Home / Browse projects / Mumbai Suburban, Maharashtra / CENTRAL PARK
CENTRAL PARK
RG-MH-37050 · RERA P51800013355 · Last updated on MahaRERA portal: 21 Jul 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 2 complaints at MahaRERA
- Completion date moved by 72 months
- 4 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CENTRAL PARK is a Mixed project by SHREE GANESH ENTERPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800013355 on 26 Sep 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 72 months from the original filing. 2 complaints are on record with the regulator.
At a glance
Project
- NameCENTRAL PARK
- TypeMixed
- Location
- SHELL COLONY ROAD
- Kurla
- Mumbai Suburban
- 400071
- Pincode400071
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800013355
- ReraGenie IDRG-MH-37050
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on26 Sep 2017
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2019)
- Buildings1 building record
- Documents filed50 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CENTRAL PARK | NA | 18 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 21 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
CENTRAL PARK91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
NA Plot Without StructureNot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 21 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed49
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PREETI KASHYAP BARAI |
| Engineer | ARUN TENDULKAR |
| Chartered Accountant | CHIMPU LAPSIWALA LAPSIWALA |
| Partner | Role in project |
|---|---|
| SHREE GANESH ENTERPRISES | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterKindly refer MHADA ORDER NO. CO/MB/REE/NOC/F-22/1419/2021 DATED 02-07-2021 PROVIDES EXTENSION FOR A PERIOD OF 30 MONTHS.
Reason as filed by the promoterProperty is under litigation with supreme court and we still not received final order, however we received order from high court to direct BMC to handle the matter as mentioned in order attached. As here we can not input 3 years from recent date of completion, we select the date 30/12/2020 as a date of completion.
Reason as filed by the promoterThe project was approved for G+15 floors.cc was issued upto 11th floor & structure was constructed without finishing upto 11th floors. further cc was restricted due to encroachment as stalls were constructed by MCGM. Ultimately after legal proceedings MCGM removed the encroachment in march 2019. After that covid started full CCwas issued in March 2022 by MHADA. Now 90% of the building work including finishing works is ready. we require Six months time to complete the entire work & further 3 months time to obtain O.C so we request you to grant us further 12 months extension i.e. upto 31/12/2024
Reason as filed by the promoterThe construction work of our Project is 100% completed in Feb 2025.We have already applied for O.C to MHADA and MHADA has granted the O.C. consent letter on dt.4/2/2025. Now the final O.C. process is in progress. We require the Extension to sell our balance 14 Units and to upload the copy of O.C once it is granted by MHADA. We request you to kindly consider the same.
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000251406 | DILIPKUMAR AHUJA | SHREE GANESH ENTERPRISES | 16/06/2022 |
| CC12601965 | Mahesh Raghavan Menon | SHREE GANESH ENTERPRISES | 03/04/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Aug 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed50
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Home Buyer /Allottee Grievance Redressal CellFile: REPLY LETTER.pdf | 21 Jul 2025 |
| Declaration in FORM BFile: 7 FORM B DECLARATION.pdf | 6 May 2025 |
| Disclosure of sold/ booked inventoryFile: 8 SOLD-UNSOLD.pdf | 6 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 6 FORM- 2A ENGINEER CERTIFICATE QUALITY ASSURANCE.pdf | 6 May 2025 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCES LEGAL.pdf | 2 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - Central Colony MAR 2025.pdf | 2 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 2 Apr 2025 |
| CERSAI detailsFile: CERSAI.pdf | 2 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: DESIGNATED BANK ACCOUNT.pdf | 2 Apr 2025 |
| Deviation Report with respect to Allotment letterFile: NO DEVIATION IN ALLOTMENT LETTER.pdf | 2 Apr 2025 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCES LEGAL.pdf | 2 Apr 2025 |
| Deviation Report with respect to model copy of AgreementFile: NO DEVIATION MODEL COPY AGREEMENT.pdf | 2 Apr 2025 |
| Proforma of Agreement for saleFile: Draft Agreement Sale.pdf | 2 Apr 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST.pdf | 2 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf | 6 Mar 2025 |
| Home Buyer /Allottee Grievance Redressal CellFile: Submissions on behalf of the Respondent (1).pdf | 23 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf | 21 Feb 2024 |
| Declaration in FORM BFile: FORM B.pdf | 8 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architecht Certeficate (Rera).pdf | 29 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 17 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate Fy 2022-2023.pdf | 12 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate new_.pdf | 20 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 20 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Certificate Fy 2021-2022.pdf | 31 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf | 31 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 MAHA RERA.pdf | 5 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: 2 Sold Unsold Inventory.pdf | 25 Mar 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Allotted Inventory.pdf | 5 Mar 2022 |
| Declaration about Commencement CertificateFile: 5 COMMENCEMENT CERTIFICATE FORM D.pdf | 11 Feb 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 3 ENGINEER CERTIFICATE 2A Year 2019-20.pdf | 11 Feb 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 4 ENGINEER CERTIFICATE 2A Year 2020-21.pdf | 11 Feb 2022 |
| Disclosure of sold/ booked inventoryFile: 4 Sold Alloted Inventory.pdf | 11 Feb 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 MAHARERA 2018-19.pdf | 1 Apr 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 MAHARERA 2019-20.PDF | 1 Apr 2021 |
| Certificates of CA (Form 5)File: FORM 5 MAHARERA 2018-19.pdf | 30 Sep 2019 |
| Certificates of CA (Form 5)File: FORM 5 MAHARERA SGC.pdf | 21 May 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf | 19 Dec 2018 |
| Building plan approval or NA orderFile: IOD-1.pdf | 16 Aug 2017 |
| Layout approvalFile: Approved building plan.pdf | 16 Aug 2017 |
| PAN CardFile: PAN CARD.pdf | 16 Aug 2017 |
| Copy of the legal title reportFile: Title Certificate (Central).pdf | 16 Aug 2017 |
| Details of encumbrancesFile: commencement certificate.pdf | 16 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: Approved building plan.pdf | 16 Aug 2017 |
| Building Plan Approval (IOD)File: IOD-1.pdf | 16 Aug 2017 |
| Declaration in FORM BFile: form B.pdf | 16 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: barai Certificate.pdf | 16 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 16 Aug 2017 |
| Certificates of CA (Form 3)File: FORM-3 CA CERTIFICATION NEW.pdf | 16 Aug 2017 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER PLUS AGREEMENT FOR SALE.pdf | 16 Aug 2017 |
| OtherFile: Request to RERA.pdf | 16 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 13 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 50 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep CENTRAL PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kurla6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 383 registered projects within 2 km.
Hiranandani Maitri Park Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Premiere by Panache
Panache Developers Pvt Ltd.
Sai Shrushti
Shree Sai Realtors
MASS METROPOLIS
GRACE URBAN DEVELOPMENT CORPORATION
ELEVIA
VIDA INFRAHUB LLP
PODDAR HARMONY
PODDAR CREATORS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: SHREE GANESH ENTERPRISES
SHREE GANESH ENTERPRISES has 14 registrations on MahaRERA, including SIDDHI VINAYAK and CENTRAL PARK. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that CENTRAL PARK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if CENTRAL PARK is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CENTRAL PARK?
The registered promoter entity is SHREE GANESH ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CENTRAL PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against CENTRAL PARK?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for CENTRAL PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CENTRAL PARK?
The professionals named in the filing: Architect: PREETI KASHYAP BARAI; Engineer: ARUN TENDULKAR; Chartered Accountant: CHIMPU LAPSIWALA LAPSIWALA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CENTRAL PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback