34 Park Estate
By M/S REDDY BUILDERS & DEVELOPERS
RG-MH-78359 · RERA P51800006729 · Last updated on MahaRERA portal: 13 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 20 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
34 Park Estate is a Residential / Group Housing project by M/S REDDY BUILDERS & DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006729 on 16 Aug 2017. Possession is promised by 31 Jul 2028. 20 complaints are on record with the regulator.
At a glance
Project
- Name34 Park Estate
- TypeResidential / Group Housing
- Location
- Goregaon
- Borivali
- Mumbai Suburban
- 400062
- Pincode400062
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800006729
- ReraGenie IDRG-MH-78359
Builder
- NameM/S REDDY BUILDERS & DEVELOPERS
- Entity typePartnership
- PartnersJAGDISH GUPTA GUPTA, P S SATHYA REDDY, VISHAL RAJGARHIA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 Aug 2017
- Promised completion31 Jul 2028
- Revised completionNone
- Buildings7 building records
- Documents filed98 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 43 | 36 | 0 | 0 | 0 |
| Wing B | NA | 43 | 36 | 0 | 0 | 0 |
| Wing C | NA | 43 | 36 | 0 | 0 | 0 |
| WING D | NA | 43 | 36 | 0 | 0 | 0 |
| WING E | NA | 41 | 0 | 0 | 0 | 0 |
| WING F | NA | 31 | 0 | 0 | 0 | 0 |
| REHAB - 4 YET TO BE APPROVED | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
25 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Internal walls, at 90%.
Wing A80%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 65% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
Wing B81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 65% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
Wing C81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 65% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
WING D75%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 65% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 65% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
WING E0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING F0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
REHAB - 4 YET TO BE APPROVED0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 65% |
| Water Supply | Yes | 65% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 65% |
| Storm Water Drains | Yes | 65% |
| Landscaping & Tree Planting | Yes | 65% |
| Street Lighting | Yes | 65% |
| Community Buildings | Yes | 65% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 65% |
| Solid Waste Management And Disposal | Yes | 65% |
| Water conservation /Rain water harvesting | Yes | 55% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 55% |
| Electrical meter room, sub-station, receiving station | Yes | 55% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| society office | Yes | 0% |
Parking filed1069
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Wing A | 130 | 130 |
| Wing B | 400 | 400 |
| Wing C | 204 | 204 |
| WING D | 216 | 216 |
| WING E | 104 | 104 |
| WING F | 15 | 15 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SUPREME INNOVATIVE BUILDING PROJECTS PVT LTD | Kurla | Mumbai Suburban |
| Chandak Realtors Private Limited | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Engineer | Gopal Madugula |
| Chartered Accountant | MONIKA GOYAL |
| Partner | Role in project |
|---|---|
| M/S REDDY BUILDERS & DEVELOPERS | - |
Complaints filed with MahaRERA20
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000055270 | Pawan Valecha | Supreme Innovative Building Projects Private Limited | 14/07/2018 |
| CC006000000100379 | Mr. Apoorva Ashokkumar Patni | M/s Reddy Builders and Developers | 02/08/2019 |
| CC006000000110822 | Pradeep Pant | Supreme Innovative Building Projects | 07/09/2019 |
| CC006000000194330 | Pradeep Pant & Yogita Pant | Reddy Builders & Developers | 07/10/2020 |
| CC006000000110828 | Deepak Singh Kanyal | Supreme Innovative Building Projects Pvt. Ltd. | 08/09/2019 |
| CC006000000194741 | Deepak Singh Kanyal / Pushpa Deepak Kanyal | Reddy Builder | 10/11/2020 |
| CC006000000195966 | Harishankar Kankani | M/s. Reddy Builders & Developers | 13/02/2021 |
| CC006000000196019 | Mr. Harish Maheshwari | M/s. Reddy Builders & Developers | 21/02/2021 |
| CC006000000196117 | Ashok Kumar Parakh | M/s. Reddy Builders & Developers | 21/02/2021 |
| CC006000000209670 | Urmila and Suman Manadhana | M/s. Reddy Developers and Builders | 11/01/2022 |
| CC006000000292693 | Chandak Realtors Private Limited | Jayashree Soma Panchal and Manali Mangesh Panchal | 15/09/2022 |
| CC006000000292695 | Chandak Realtors Private Limited | Sumit Anil Shrivastava | 15/09/2022 |
| CC006000000292700 | Chandak Realtors Private Limited | Keval Vasanji Savla and Jayshree Keval Savla | 15/09/2022 |
| CC006000000292701 | Chandak Realtors Private Limited | Jayashree Soma Panchal and Manali Mangesh Panchal | 15/09/2022 |
| CC006000000590999 | Chandak Realtors Pvt. Ltd. | Anjali Manoj Sainani | 13/07/2024 |
| CC006000000591000 | Chandak Realtors Pvt. Ltd. | Dinesh Singh | 13/07/2024 |
| CC006000000591002 | Chandak Realtors Pvt. Ltd. | Sanjam Kaur Chawla | 13/07/2024 |
| CC006000000591003 | Chandak Realtors Pvt. Ltd. | Santosh Kumar Kedarnath Tiwari | 13/07/2024 |
| CC12501660 | AVADHESH MISHRA | M/S REDDY BUILDERS & DEVELOPERS | 22/05/2025 |
| CC12503880 | Sunil Dujari | RACHANA SUMIT TODANKAR | 05/11/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Aug 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Jul 2028
Documents filed98
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1.pdf | 13 May 2026 |
| Form 2File: FORM 2 RBD.pdf | 13 May 2026 |
| Form 3File: Form 3-Upload.pdf | 13 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold-upload.pdf | 13 May 2026 |
| Form 2A (FY 2025-2026)File: Form 2A-34 Park Estate-2025-26.pdf | 24 Apr 2026 |
| Form 1File: Form 1.pdf | 20 Jan 2026 |
| Form 2File: Form 2.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold-34 Park Estate-31122025.pdf | 20 Jan 2026 |
| Form 3File: Form 3-upload.pdf | 20 Jan 2026 |
| Form 5 (FY 2024-2025)File: Reddy Builders-Form 5-2024-25.pdf | 19 Nov 2025 |
| Form 1File: Form 1-30092025.pdf | 5 Nov 2025 |
| Form 2File: Form-2.pdf | 5 Nov 2025 |
| Form 3File: Form 3-30092025-upload.pdf | 5 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold-30092025-upload.pdf | 5 Nov 2025 |
| Form 1File: Form 1.pdf | 8 Aug 2025 |
| Form 2File: RBD JUne 25 Form 2.pdf | 8 Aug 2025 |
| Form 3File: RBD JUne 25 Form 3.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: RBD Sold Unsold JUne 25.pdf | 8 Aug 2025 |
| Form 1File: FORM 1-31MARCH2025.pdf | 15 May 2025 |
| Form 2File: Form 2-MARCH 2025.pdf | 15 May 2025 |
| Form 3File: Form 3-mARCH 2025-compressed.pdf | 15 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventroy-31-3-25.pdf | 15 May 2025 |
| Disclosure of sold/ booked inventoryFile: 34 Park Estate Sold-Unsold (30th Sept 2024).pdf | 10 May 2025 |
| Disclosure of sold/ booked inventoryFile: 34 Park Estate Sold-Unsold (31st Dec 2024).pdf | 10 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-Dec 2024.pdf | 7 Mar 2025 |
| Certificates of CA (Form 3)File: 34 park eststae Form 3 Dec24.pdf | 23 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 RBD 31122024.pdf | 23 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Reddy Builders-2023-24.pdf | 23 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 31032024.pdf | 3 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 30062024.pdf | 3 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 30092024.pdf | 3 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-30062024.pdf | 27 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-30092024-1.pdf | 27 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3-30062024-compressed.pdf | 27 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3 30092024-compressed.pdf | 27 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5.pdf | 25 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sold-Unsold-Reddy Builders_compressed.pdf | 25 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 34 Park Estate Wing A to D Architect Certificate upto 31st March, 2024.pdf | 25 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold-Reddy Builders_compressed.pdf | 25 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: 34 Park estate Building wise inventory compressed.pdf | 19 Jan 2024 |
| Certificates of CA (Form 3)File: VA SHIMPI ASSOCIATES FORM 3.pdf | 19 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 RBD Sep-23.pdf | 25 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3 RBD Sep-23.pdf | 25 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3_RBD_ March 2023.pdf | 20 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A_Wing A.pdf | 19 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Wing B.pdf | 19 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Wing C.pdf | 19 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Wing D.pdf | 19 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3 JUne 23 RBD.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Booking1.pdf | 7 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Reddy Builders-CC.pdf | 10 Aug 2023 |
| Certificates of CA (Form 3)File: FORM 3 34 Park Estate.pdf | 13 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 Architect Certificate December 2022.pdf | 12 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate 31st December 2022.pdf | 12 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2023 02 14 CG RBD FORM 5 FY 2018-19.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2023 02 14 CG RBD FORM 5 FY 2019-20.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2023 02 14 CG RBD FORM 5 FY 2020-21.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RBD Form 5_FY 2021-22.pdf | 16 Feb 2023 |
| Building plan approvalFile: IOD.pdf | 27 Jan 2023 |
| Building Plan Approval (IOD)File: IOD.pdf | 27 Jan 2023 |
| CERSAI detailsFile: CERSAI_Acknowledgemnt_Report_200214715126_For_Registration_Of_Security_Interest_24_01_2023 | 27 Jan 2023 |
| Layout approvalFile: Sale Bldg IOA.pdf | 25 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Details of Encumbrances- Litigation.pdf | 25 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Details of Encumbrances- Finance.pdf | 25 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Details of Encumbrances- Litigation.pdf | 25 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Details of Encumbrances- Finance.pdf | 25 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: Sale Bldg IOA.pdf | 25 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Sale Bldg Further CC.pdf | 25 Jan 2023 |
| Declaration about Commencement CertificateFile: Declaration CC.pdf | 25 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ilovepdf_merged-compressed.pdf | 25 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold Unit_compressed (1)-compressed-compressed.pdf | 25 Jan 2023 |
| Proforma of Allotment letterFile: RERA Agreement - for RERA.pdf | 21 Aug 2020 |
| Copy of the legal title reportFile: Title Sunil Badsiwal.pdf | 14 Aug 2020 |
| Layout approvalFile: Sale Building IOA.pdf | 21 Mar 2020 |
| Building plan approvalFile: Sale Building IOA.pdf | 21 Mar 2020 |
| Copy of Layout Approval (in case of layout)File: Sale Building IOA.pdf | 21 Mar 2020 |
| Building Plan Approval (IOD)File: Sale Building IOA.pdf | 21 Mar 2020 |
| OtherFile: RERA Decalaration.pdf | 13 Mar 2020 |
| Certificates of CA (Form 5)File: Certificate in Form 5 RBD 17-18 (1).pdf | 23 Nov 2018 |
| Layout approvalFile: Layout APPROVAL.pdf | 31 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 98 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep 34 Park Estate on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Goregaon6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 344 registered projects within 2 km.
NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY L
SHIVAM PARIVAR DEVELOPERS PVT LTD
GUNDECHA REXON SUITES PHASE 1
ANAYA INFRASTRUCTURE PVT LTD
PALAI TOWERS
N D DEVELOPERS
AGARWAL FLORENCE
PARAM ANAND BUILDERS LLP
KRISHNA KUNJ PHASE 1
PRINCE HOUSING AND HOSPITALITY PRIVATE LIM
NIRLON EMPLOYEES CHS LTD BUILDING NO. 10
Shivam Parivar Developers Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: M/S REDDY BUILDERS & DEVELOPERS
M/S REDDY BUILDERS & DEVELOPERS has 1 registration on MahaRERA, including 34 Park Estate. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if 34 Park Estate is delayed beyond 31 Jul 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of 34 Park Estate?
The registered promoter entity is M/S REDDY BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in 34 Park Estate?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against 34 Park Estate?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for 34 Park Estate?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at 34 Park Estate?
The professionals named in the filing: Engineer: Gopal Madugula; Chartered Accountant: MONIKA GOYAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 34 Park Estate?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.