CENTRAL PARK

By SHREE GANESH ENTERPRISES

RG-MH-37050 · RERA P51800013355 · Last updated on MahaRERA portal: 21 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 2 complaints at MahaRERA
  • Completion date moved by 72 months
  • 4 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
10 of 11Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
2Complaints at MahaRERAon this registration
Jump to the 50 documents Report an error

CENTRAL PARK is a Mixed project by SHREE GANESH ENTERPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800013355 on 26 Sep 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 72 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameCENTRAL PARK
  • TypeMixed
  • Location
    • SHELL COLONY ROAD
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800013355
  • ReraGenie IDRG-MH-37050

Builder

  • NameSHREE GANESH ENTERPRISES
  • Entity typePartnership
  • PartnerPARESH DHANSUKLAL GANDHI
  • Other registrations13 more →
  • Completed2 of 14
  • No longer live4 lapsed, de-registered or revoked
  • Past their filed date3
  • Declared earlier projects1 →

Key dates

10 months past promisethis monthRegisteredSep 2017First promiseDec 2019Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on26 Sep 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed50 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CENTRAL PARKNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

CENTRAL PARK91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 21 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed49

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots49
Closed/Covered49

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,542 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityGreater Mumbai/MHADA
Permissible FSI5432.8
Proposed, not sanctioned5,433 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTULSIANI CHAMBERS, NARIMAN POINT

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPREETI KASHYAP BARAI
EngineerARUN TENDULKAR
Chartered AccountantCHIMPU LAPSIWALA LAPSIWALA
PartnerRole in project
SHREE GANESH ENTERPRISES-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800010872Dec 2019 → Dec 2023

Reason as filed by the promoterKindly refer MHADA ORDER NO. CO/MB/REE/NOC/F-22/1419/2021 DATED 02-07-2021 PROVIDES EXTENSION FOR A PERIOD OF 30 MONTHS.

EXT51800005876Dec 2019 → Dec 2020

Reason as filed by the promoterProperty is under litigation with supreme court and we still not received final order, however we received order from high court to direct BMC to handle the matter as mentioned in order attached. As here we can not input 3 years from recent date of completion, we select the date 30/12/2020 as a date of completion.

EXT51800018843Dec 2019 → Dec 2024

Reason as filed by the promoterThe project was approved for G+15 floors.cc was issued upto 11th floor & structure was constructed without finishing upto 11th floors. further cc was restricted due to encroachment as stalls were constructed by MCGM. Ultimately after legal proceedings MCGM removed the encroachment in march 2019. After that covid started full CCwas issued in March 2022 by MHADA. Now 90% of the building work including finishing works is ready. we require Six months time to complete the entire work & further 3 months time to obtain O.C so we request you to grant us further 12 months extension i.e. upto 31/12/2024

EXT51800028044Dec 2019 → Dec 2025

Reason as filed by the promoterThe construction work of our Project is 100% completed in Feb 2025.We have already applied for O.C to MHADA and MHADA has granted the O.C. consent letter on dt.4/2/2025. Now the final O.C. process is in progress. We require the Extension to sell our balance 14 Units and to upload the copy of O.C once it is granted by MHADA. We request you to kindly consider the same.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000251406DILIPKUMAR AHUJASHREE GANESH ENTERPRISES16/06/2022
CC12601965Mahesh Raghavan MenonSHREE GANESH ENTERPRISES03/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed50

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Home Buyer /Allottee Grievance Redressal CellFile: REPLY LETTER.pdf21 Jul 2025
Declaration in FORM BFile: 7 FORM B DECLARATION.pdf6 May 2025
Disclosure of sold/ booked inventoryFile: 8 SOLD-UNSOLD.pdf6 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 6 FORM- 2A ENGINEER CERTIFICATE QUALITY ASSURANCE.pdf6 May 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES LEGAL.pdf2 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - Central Colony MAR 2025.pdf2 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf2 Apr 2025
CERSAI detailsFile: CERSAI.pdf2 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: DESIGNATED BANK ACCOUNT.pdf2 Apr 2025
Deviation Report with respect to Allotment letterFile: NO DEVIATION IN ALLOTMENT LETTER.pdf2 Apr 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCES LEGAL.pdf2 Apr 2025
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION MODEL COPY AGREEMENT.pdf2 Apr 2025
Proforma of Agreement for saleFile: Draft Agreement Sale.pdf2 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST.pdf2 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf6 Mar 2025
Home Buyer /Allottee Grievance Redressal CellFile: Submissions on behalf of the Respondent (1).pdf23 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf21 Feb 2024
Declaration in FORM BFile: FORM B.pdf8 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architecht Certeficate (Rera).pdf29 Jan 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf17 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate Fy 2022-2023.pdf12 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate new_.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Certificate Fy 2021-2022.pdf31 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf31 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 MAHA RERA.pdf5 Apr 2022
Disclosure of sold/ booked inventoryFile: 2 Sold Unsold Inventory.pdf25 Mar 2022
Disclosure of sold/ booked inventoryFile: Sold Allotted Inventory.pdf5 Mar 2022
Declaration about Commencement CertificateFile: 5 COMMENCEMENT CERTIFICATE FORM D.pdf11 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 3 ENGINEER CERTIFICATE 2A Year 2019-20.pdf11 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 4 ENGINEER CERTIFICATE 2A Year 2020-21.pdf11 Feb 2022
Disclosure of sold/ booked inventoryFile: 4 Sold Alloted Inventory.pdf11 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 MAHARERA 2018-19.pdf1 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 MAHARERA 2019-20.PDF1 Apr 2021
Certificates of CA (Form 5)File: FORM 5 MAHARERA 2018-19.pdf30 Sep 2019
Certificates of CA (Form 5)File: FORM 5 MAHARERA SGC.pdf21 May 2019
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf19 Dec 2018
Building plan approval or NA orderFile: IOD-1.pdf16 Aug 2017
Layout approvalFile: Approved building plan.pdf16 Aug 2017
PAN CardFile: PAN CARD.pdf16 Aug 2017
Copy of the legal title reportFile: Title Certificate (Central).pdf16 Aug 2017
Details of encumbrancesFile: commencement certificate.pdf16 Aug 2017
Copy of Layout Approval (in case of layout)File: Approved building plan.pdf16 Aug 2017
Building Plan Approval (IOD)File: IOD-1.pdf16 Aug 2017
Declaration in FORM BFile: form B.pdf16 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: barai Certificate.pdf16 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf16 Aug 2017
Certificates of CA (Form 3)File: FORM-3 CA CERTIFICATION NEW.pdf16 Aug 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER PLUS AGREEMENT FOR SALE.pdf16 Aug 2017
OtherFile: Request to RERA.pdf16 Aug 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 72 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CENTRAL PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmCENTRAL PARKCompleted 139Lapsed / revoked 110Other 134Dot size: filed unitsN

Filed coordinates, straight-line distance. 383 registered projects within 2 km.

Builder: SHREE GANESH ENTERPRISES

SHREE GANESH ENTERPRISES has 14 registrations on MahaRERA, including SIDDHI VINAYAK and CENTRAL PARK. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that CENTRAL PARK shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if CENTRAL PARK is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CENTRAL PARK?

The registered promoter entity is SHREE GANESH ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CENTRAL PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against CENTRAL PARK?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for CENTRAL PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CENTRAL PARK?

The professionals named in the filing: Architect: PREETI KASHYAP BARAI; Engineer: ARUN TENDULKAR; Chartered Accountant: CHIMPU LAPSIWALA LAPSIWALA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CENTRAL PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CENTRAL PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CENTRAL PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.