Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

CASA GRANDE B WING is a Residential / Group Housing project by DOLPHIN BUILDCON in Pune, Maharashtra, registered with MahaRERA as P52100005682 on 11 Aug 2017. The registration is recorded completed; possession was promised by 29 Dec 2022. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameCASA GRANDE B WING
  • TypeResidential / Group Housing
  • Location
    • RAVET BRT ROAD
    • RAVET
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100005682
  • ReraGenie IDRG-MH-20675

Builder

  • NameDOLPHIN BUILDCON
  • Entity typePartnership
  • PartnersANAND SUBHASHCHANDRA GOYAL, DILIP SATAYANARAYAN GUPTA, PREMPRAKASH RAMESHWARDAS AGARWAL, SWAPNIL BANSILAL GARG, UMESH SURESH PARASWAR, UDAY SURESH PARASWAR, ALOK ARUN SHETH, MUKESH JAIBHAGWAN GUPTA, NIRAJ NITIN TALATHI, URMILA PANDURANG PALLEWAR, VIKAS KUNDANMAL MANDLECHA, KALPESH JAIRAJ DOSHI and 6 more
  • Other registrations3 more →
  • Completed1 of 4
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseJun 2021Revised toDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Aug 2017
  • Promised completion29 Dec 2022
  • Revised completionRevised to 29 Dec 2022 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed76 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CASA GRANDE B WINGNA210000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

CASA GRANDE B WING: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 1 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed126

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots126
Closed/Covered80
Open Space46

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,547 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
KHANDU EKNATH BHONDVEPimpri Chinchawad (M Corp.)Pune
ATISH KHANDU BHONDVEPimpri Chinchawad (M Corp.)Pune
ASHIRWAD KHANDU BHONDVEPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI8858.0
Proposed, not sanctioned8,858 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNIGDI PRADHIKARAN

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSWAPNIL SHETH
EngineerG A BHILARE
Chartered AccountantNavdeep Jindal
PartnerRole in project
DOLPHIN BUILDCON-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100009981Jun 2021 → Jun 2022

Reason as filed by the promoterDUE TO SCARCITY OF LABOUR,MATERIAL ,TRANSPORT DURING LOCKDOWN 1 AND 2,THE ENTIRE WORK OF THE SITE CAME TO STAND STILL. We are applying for first time extension. Hence in our case consent of allottees is not required.

Litigation declared3

CaseCourtStatus
RCS 0000089/2010C J J D AND JMFC PIMPRI CHINCHWADISSUES
474 /2016/2016C J S D PUNEEXH FIVE PARTLY ALLOWED AGAINST SILVER STAR GROUP
164/2015/2015DISTRICT JUDGE PUNENOTICE UNREADY

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 May 2024

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Casa Grande B building OCCUPANCY CERTIFICATE.pdf1 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Uploaded.pdf1 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Dolphin Buildcon_ Form - 5.pdf12 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCCUPANCY CERTIFICATE.pdf23 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: DOLPHIN BUILDCON.pdf4 Feb 2023
Certificates of CA (Form 3)File: CERTIFICATE.pdf8 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Dolphin Buildcon Form 5.pdf17 Mar 2022
Layout approvalFile: Layout Plan.pdf14 Sep 2021
Building plan approvalFile: MYSCAN_20210914_0009.pdf14 Sep 2021
Building plan approvalFile: MYSCAN_20210914_0008.pdf14 Sep 2021
Building plan approvalFile: MYSCAN_20210914_0007.pdf14 Sep 2021
Building plan approvalFile: MYSCAN_20210914_0006.pdf14 Sep 2021
Building plan approvalFile: MYSCAN_20210914_0005.pdf14 Sep 2021
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf14 Sep 2021
Building Plan Approval (IOD)File: MYSCAN_20210914_0009.pdf14 Sep 2021
Building Plan Approval (IOD)File: MYSCAN_20210914_0008.pdf14 Sep 2021
Building Plan Approval (IOD)File: MYSCAN_20210914_0007.pdf14 Sep 2021
Building Plan Approval (IOD)File: MYSCAN_20210914_0006.pdf14 Sep 2021
Building Plan Approval (IOD)File: MYSCAN_20210914_0005.pdf14 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf14 Sep 2021
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTI F1CATE.pdf14 Sep 2021
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLDUNSOLD INVENTORY.pdf14 Sep 2021
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf26 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FY19-20.pdf26 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FY20-21.pdf26 Jul 2021
Disclosure of sold/ booked inventoryFile: Disclosure of sold-unsold Inventory (1).pdf26 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: MS DOLPHIN BUILDCON.pdf15 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 08 Dolphin Buildcon.pdf30 Dec 2019
OtherFile: img277.pdf29 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 53 Arct Letter 5-4-2019 -1.pdf18 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 52 Arct Letter 2-7-2019 -1.pdf18 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 54 Engineer's Certificate 15-4-2019 -1.pdf18 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 55 Engineer's Certificate 5-7-2019 -1.pdf18 Jul 2019
Certificates of CA (Form 3)File: 50 CA Certificate 10-4-2019-1.pdf18 Jul 2019
Certificates of CA (Form 3)File: 51 CA Certificate 3-7-2019-1.pdf18 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate_compressed.pdf9 Mar 2019
Layout approvalFile: MYSCAN_20190221_103-ilovepdf-compressed (1).pdf23 Feb 2019
Building plan approvalFile: MYSCAN_20190221_102-ilovepdf-compressed.pdf23 Feb 2019
Copy of Layout Approval (in case of layout)File: MYSCAN_20190221_103-ilovepdf-compressed (1).pdf23 Feb 2019
Building Plan Approval (IOD)File: MYSCAN_20190221_102-ilovepdf-compressed.pdf23 Feb 2019
Building plan approvalFile: bldng height.PDF22 Feb 2019
Building plan approvalFile: bldng height.PDF22 Feb 2019
Building plan approvalFile: even floors.PDF22 Feb 2019
Building plan approvalFile: odd floors (1).pdf22 Feb 2019
Building Plan Approval (IOD)File: bldng height.PDF22 Feb 2019
Building Plan Approval (IOD)File: bldng height.PDF22 Feb 2019
Building Plan Approval (IOD)File: even floors.PDF22 Feb 2019
Building Plan Approval (IOD)File: odd floors (1).pdf22 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: commencement.pdf22 Feb 2019
Certificates of CA (Form 3)File: signed form 3 feb (1).pdf22 Feb 2019
Certificates of CA (Form 5)File: Dolphin Buildcon (1).pdf30 Sep 2018
PAN CardFile: Pancard_Dolphin Buildcon.pdf31 Jul 2017
Details of encumbrancesFile: en certificate.pdf31 Jul 2017
Declaration in FORM BFile: B form.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1architech certificate.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engieering certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: FORM 3-DOLPHIN BUILDOCN (1).pdf31 Jul 2017
Proforma of Allotment letterFile: allotment letter encls balcony.pdf31 Jul 2017
Layout approvalFile: LAYOUT DRAWING.pdf30 Jul 2017
Building plan approvalFile: PARKING FLOOR.pdf30 Jul 2017
Building plan approvalFile: B- BUILDING ELEVATION DRAWING.pdf30 Jul 2017
Building plan approvalFile: B- BUILDING ENTRANCE FLOOR PLAN.pdf30 Jul 2017
Building plan approvalFile: B- BUILDING SECTION DRAWING.pdf30 Jul 2017
Building plan approvalFile: FLOOR PLAN 1,3,5,7,9.pdf30 Jul 2017
Building plan approvalFile: FLOOR PLAN 2,4,6,8,10.pdf30 Jul 2017
Copy of the legal title reportFile: TITILE SEARCH REPORT.pdf30 Jul 2017
Copy of the legal title reportFile: SUPPLEMENTARY SEARCH REPORT.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT DRAWING.pdf30 Jul 2017
Building Plan Approval (IOD)File: B- BUILDING ELEVATION DRAWING.pdf30 Jul 2017
Building Plan Approval (IOD)File: B- BUILDING ENTRANCE FLOOR PLAN.pdf30 Jul 2017
Building Plan Approval (IOD)File: B- BUILDING SECTION DRAWING.pdf30 Jul 2017
Building Plan Approval (IOD)File: FLOOR PLAN 1,3,5,7,9.pdf30 Jul 2017
Building Plan Approval (IOD)File: FLOOR PLAN 2,4,6,8,10.pdf30 Jul 2017
Building Plan Approval (IOD)File: PARKING FLOOR.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement_Dolphin Buildcon.pdf30 Jul 2017
Proforma of Allotment letterFile: dolphine agreement.pdf30 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CASA GRANDE B WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAVET13,700+ in Pune

2 kmCASA GRANDE B WINGCompleted 117Lapsed / revoked 53Other 116Dot size: filed unitsN

Filed coordinates, straight-line distance. 286 registered projects within 2 km.

Builder: DOLPHIN BUILDCON

DOLPHIN BUILDCON has 4 registrations on MahaRERA, including CASA GRANDE B WING and THE UNICORN BUILDING C WING C1 & C2. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if CASA GRANDE B WING is delayed beyond 29 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CASA GRANDE B WING?

The registered promoter entity is DOLPHIN BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CASA GRANDE B WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CASA GRANDE B WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CASA GRANDE B WING?

The professionals named in the filing: Architect: SWAPNIL SHETH; Engineer: G A BHILARE; Chartered Accountant: Navdeep Jindal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CASA GRANDE B WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CASA GRANDE B WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CASA GRANDE B WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.