Completed No litigation declared Plotted project

Cape of Bliss Phase I

By Lodha Management LLP

RG-MH-63818 · RERA P52800049714 · Last updated on MahaRERA portal: 29 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
42 of 152Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Cape of Bliss Phase I is a Plotted project by Lodha Management LLP in Ratnagiri, Maharashtra, registered with MahaRERA as P52800049714 on 22 Feb 2023. The registration is recorded completed; possession was promised by 30 Dec 2025. 110 of the 152 units on this registration are recorded sold or booked.

At a glance

Project

  • NameCape of Bliss Phase I
  • TypePlotted
  • Location
    • Dapoli
    • Kolthare
    • Ratnagiri
    • 415712
  • Pincode415712
  • RERA no.P52800049714
  • ReraGenie IDRG-MH-63818

Builder

  • NameLodha Management LLP
  • Entity typePartnership
  • CINU70200MH2025PTC458960
  • LLPINAAA-6497
  • CIN and LLPIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • PartnersSamujjwal Ghosh, Rakesh Gupta
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects5 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Feb 2023
  • Promised completion30 Dec 2025
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed71 files

Current status

72%110 of 152 units booked

Figures as on 29 Sep 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities16

As on 29 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes85%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes75%
Street LightingYes80%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceYes90%
Open ParkingNoNot applicable
Compound Wall DemarcationYes85%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area38,300 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Sep 2024

Approvals and building plan

Sanctioning authorityNagar Rachana and Mulya Nirdharan Vibhag, Ratnagiri
Permissible FSI24653.0
Proposed, not sanctioned23,653 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMazgaon

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTansika Misal
ArchitectBhalachandra Gothankar
EngineerDinesh Balkrishna Satam
Chartered AccountantChirag Sarvaiya
Chartered AccountantU S MISHRA AND ASSOCIATES
PartnerRole in project
HOABL Management Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Mar 2025

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5_COB 1_signed.pdf29 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: COB 1 - Architect Certificate.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Cape of Bliss Phase I-P52800049714-CA certificate.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: COB 1 - Engineer Certificate.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf19 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate_COB 1_17-01-2025.pdf9 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_COB 1.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_LM LLP PH1.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_COB1.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Cape of Bliss I-.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_Cape of bliss I.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_LM LLP-Cape of Bilss I.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_COB I.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Cape of Bliss I_signed.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 8 COB Phase 1_Form 5_promoter signed.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Cape of Bliss Phase I - Architect certificate-signed.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Cape of Bliss Phase I - Engineer certificate_signed.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Cape of Bliss Phase I.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Cape of Bliss Phase I - CA certificate.pdf20 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: Lodha Management LLP.pdf5 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_COB 1_signed.pdf27 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Cape of Bliss Phase I.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_COB 1.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_COB 1.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Cape of Bliss Phase I.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LMLLP_P1.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_COB-1_signed.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CoB 1.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: COB Phase 1.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_COB1.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5_COB_ 1.pdf1 Oct 2023
Copy of the legal title reportFile: TITLE REPORT_compressed.pdf11 Sep 2023
Disclosure of sold/ booked inventoryFile: Sold unsold_Cape of Bliss Phase I.pdf11 Sep 2023
Layout approvalFile: Phase 1CoB_compressed.pdf8 Sep 2023
Copy of Layout Approval (in case of layout)File: Phase 1CoB_compressed.pdf8 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Phase -1 N AOrder.pdf8 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate COB P1.pdf6 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_COB Phase 1.pdf6 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LM LLP P1 Form 3_SIG_compressed.pdf6 Sep 2023
Proforma of Agreement for saleFile: Final Draft AFS - COB Phase 1 - RERA.pdf27 Jun 2023
Deviation Report with respect to model copy of AgreementFile: Final Deviation Report - COB Phase 1 - RERA.pdf27 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: T-1 Tahsildar Letter.pdf14 Feb 2023
Proforma of Allotment letterFile: Allotment Letter-Phase I_legal_signed.pdf14 Feb 2023
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter-Phase I_legal_signed.pdf14 Feb 2023
Other - TechnicalFile: 1.pdf14 Feb 2023
Other - TechnicalFile: 2.pdf14 Feb 2023
Other - TechnicalFile: 3.pdf14 Feb 2023
Other - TechnicalFile: 4.pdf14 Feb 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout)_rotated.pdf13 Feb 2023
Building plan approval or NA orderFile: 1 Copy of Layout Approval (in case of layout)_rotated.pdf13 Feb 2023
Copy of the legal title reportFile: Title Report.pdf13 Feb 2023
Copy of the legal title reportFile: Rera Title report kolthare 39(1 3 4)_compressed.pdf13 Feb 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout)_rotated.pdf13 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Copy of Layout Approval (in case of layout)_rotated.pdf13 Feb 2023
Declaration about Commencement CertificateFile: Form D.pdf13 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LM LLP P1 Form 3.pdf13 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: GetUserDocumentFileContent.pdf13 Feb 2023
PAN CardFile: PAN Card.pdf8 Feb 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance-Phase I_signed.pdf8 Feb 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal-Phase I_signed.pdf8 Feb 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance-Phase I_signed.pdf8 Feb 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal-Phase I_signed.pdf8 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: P1 TP Order 39-1.pdf8 Feb 2023
Declaration in FORM BFile: Form B.pdf8 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_200259884486_For_Asset_Based_Search_08_02_2023_17_45_01_656.pdf8 Feb 2023
Proforma of Agreement for saleFile: Cape of Bliss Phase I - AFS - RERA Format.pdf8 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for Separate Bank Account-Phase I_signed.pdf8 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with Agreement_signed.pdf8 Feb 2023

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise2 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Waves of BlissP52800053247Kolthare, Ratnagiri22Oct 2023OngoingDec 2025Not delivered
Cape of Bliss Phase 1AP52800052438Ratnagiri, Ratnagiri385Aug 2023OngoingDec 2025Not delivered
Isle of Bliss Phase IIIP52800049974Ratnagiri, Ratnagiri64Mar 2023CompletedDec 2024Dec 2024
Isle of Bliss Phase IIP52800050299Ratnagiri, Ratnagiri49Apr 2023CompletedDec 2024Dec 2024

How this compares with Ratnagiri

72%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep Cape of Bliss Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kolthare1,100+ in Ratnagiri

Builder: Lodha Management LLP

Lodha Management LLP has 3 registrations on MahaRERA, including Cape of Bliss Phase I and Isle of Bliss Phase III. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if Cape of Bliss Phase I is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Cape of Bliss Phase I?

The registered promoter entity is Lodha Management LLP, a partnership as per the filing. Its CIN U70200MH2025PTC458960 and LLPIN AAA-6497 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Cape of Bliss Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Cape of Bliss Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Cape of Bliss Phase I?

The professionals named in the filing: Architect: Tansika Misal; Architect: Bhalachandra Gothankar; Engineer: Dinesh Balkrishna Satam; Chartered Accountant: Chirag Sarvaiya; Chartered Accountant: U S MISHRA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Cape of Bliss Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Cape of Bliss Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Cape of Bliss Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.