Cape of Bliss 1B

By HOABL Management Private Limited

RG-MH-86688 · RERA P52800080952 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
138 of 140Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Cape of Bliss 1B is a Plotted project by HOABL Management Private Limited in Ratnagiri, Maharashtra, registered with MahaRERA as P52800080952 on 28 Aug 2025. Possession is promised by 31 Dec 2026. 2 of the 140 units on this registration are recorded sold or booked.

At a glance

Project

  • NameCape of Bliss 1B
  • TypePlotted
  • Location
    • Gomrai Marg
    • Kolthare
    • Dapoli
    • Ratnagiri
    • 415712
  • Pincode415712
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800080952
  • ReraGenie IDRG-MH-86688

Builder

  • NameHOABL Management Private Limited
  • Entity typeCompany
  • CINU70200MH2025PTC458960
  • LLPINAAA-6497
  • PartnersSamujjwal Ghosh, Rakesh Gupta
  • Declared earlier projects5 →

Key dates

this monthRegisteredAug 2025PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Aug 2025
  • Promised completion31 Dec 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed81 files

Current status

1%2 of 140 units booked
42.3%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes18%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes18%
Street LightingYes20%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes15%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area44,100 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Sep 2025

Approvals and building plan

Sanctioning authorityAdditional District Town Planning, Ratnagiri
Permissible FSI26172.0
Proposed, not sanctioned26,172 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shirin Manzil CoOp Hsg. Soc., Shop No. 3 To 7, 18/24 St Marry Road, Mazgaon, Mumbai.400010
Estimated costRs 5.46 cr
Cost incurredRs 2.31 cr
Work done42.26%
BuildingWingEstimatedIncurred
-NARs 5.46 crRs 2.31 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBhalchandra Gothankar
EngineerDinesh Balkrishna Satam
Chartered AccountantCA Udal Sarda Mishra
Chartered AccountantMahadev Sawant & Co
PartnerRole in project
HOABL Management Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Feb 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Aug 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Signed_Form 2A_Cape of Bliss Phase 1B.pdf29 Jun 2026
Withdrawal Update Form 1File: Architect Certificate_COB 1B_signed.pdf20 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate_COB 1B_signed.pdf20 Apr 2026
Withdrawal Update Form 3File: CA Certificate_COB 1B_signed.pdf20 Apr 2026
Withdrawal Update Form 1File: COB-1B - Architect Certificate.pdf20 Jan 2026
Withdrawal Update Form 2File: COB-1B - Engineer Certificate.pdf20 Jan 2026
Withdrawal Update Form 3File: COB-1B - CA Certificate.pdf20 Jan 2026
Withdrawal Update Form 1File: Architect Certificate_Cape of Bliss 1B.pdf19 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate_COB 1B.pdf19 Oct 2025
Withdrawal Update Form 3File: CA Certificate_COB-1B.pdf19 Oct 2025
Other - LegalFile: Clarification letter - COB 1B_Plot area clarification-signed.pdf25 Aug 2025
Other - LegalFile: Clarification Letter with Highlighted Govt Issued Plan.pdf25 Aug 2025
Other - FinanceFile: Clarification letter - COB 1B_Plot area clarification-signed.pdf25 Aug 2025
Layout approvalFile: Kolthare, Dapoli - Govt Issued Plan_highlighted.pdf22 Aug 2025
Layout approvalFile: Clarification Letter with Highlighted Govt Issued Plan.pdf22 Aug 2025
Building plan approval or NA orderFile: Kolthare, Dapoli - Govt Issued Plan_highlighted.pdf22 Aug 2025
Building plan approval or NA orderFile: Clarification Letter with Highlighted Govt Issued Plan.pdf22 Aug 2025
Copy of Layout Approval (in case of layout)File: Clarification Letter with Highlighted Govt Issued Plan.pdf22 Aug 2025
Copy of Layout Approval (in case of layout)File: Kolthare, Dapoli - Govt Issued Plan_highlighted.pdf22 Aug 2025
Building Plan Approval / NA Order for plotted developmentFile: Kolthare, Dapoli - Govt Issued Plan_highlighted.pdf22 Aug 2025
Building Plan Approval / NA Order for plotted developmentFile: Clarification Letter with Highlighted Govt Issued Plan.pdf22 Aug 2025
Layout approvalFile: KOLTHARE 94 7 8 10 11 12 FINAL ORDER DRAWING (3).pdf6 Aug 2025
Layout approvalFile: LAYOUT APPROVAL DRAWING S NO 94 HISSA NO 2 AND 9 2.pdf6 Aug 2025
Building plan approval or NA orderFile: KOLTHARE 94 7 8 10 11 12 FINAL ORDER DRAWING (3).pdf6 Aug 2025
Building plan approval or NA orderFile: LAYOUT APPROVAL DRAWING S NO 94 HISSA NO 2 AND 9 2.pdf6 Aug 2025
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL DRAWING S NO 94 HISSA NO 2 AND 9 2.pdf6 Aug 2025
Copy of Layout Approval (in case of layout)File: KOLTHARE 94 7 8 10 11 12 FINAL ORDER DRAWING (3).pdf6 Aug 2025
Commencement Certificates / NA Order for plotted developmentFile: COB 1B Physical NA Order.pdf6 Aug 2025
Commencement Certificates / NA Order for plotted developmentFile: Clarification Letter regarding name of promoter.pdf6 Aug 2025
Commencement Certificates / NA Order for plotted developmentFile: NA Order COB 1B 94-7,8,9,10,11,12.pdf6 Aug 2025
Building Plan Approval / NA Order for plotted developmentFile: KOLTHARE 94 7 8 10 11 12 FINAL ORDER DRAWING (3).pdf6 Aug 2025
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT APPROVAL DRAWING S NO 94 HISSA NO 2 AND 9 2.pdf6 Aug 2025
Commencement Certificates / NA Order for plotted developmentFile: 2 Commencement Certificates _ NA Order for plotted development.pdf11 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: Final Layout Order-Consolidated.pdf11 Jul 2025
Declaration about Commencement CertificateFile: Format D.pdf11 Jul 2025
Proforma of Allotment letterFile: Allotment Letter - COB Phase 1B_signed.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3_LM LLP COB1B V3 Revised.pdf8 Mar 2025
Deviation Report with respect to Allotment letterFile: Deviation - Allotment.pdf8 Mar 2025
Deviation Report with respect to model copy of AgreementFile: Deviation - AFS (1).pdf8 Mar 2025
Proforma of Agreement for saleFile: Final Draft - RERA AFS - COB Phase 1B_Final.pdf8 Mar 2025
Other - LegalFile: One Plot one registration_Final 27022025.pdf27 Feb 2025
Other - TechnicalFile: One Plot one registration_Final 27022025.pdf27 Feb 2025
Copy of the legal title reportFile: Dapoli_COB 1B_Rera Title Report(Signed Copy).pdf25 Feb 2025
Other - LegalFile: Clarification Letter-revised.pdf24 Feb 2025
Other - FinanceFile: Clarification Letter-revised.pdf24 Feb 2025
Other - TechnicalFile: Clarification Letter-revised.pdf24 Feb 2025
Layout approvalFile: K Patra - B-Plots.pdf23 Feb 2025
Layout approvalFile: K Patra - C-Plots.pdf23 Feb 2025
Building plan approval or NA orderFile: K Patra - B-Plots.pdf23 Feb 2025
Building plan approval or NA orderFile: K Patra - C-Plots.pdf23 Feb 2025
Copy of Layout Approval (in case of layout)File: K Patra - C-Plots.pdf23 Feb 2025
Copy of Layout Approval (in case of layout)File: K Patra - B-Plots.pdf23 Feb 2025
Declaration in FORM BFile: Form B notarised - COB 1B.pdf23 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_COB 1B.pdf23 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_COB 1B.pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: K Patra - B-Plots.pdf23 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: K Patra - C-Plots.pdf23 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_RG-signed.pdf23 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_SG_Signed.pdf23 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf23 Feb 2025
Details of encumbrances concerned to FinanceFile: No encumbrance to finance_Signed.pdf20 Feb 2025
Details of encumbrances concerned to FinanceFile: No encmumbrance to Legal_Signed.pdf20 Feb 2025
Other - LegalFile: Consolidated Seven and Twelve Extract.pdf20 Feb 2025
CERSAI detailsFile: CERSAI Report-signed.pdf20 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A_Signed.pdf20 Feb 2025
Details of encumbrances concerned to LegalFile: No encumbrance to finance_Signed.pdf20 Feb 2025
Details of encumbrances concerned to LegalFile: No encmumbrance to Legal_Signed.pdf20 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured-unsecured_Signed.pdf20 Feb 2025
PAN CardFile: PAN of Firm.pdf19 Feb 2025
Other - LegalFile: 4.pdf19 Feb 2025
Other - LegalFile: 4.pdf19 Feb 2025
Other - LegalFile: 5.pdf19 Feb 2025
Other - LegalFile: 6.pdf19 Feb 2025
Other - LegalFile: 2.pdf19 Feb 2025
Other - LegalFile: 1.pdf19 Feb 2025
Other - LegalFile: 6.pdf19 Feb 2025
Other - LegalFile: 5.pdf19 Feb 2025
Other - LegalFile: 3.pdf19 Feb 2025
Other - LegalFile: 2.pdf19 Feb 2025
Other - LegalFile: 1.pdf19 Feb 2025

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise2 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Waves of BlissP52800053247Kolthare, Ratnagiri22Oct 2023OngoingDec 2025Not delivered
Cape of Bliss Phase IP52800049714Kolthare, Ratnagiri152Feb 2023CompletedDec 2025Mar 2025
Cape of Bliss Phase 1AP52800052438Ratnagiri, Ratnagiri385Aug 2023OngoingDec 2025Not delivered
Isle of Bliss Phase IIIP52800049974Ratnagiri, Ratnagiri64Mar 2023CompletedDec 2024Dec 2024
Isle of Bliss Phase IIP52800050299Ratnagiri, Ratnagiri49Apr 2023CompletedDec 2024Dec 2024

How this compares with Ratnagiri

1%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep Cape of Bliss 1B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kolthare1,100+ in Ratnagiri

2 kmCape of Bliss 1BCompleted 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: HOABL Management Private Limited

HOABL Management Private Limited has 1 registration on MahaRERA, including Cape of Bliss 1B. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if Cape of Bliss 1B is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Cape of Bliss 1B?

The registered promoter entity is HOABL Management Private Limited, a company as per the filing. Its CIN U70200MH2025PTC458960 and LLPIN AAA-6497 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Cape of Bliss 1B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Cape of Bliss 1B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Cape of Bliss 1B?

The professionals named in the filing: Architect: Bhalchandra Gothankar; Engineer: Dinesh Balkrishna Satam; Chartered Accountant: CA Udal Sarda Mishra; Chartered Accountant: Mahadev Sawant & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Cape of Bliss 1B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Cape of Bliss 1B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Cape of Bliss 1B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.