Red flags

  • Litigation declared, 1 case
  • Completion date moved by 4 months
  • 1 extension taken
  • Encumbrance declared on the project land, in favour of NA
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2033Possession promisedmoved 4 months from the original
0 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 0%
873 of 873Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

CHANDAK HIGHSCAPE CITY 1B is a Mixed project by CHANDAK REALTORS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as PM1181012400048 on 3 Oct 2024. Possession is promised by 30 Apr 2033. The completion date has moved by 4 months from the original filing. 0 of the 873 units on this registration are recorded sold or booked, and 0 of 44 construction stages are filed complete.

At a glance

Project

  • NameCHANDAK HIGHSCAPE CITY 1B
  • TypeMixed
  • Location
    • Off Eastern Freeway
    • Kurla
    • Wadhavali
    • Mumbai Suburban
    • 400074
  • Pincode400074
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1181012400048
  • ReraGenie IDRG-MH-18717

Builder

  • NameCHANDAK REALTORS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45201MH2006PTC165932
  • GSTIN27AADCC0680N1ZG
  • DirectorsABHAY CHANDAK, ADITYA CHANDAK
  • Other registrations4 more →
  • Declared earlier projects10 →

Key dates

this monthRegisteredOct 2024First promiseDec 2032Revised toApr 2033

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Oct 2024
  • Promised completion30 Apr 2033
  • Revised completionRevised to 30 Apr 2033 (originally 30 Dec 2032)
  • Buildings4 building records
  • Documents filed56 files

Current status

0%0 of 873 units booked
0.0%Work done, per cost certificate

Figures as on 30 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
tower 3NA37332980298
tower 4NA18151200120
tower 5NA37312250225
tower 6NA37322300230

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 30 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 0%.

tower 30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
tower 40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
tower 50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
tower 60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed873

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots873
Podiums / Upper Parking Floor873
BuildingPodiums / Upper Parking FloorTotal
tower 3298298
tower 4120120
tower 5225225
tower 6230230

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area53,192 sq m
Land owned byNot the promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofNA
Declared on3 Jun 2025

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI128074.43
Proposed, not sanctioned52,882 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVISHAL SHOPPING CENTRESIR M.V. ROAD OPP. GYMKHANAANDHERI E MUMBAI MAHARASHTRA 400069
Estimated costRs 527.48 cr
Work done0.0%
BuildingWingEstimatedIncurred
tower 3NARs 159.62 cr-
tower 5NARs 116.34 cr-
tower 6NARs 107.29 cr-
-NARs 79.12 cr-
tower 4NARs 65.11 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSkyline Infrabuilt Consultants PVT. LTD
EngineerCHIRAG SHAH
EngineerGopal Madugula
Chartered AccountantNikhil Chandra
Chartered AccountantVA SH
Chartered AccountantKEDIA SINGHANIA AND CO.
Chartered AccountantSinghvi and Singhvi
PartnerRole in project
CHANDAK REALTORS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PM1181012400048/WarDec 2032 → Apr 2033

Reason as filed by the promoterNA

Litigation declared1

CaseCourtStatus
533/2023HIGH COURT OF BOMBAYOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Sep 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Sep 2024
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2033

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5-Chandak Highscape City 1B-2025-26.pdf30 Sep 2026
Withdrawal Update Form 1File: Chembur 1B-Form 1-June 2026.pdf20 Jul 2026
Withdrawal Update Form 2File: Chembur 1B-Form 2-June 2026.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3-Chembur 1B-June 2026.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate-31032026.pdf25 Apr 2026
Withdrawal Update Form 2File: Form-2-CRPL -1B.pdf25 Apr 2026
Withdrawal Update Form 3File: Fomr 3-March 26 Chemur Phase1B.pdf25 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A-Chandak Highscape City 1B-2025-26.pdf24 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A- Engineer Certificate- CRPL- 2024-25.pdf14 Apr 2026
Withdrawal Update Form 1File: Chembur Form 1 - 1B.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2- Chembur Ph1B-Dec 25.pdf20 Jan 2026
Withdrawal Update Form 3File: CHANDAK REALTORD PVT LTS ( CHANDAK HIGHSCAPE CITY 1B ) FORM 3.pdf20 Jan 2026
Withdrawal Update Form 1File: Chembur 1B Form 1.pdf17 Oct 2025
Withdrawal Update Form 2File: CRPL HIGHSCAPE FORM 2 1B.pdf17 Oct 2025
Withdrawal Update Form 3File: Chembur 1B-Form 3-30092025.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Chandak Highscape City 1B.pdf24 Sep 2025
Withdrawal Update Form 1File: Form1 - Architect Form 1B.pdf20 Jul 2025
Withdrawal Update Form 1File: Form1 - Architect Form 1B.pdf20 Jul 2025
Withdrawal Update Form 2File: Form 2 Engineer certificate.pdf20 Jul 2025
Withdrawal Update Form 2File: Form 2 Engineer certificate.pdf20 Jul 2025
Withdrawal Update Form 3File: Form 3-alongwith declaration.pdf20 Jul 2025
Withdrawal Update Form 3File: Form 3-alongwith declaration.pdf20 Jul 2025
Form 1File: Form 1-31122024.pdf8 May 2025
Form 2File: Form 1-merged.pdf8 May 2025
Form 3File: FORM-2 (Project Chandak Highscape City 1B)-Mar,25.pdf8 May 2025
Form 2File: FORM-2 (Project Chandak Highscape City 1B)-Dec,24.pdf5 May 2025
Layout approvalFile: Layout 1B.pdf30 Sep 2024
Building plan approvalFile: Part 1-common.pdf17 Sep 2024
Building plan approvalFile: Part 2- common.pdf17 Sep 2024
Building plan approvalFile: Part 3-common.pdf17 Sep 2024
Building plan approvalFile: Part 4-common.pdf17 Sep 2024
Building plan approvalFile: Tower 3-1.pdf17 Sep 2024
Building plan approvalFile: Tower 3-2.pdf17 Sep 2024
Building plan approvalFile: Tower 3-3.pdf17 Sep 2024
Building plan approvalFile: Tower 3-4.pdf17 Sep 2024
Building plan approvalFile: Tower 3-5.pdf17 Sep 2024
Building plan approvalFile: Tower 3-6.pdf17 Sep 2024
Building plan approvalFile: Tower 4-1.pdf17 Sep 2024
Building plan approvalFile: Tower 4-2.pdf17 Sep 2024
Building plan approvalFile: Tower 4-3.pdf17 Sep 2024
Building plan approvalFile: Tower 4-4.pdf17 Sep 2024
Building plan approvalFile: Tower 4-5.pdf17 Sep 2024
Building plan approvalFile: Tower 5-1.pdf17 Sep 2024
Building plan approvalFile: Tower 5-2.pdf17 Sep 2024
Building plan approvalFile: Tower 5-3.pdf17 Sep 2024
Building plan approvalFile: Tower 5-4.pdf17 Sep 2024
Building plan approvalFile: Tower 5-5.pdf17 Sep 2024
Building plan approvalFile: Tower 5-6.pdf17 Sep 2024
Building plan approvalFile: Tower 6-1.pdf17 Sep 2024
Building plan approvalFile: Tower 6-2.pdf17 Sep 2024
Building plan approvalFile: Tower 6-3.pdf17 Sep 2024
Building plan approvalFile: Tower 6-4.pdf17 Sep 2024
Building plan approvalFile: Tower 6-5.pdf17 Sep 2024
Building plan approvalFile: Tower 6-6.pdf17 Sep 2024
Building plan approvalFile: Tower 6-7.pdf17 Sep 2024
Building plan approvalFile: Tower 6-8.pdf17 Sep 2024

Promoter's earlier projects10

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 not delivered by the promised date4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Chandak Highscape City 1AP51800055726Chembur, Mumbai Suburban1,183Apr 2024OngoingDec 2030Not due yet
Chandak TreesourusP51800048658Chinchavali, Mumbai Suburban630Jan 2023OngoingDec 2028Not due yet
34 Park EstateP51800006729Goregaon, Mumbai Suburban1,133Aug 2017OngoingJul 2028Not due yet
GREENAIRYP51800035093BORIVALI EAST, Mumbai Suburban1,048May 2022OngoingJun 2028Not due yet
UNICORNP51800028365ANDHERI WEST, Mumbai Suburban272Feb 2021OngoingJun 2026Not delivered
Nishchay Wing AP51800019863Dahisar, Mumbai Suburban198Mar 2019OngoingDec 2025Not delivered
NISHCHAY Wing BP51800019891Dahisar, Mumbai Suburban466Mar 2019OngoingDec 2025Not delivered
NISHCHAY WING FP51800009954DAHISAR, Mumbai Suburban167Aug 2017OngoingDec 2024Not delivered
NISHCHAY WING DP51800016172Revenue Mouje Dahisar, Mumbai Suburban167Apr 2018OngoingDec 2024Not delivered
NISHCHAY - WING EP51800015985REVENUE MAJUE DAHISAR, Mumbai Suburban167Apr 2018OngoingDec 2024Not delivered

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 4 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CHANDAK HIGHSCAPE CITY 1B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmCHANDAK HIGHSCAPE CITY 1Completed 64Lapsed / revoked 38Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 146 registered projects within 2 km.

Builder: CHANDAK REALTORS PRIVATE LIMITED

CHANDAK REALTORS PRIVATE LIMITED has 5 registrations on MahaRERA, including Chandak Treesourus and Chandak Highscape City 1A. Its filings disclose 10 earlier MahaRERA projects, none completed yet. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if CHANDAK HIGHSCAPE CITY 1B is delayed beyond 30 Apr 2033?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHANDAK HIGHSCAPE CITY 1B?

The registered promoter entity is CHANDAK REALTORS PRIVATE LIMITED, a company as per the filing. Its CIN U45201MH2006PTC165932 and GSTIN 27AADCC0680N1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHANDAK HIGHSCAPE CITY 1B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHANDAK HIGHSCAPE CITY 1B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHANDAK HIGHSCAPE CITY 1B?

The professionals named in the filing: Architect: Skyline Infrabuilt Consultants PVT. LTD; Engineer: CHIRAG SHAH; Engineer: Gopal Madugula; Chartered Accountant: Nikhil Chandra; Chartered Accountant: VA SH; Chartered Accountant: KEDIA SINGHANIA AND CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHANDAK HIGHSCAPE CITY 1B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHANDAK HIGHSCAPE CITY 1B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHANDAK HIGHSCAPE CITY 1B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.