meluha.pdf | 17 Jun 2023 |
| Deviation Report with respect to Allotment letterFile: No Deviation Report Allotment.pdf | 17 Jun 2023 |
| Deviation Report with respect to model copy of AgreementFile: No deviation report Agreement for sale.pdf | 8 Jun 2023 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf | 25 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 12 Apr 2023 |
| CERSAI detailsFile: CERSAI.pdf | 5 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 5 Apr 2023 |
| Other - FinanceFile: No Encumbrance Certifiacte.pdf | 5 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: No encumbrance.pdf | 17 Mar 2023 |
| Details of encumbrances concerned to LegalFile: No encumbrance.pdf | 17 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Cosmos Skyline Homes pvt Ltd.pdf | 21 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Manish G mehta.pdf | 21 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Pankaj g rathod.pdf | 21 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Pradeep G rathod.pdf | 21 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Sanjay Chandan Parekh.pdf | 21 Jan 2023 |
| Declaration about Commencement CertificateFile: FORMAT D.pdf | 12 Jul 2022 |
| Layout approvalFile: Con Realty Layout.pdf | 6 Jul 2022 |
| Building plan approvalFile: 01.pdf | 6 Jul 2022 |
| Building plan approvalFile: 02.pdf | 6 Jul 2022 |
| Building plan approvalFile: 06.pdf | 6 Jul 2022 |
| Building plan approvalFile: 07.pdf | 6 Jul 2022 |
| Building plan approvalFile: 08.pdf | 6 Jul 2022 |
| Copy of Layout Approval (in case of layout)File: Con Realty Layout.pdf | 6 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 01.pdf | 6 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 02.pdf | 6 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 06.pdf | 6 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 07.pdf | 6 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 08.pdf | 6 Jul 2022 |
| Declaration in FORM BFile: Form B.pdf | 6 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC DATED 16-11-2021.pdf | 5 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 23 Apr 2022 |
| PAN CardFile: Concorde Realty.pdf | 20 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Meluha Bldg no 11.pdf | 20 Jan 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 76 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep CONCORDE REALTY KAILASH BUILDING NO 11 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KHIDKALI7,600+ in Thane
Filed coordinates, straight-line distance. 87 registered projects within 2 km.
Constrcution of 2557 EWS tenements at S.No.157
ARUN SHANKARRAO BORGAVE
Runwal Gardens Phase I
Runwal Residency Private Limited
Runwal Garden City Cluster 6 Tower 6 to 9
HORIZON PROJECTS PVT LTD
Runwal Gardens Phase 6A Bldg No. 53-54
Runwal Residency Private Limited
RGC Runwal My City EWS - LIG Building
HORIZON PROJECTS PVT LTD
BALAJI ESTATE PHASE 2
M/S SAI BALAJI BUILDCON
See every Thane project, with the district possession charts
Builder: Concorde Realty
Concorde Realty has 2 registrations on MahaRERA, including Cosmos Meluha and CONCORDE REALTY KAILASH BUILDING NO 11. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that CONCORDE REALTY KAILASH BUILDING NO 11 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if CONCORDE REALTY KAILASH BUILDING NO 11 is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CONCORDE REALTY KAILASH BUILDING NO 11?
The registered promoter entity is Concorde Realty, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CONCORDE REALTY KAILASH BUILDING NO 11?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against CONCORDE REALTY KAILASH BUILDING NO 11?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for CONCORDE REALTY KAILASH BUILDING NO 11?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CONCORDE REALTY KAILASH BUILDING NO 11?
The professionals named in the filing: Architect: Suvarna Ghosh; Engineer: R.C. Tipnis; Engineer: R C TIPNIS; Chartered Accountant: Shrikant Dilip Kawde; Chartered Accountant: SHRIKANT KAWDE; Chartered Accountant: VISHAL KHATRI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CONCORDE REALTY KAILASH BUILDING NO 11?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback