Home / Browse projects / Mumbai Suburban, Maharashtra / CHEMBUR SHRAVAN
CHEMBUR SHRAVAN
By JOHN DENNIS CONSTRUCTIONS PVT. LTD.
RG-MH-12729 · RERA P51800022435 · Last updated on MahaRERA portal: 3 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 27 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CHEMBUR SHRAVAN is a Residential / Group Housing project by JOHN DENNIS CONSTRUCTIONS PVT. LTD. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800022435 on 23 Sep 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 27 months from the original filing. 54 of the 78 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameCHEMBUR SHRAVAN
- TypeResidential / Group Housing
- Location
- SAHAKAR NAGAR NUMBER 1
- CHEMBUR WEST
- Chembur
- CTSO Chembur
- Mumbai Suburban
- 400071
- Pincode400071
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800022435
- ReraGenie IDRG-MH-12729
Builder
- NameJOHN DENNIS CONSTRUCTIONS PVT. LTD.
- Entity typeCompany
- DirectorSHAUN DENNIS FERNANDES
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Sep 2019
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 1 Sep 2024)
- Buildings1 building record
- Documents filed127 files
Current status
Figures as on 3 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CHEMBUR SHRAVAN | NA | 17 | 16 | 78 | 0 | 78 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 95%.
CHEMBUR SHRAVAN: 43% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 57% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 57% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 10% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 3 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed36
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| CHEMBUR SHRAVAN CO-OP SOCIETY LIMITED | Kurla | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| CHEMBUR SHRAVAN | NA | Rs 19.24 cr | Rs 5.49 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KEN ASSIST |
| Engineer | SSCONS CONSULTING STRUCTURAL ENGINEERS |
| Chartered Accountant | A K O R D AND CO |
| Chartered Accountant | RVB & ASSOCIATES |
| Partner | Role in project |
|---|---|
| JOHN DENNIS CONSTRUCTIONS PVT. LTD. | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter• The real estate industry went through multiple challenges over the pandemic years with supply chain disruption, labour crisis, and budget crunch slowing down growth. • We have been grappled with shortage of labour and a demand slump challenges triggered by market volatility. Construction rates have shot up and the market has also witnessed the pressure of inflation. • Due to unavailability of skilled labour and labour migration issues, project is affected a lot. Even contractors are asking us to allow them more time due to labour issues. • The geopolitical tension around the globe has led to
Reason as filed by the promoter• We have been grappled with shortage of labor and a demand slump challenge triggered by market volatility. Construction rates have shot up and the market has also witnessed the pressure of inflation. • Hence it is mandatory to replace existing agencies with the settlement of new vendors. Deployment consumed more time period. • The geopolitical tension around the globe has led to rise in prices of core raw materials such as cement and steel. • The past few years have been particularly difficult for us i.e. demand for housing collapsed considerably & rising cost of construction. • Our allottees
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000209639 | prashant prakash shelar | JOHN DENNIS CONSTRUCTION PVT LTD ( DENNIS FERNANDES ) | 07/01/2022 |
| CC12601511 | HASID HAMID MANSURI | JOHN DENNIS CONSTRUCTIONS PVT. LTD. | 19/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Sep 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Sep 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Jul 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed127
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: Highlighted Sanctioned Layout PDF 1.pdf | 3 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 With Sing Q3 .pdf | 12 May 2026 |
| Withdrawal Update Form 1File: FORM 1 Q4 .pdf | 12 May 2026 |
| Withdrawal Update Form 2File: Form 2_Q3 FY 25-26.pdf | 12 May 2026 |
| Withdrawal Update Form 2File: Form 2_Q4 FY 25-26.pdf | 12 May 2026 |
| Withdrawal Update Form 3File: Form 3_Q3 FY 25-26.pdf | 12 May 2026 |
| Withdrawal Update Form 3File: Form 3_Q4 FY 25-26 citiline.pdf | 12 May 2026 |
| Form 5 (FY 2023-2024)File: Final_Form 5_FY 23-24.pdf | 27 Apr 2026 |
| Form 5 (FY 2022-2023)File: Final_Form 5_FY 22-23.pdf | 27 Apr 2026 |
| Form 2A (FY 2024-2025)File: Shravan Form 2A_FY 24-25_.pdf | 3 Apr 2026 |
| Withdrawal Update Form 1File: From 1 with sing Q2.pdf | 2 Apr 2026 |
| Withdrawal Update Form 2File: Form 2_Q2 FY 25-26.pdf | 2 Apr 2026 |
| Withdrawal Update Form 3File: form 3 Q2 .pdf | 2 Apr 2026 |
| Form 5 (FY 2024-2025)File: Form 5 FY 2024-25.pdf | 2 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 with sing Q1.pdf | 1 Apr 2026 |
| Withdrawal Update Form 2File: Form 2_Q1 FY 25-26.pdf | 1 Apr 2026 |
| Withdrawal Update Form 3File: From 3 citiline Fy 25-26 Q1.pdf | 1 Apr 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Q4 shravan-signed_compressed.pdf | 5 May 2025 |
| Disclosure of sold/ booked inventoryFile: Q4 Disclosure of Sold or Unsold Inventory (1).pdf | 5 May 2025 |
| Disclosure of sold/ booked inventoryFile: Q4 Disclosure of Sold or Unsold Inventory.pdf | 19 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Annexure 3-Non-Encumbrance Concerned to Finance and Legal.pdf | 7 Apr 2025 |
| CERSAI detailsFile: Annexure 4-Asset Based Declaration.pdf | 7 Apr 2025 |
| CERSAI detailsFile: Annexure 4-Debtor Based Declaration.pdf | 7 Apr 2025 |
| Details of encumbrances concerned to LegalFile: Annexure 3-Non-Encumbrance Concerned to Finance and Legal.pdf | 7 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3-Architecht Certificate- chembur.pdf | 24 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form Q3-Shravan.pdf | 24 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 Engineer Certificate- chembur.pdf | 24 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventrory.pdf | 24 Feb 2025 |
| CERSAI detailsFile: Annexure 4-Asset Based Declaration PDF 1.pdf | 24 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: Annexure 3 Non Encumbrance Concerned to Finance Legal PDF.pdf | 22 Feb 2025 |
| CERSAI detailsFile: Annexure 4-Asset Based Declaration PDF 1.pdf | 22 Feb 2025 |
| CERSAI detailsFile: Annexure 4-Debtor Based Declaration PDF (1).pdf | 22 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Annexure 3 Non Encumbrance Concerned to Finance Legal PDF.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Decl of Sold Unsold Inventory_30 Sep 2024.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-03-2024.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-09-2024.pdf | 16 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Decl of Sold Unsold Inventory_30 Sep 2024.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-03-2024.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-09-2024.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-03-2024.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-09-2024.pdf | 16 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Decl of Sold Unsold Inventory_30 Sep 2024.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_FY 23-24.pdf | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_upto 30Sep24.pdf | 15 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 03 March 2024.pdf | 15 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final_Form 3_30Sep2024.pdf | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_FY 23-24.pdf | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_upto 30Sep24.pdf | 15 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final_Form 3_30Sep2024.pdf | 15 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 03 March 2024.pdf | 15 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final_Form 3_30Sep2024.pdf | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_FY 23-24.pdf | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_upto 30Sep24.pdf | 15 Oct 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf | 14 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_05072024.pdf | 14 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Final_Form 5_FY 22-23.pdf | 14 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final_Form 5_FY 23-24.pdf | 14 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_FY 19-20.pdf | 14 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_FY 20-21.pdf | 14 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_FY 21-22.pdf | 14 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_FY 22-23.pdf | 14 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_FY 23-24.pdf | 14 Oct 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf | 14 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_05072024.pdf | 14 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Final_Form 5_FY 22-23.pdf | 14 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final_Form 5_FY 23-24.pdf | 14 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_FY 19-20.pdf | 14 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_FY 20-21.pdf | 14 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_FY 21-22.pdf | 14 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_FY 22-23.pdf | 14 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_FY 23-24.pdf | 14 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_05072024.pdf | 14 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_FY 19-20.pdf | 14 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_FY 20-21.pdf | 14 Oct 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf | 14 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_FY 21-22.pdf | 14 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_FY 22-23.pdf | 14 Oct 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 127 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep CHEMBUR SHRAVAN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHEMBUR WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 20 registered projects within 2 km.
Hiranandani Maitri Park Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Premiere by Panache
Panache Developers Pvt Ltd.
Sai Shrushti
Shree Sai Realtors
MASS METROPOLIS
GRACE URBAN DEVELOPMENT CORPORATION
ELEVIA
VIDA INFRAHUB LLP
PODDAR HARMONY
PODDAR CREATORS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: JOHN DENNIS CONSTRUCTIONS PVT. LTD.
JOHN DENNIS CONSTRUCTIONS PVT. LTD. has 1 registration on MahaRERA, including CHEMBUR SHRAVAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if CHEMBUR SHRAVAN is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CHEMBUR SHRAVAN?
The registered promoter entity is JOHN DENNIS CONSTRUCTIONS PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CHEMBUR SHRAVAN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against CHEMBUR SHRAVAN?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for CHEMBUR SHRAVAN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CHEMBUR SHRAVAN?
The professionals named in the filing: Architect: KEN ASSIST; Engineer: SSCONS CONSULTING STRUCTURAL ENGINEERS; Chartered Accountant: A K O R D AND CO; Chartered Accountant: RVB & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CHEMBUR SHRAVAN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback