Centria R Building - Casa
RG-MH-16959 · RERA P52100027893 · Last updated on MahaRERA portal: 24 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
- 13 complaints at MahaRERA
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- All 3 earlier projects delivered on promise
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Centria R Building - Casa is a Residential / Group Housing project by Ankit Enterprises in Pune, Maharashtra, registered with MahaRERA as P52100027893 on 14 Jan 2021. Possession was promised by 29 Dec 2024 and is now 22 months past that date. The completion date has moved by 6 months from the original filing. 13 complaints are on record with the regulator.
At a glance
Project
- NameCentria R Building - Casa
- TypeResidential / Group Housing
- Location
- Undri
- Haveli
- Pune
- 411060
- Pincode411060
- RERA no.P52100027893
- ReraGenie IDRG-MH-16959
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on14 Jan 2021
- Promised completion29 Dec 2024
- Revised completionRevised to 29 Dec 2024 (originally 30 Jun 2024)
- Buildings2 building records
- Documents filed78 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Casa | NA | 14 | 0 | 0 | 0 | 0 |
| Casa 13th Floor | NA | 1 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 24 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
17 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.
Casa100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Casa 13th Floor55%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed169
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Milind KOlte | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Reza Kabul Architects Pvt Ltd |
| Engineer | Nandlal Bhole |
| Chartered Accountant | CA Nikita Bajaj |
| Chartered Accountant | VIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS |
| Partner | Role in project |
|---|---|
| Ankit Enterprises | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs per attached application
Litigation declared3
| Case | Court | Status |
|---|---|---|
| RCS No 1340/2016 | C J Sr Div Pune Gaware Court | Unready Board |
| Spl CS 1441/2018/2018 | CJSD | Issues |
| 88/2019/2019 | District Court Pune | Filing of say |
Complaints filed with MahaRERA13
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000340689 | Shashikant Tripathi | Kolte patil Developers | 04/05/2024 |
| CC12400058 | Prakash Mahadeorao Bokde | Ankit Enterprises | 08/09/2024 |
| CC12401010 | Amit Kumar Patel | Ankit Enterprises | 04/12/2024 |
| CC12400643 | Amandeepsingh Kanwarpalsingh Anand | Ankit Enterprises | 04/11/2024 |
| CC12400662 | Ameeta Roy | Ankit Enterprises | 05/11/2024 |
| CC12401032 | Nitin Ambikaprasad Dubey | Ankit Enterprises | 04/12/2024 |
| CC12400825 | Kumar Chainani | Ankit Enterprises | 20/11/2024 |
| CC12401011 | Rajesh Hiremath | Ankit Enterprises | 04/12/2024 |
| CC12401033 | Ashish Gujar | Ankit Enterprises | 04/12/2024 |
| CC12401046 | Ankit Ajit Gujar | Ankit Enterprises | 05/12/2024 |
| CC12401059 | Ankit Malviya | Ankit Enterprises | 06/12/2024 |
| CC12401123 | Abhishek Kabra | Ankit Enterprises | 14/12/2024 |
| CC12600473 | Shashikant Tripathi | Ankit Enterprises | 26/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Dec 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Dec 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 24 Feb 2025
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: R-Building Completion Centria.pdf | 24 Feb 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - centria R.pdf | 6 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC R building.pdf | 31 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Centria-R.pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Centria-R.pdf | 17 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CENTRIA FORM 5.pdf | 9 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Centria R - FY23.pdf | 8 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Centria R - FY24.pdf | 8 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: inventory declaration Jun 24.pdf | 7 Aug 2024 |
| Declaration in FORM BFile: Form B- Affidavit- Promoter- Centra R Building Casa- RERA extension.pdf | 6 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Centria R - FY23.pdf | 6 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Centria R - FY24.pdf | 6 Aug 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of other interest.pdf | 6 Aug 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: bank declaration.pdf | 6 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Centria R.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Centria-R.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Centria-R.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Centria-R signed form-2.pdf | 19 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Centria R.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Centria R.pdf | 18 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Centria-R.pdf | 18 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Centria-R.pdf | 18 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Centria - Form2.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Centria -R.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Centria R.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CENTRIA R.pdf | 29 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ankit Enterprises - Centria R building.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Centria R.pdf | 20 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Centria R.pdf | 18 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Centria R building.pdf | 20 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Centria R.pdf | 20 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Centria R - form 3.pdf | 20 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Centria.pdf | 19 Apr 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200266192103_For_Debtor_Based_Search_15_04_2023_17_08_02_187.pdf | 15 Apr 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Intimation about formation of association and Index 2.pdf | 28 Feb 2023 |
| Proforma of Agreement for saleFile: AFS Centria R 22022023.pdf | 23 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Ankit Enterprises Centria.pdf | 19 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - Casa R.pdf | 18 Jan 2023 |
| CERSAI detailsFile: Cersai.pdf | 18 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - Centria R.pdf | 17 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - centria R.pdf | 17 Jan 2023 |
| Proforma of Agreement for saleFile: AFS.pdf | 2 Dec 2022 |
| Proforma of Agreement for saleFile: AFS 11112022.pdf | 11 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Ankit Enterprise Centria R Building.pdf | 20 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Centria R Bld- From 3 (1).pdf | 19 Oct 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200249955191_For_Debtor_Based_Search_17_10_2022_17_10_03_567.pdf | 18 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ankit Q2 arch certi.pdf | 6 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ankit R Building Casa.pdf | 30 Sep 2022 |
| Other - FinanceFile: Ankit R Building Casa.pdf | 29 Sep 2022 |
| Proforma of Allotment letterFile: Updated AFS.pdf | 18 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Inventory Declaration Centria R Building.pdf | 7 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Centria Form 3_compressed.pdf | 5 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cer Centria Case - Rbuilding.pdf | 4 Jul 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200241268081_For_Debtor_Based_Search_02_07_2022_12_39_57_146.pdf | 4 Jul 2022 |
| Proforma of Allotment letterFile: AFS R Building.pdf | 26 May 2022 |
| Disclosure of sold/ booked inventoryFile: Inventory Declaration Centria R Building Casa.pdf | 12 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Centria R.pdf | 8 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_Centria R.pdf | 7 Apr 2022 |
| CERSAI detailsFile: Ankit Enterprises.pdf | 6 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Centria R.pdf | 20 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bldg R 07-01-22.pdf | 18 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Centria R Casa.pdf | 15 Jan 2022 |
| CERSAI detailsFile: Ankit Enterprises.pdf | 7 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Centria BUILDING CASA.pdf | 7 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Centria R Signed Form 5.pdf | 30 Sep 2021 |
| Proforma of Allotment letterFile: 29-06-2021-FINAL-Draft-AFS- Centria-Bldg- R- CASA-HILLS DALES Phase III - Copy.pdf | 30 Jun 2021 |
| PAN CardFile: PAN.pdf | 24 Dec 2020 |
| Declaration in FORM BFile: Affidavit 2 Ankit.pdf | 24 Dec 2020 |
| Declaration in FORM BFile: Affidavit 2 Ankit.pdf | 24 Dec 2020 |
| Layout approvalFile: layout1.pdf | 23 Dec 2020 |
| Building plan approvalFile: layout1.pdf | 23 Dec 2020 |
| Copy of the legal title reportFile: title search certificate.pdf | 23 Dec 2020 |
| Details of encumbrancesFile: ankit encumbrances details.pdf | 23 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: layout1.pdf | 23 Dec 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: layout1.pdf | 23 Dec 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: coomencement certificate.pdf | 23 Dec 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed form 3.pdf | 23 Dec 2020 |
| Proforma of Allotment letterFile: AFS - casa.pdf | 23 Dec 2020 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Hills and Dales III Glamore | S No 13 P 14 P 15 P 19 P Tal Haveli Dist Pune | 140 | Completed | Apr 2016 | Apr 2016 |
| Hills and Dales III Allura | S No 13 P 14 P 15 P 19 P Tal Haveli Dist Pune | 140 | Completed | Jan 2014 | Jan 2014 |
| Hills and Dales III Elburz | S No 13 P 14 P 15 P 19 P Tal Haveli Dist Pune | 168 | Completed | Jul 2011 | Jul 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 78 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Centria R Building - Casa on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Undri13,700+ in Pune
THE SPECTRUM
SHRIRAM PROPERTIES LIMITED
GANGA MILLENNIA UNDRI BUILDING J,K,L,M AND N
GOEL GANGA INDIA PVT LTD
NYATI ESTEBAN II
NYATI REALTORS LLP
Lodha Pune NIBM Project
Lodha Developers Limited
KHUSH VISTA
Elated Housing LLP
The Atrium
Arhumashtika Life Spaces
Builder: Ankit Enterprises
Ankit Enterprises has 2 registrations on MahaRERA, including Centria and Centria R Building - Casa. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Centria R Building - Casa shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Centria R Building - Casa is delayed beyond 29 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Centria R Building - Casa?
The registered promoter entity is Ankit Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Centria R Building - Casa?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Centria R Building - Casa?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Centria R Building - Casa?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Centria R Building - Casa?
The professionals named in the filing: Architect: Reza Kabul Architects Pvt Ltd; Engineer: Nandlal Bhole; Chartered Accountant: CA Nikita Bajaj; Chartered Accountant: VIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Centria R Building - Casa?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback