Red flags
- Registration lapsed
- Possession 22 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 65 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BUILDING NO.1, IDEAL GARDEN, TYPE B1b, WING B is a Residential / Group Housing project by RAJKUMAR RAMSHIROMANI VISHWAKARMA in Palghar, Maharashtra, registered with MahaRERA as P99000016031 on 12 Apr 2018. Possession was promised by 31 Dec 2024 and is now 22 months past that date. The completion date has moved by 65 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameBUILDING NO.1, IDEAL GARDEN, TYPE B1b, WING B
- TypeResidential / Group Housing
- Location
- UMROLI
- Palghar
- 401404
- Pincode401404
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000016031
- ReraGenie IDRG-MH-85970
Builder
- NameRAJKUMAR RAMSHIROMANI VISHWAKARMA
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on12 Apr 2018
- Promised completion31 Dec 2024
- Revised completionRevised to 31 Dec 2024 (originally 31 Jul 2019)
- Buildings1 building record
- Documents filed40 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING 1 WING B TYPE B1B | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 60%.
BUILDING 1 WING B TYPE B1B: 33% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 12 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed6
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| IDEAL PROPERTIES | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RENDER POINT |
| Engineer | PARESH UNNARKAR |
| Partner | Role in project |
|---|---|
| RAJKUMAR RAMSHIROMANI VISHWAKARMA | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterCONSTRUCTION PERMISSION FOR THE THIRD FLOOR IS RECEIVED BY US RECENTLY (IN MARCH 2019), THEREFORE WE COULD NOT COMPLETE THE CONSTRUCTION IN TIME. HENCE WE NEED TO EXTEND THE TIME LIMIT FOR THE COMPLETION OF ENTIRE PROJECT TILL 31/03/2022. THE MARKET SITUATION OF REAL ESTATE IS VERY BAD AND THERE IS NO CUSTOMERS FOR THE SELLING OF FLATS & SHOPS OF OUR PROJECT.
Reason as filed by the promoterAs per RERA registration (Reg. No.-P99000016031) the aforesaid project should be completed on or before 31/07/2019 but we could not complete the construction work before this date. The Construction permission for Third & Fourth floors are issued by the authority recently and it will take more time to complete the rest of the construction of the building. Some flats and shops are not sold in market because of bad market condition in real estate sector. Our customers are totally depends on the housing loans and major housing finance companies are not working since long and not financing the loan
Reason as filed by the promoterCC FOR THE FOURTH FLOOR IS RECEIVED RECENTLY. THE CONSTRUCTION OF THE FORTH FLOOR IS GOING ON.
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000303591 | YOGESH ARUN PATKAR | SAI RAJ CONSTRUCTION | 06/12/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Apr 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Apr 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Apr 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed40
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold _ Booked Inventory-.pdf | 12 Apr 2024 |
| Declaration in FORM BFile: Form B Affidavit Cum Declaration by Promoter.pdf | 8 Apr 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200302197033_For_Debtor_Based_Search_28_03_2024_17_45_42_001.pdf | 8 Apr 2024 |
| CERSAI detailsFile: 1 Details of encumbrances-CERSAI DETAIL-UNDERTAKING.pdf | 8 Apr 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200302197033_For_Debtor_Based_Search_28_03_2024_17_45_42_001.pdf | 8 Apr 2024 |
| Certificates of CA (Form 3)File: Form No-3.pdf | 8 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account.pdf | 8 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: 1 Copy of the legal title report.pdf | 28 Mar 2024 |
| Details of encumbrances concerned to LegalFile: 1 Copy of the legal title report.pdf | 28 Mar 2024 |
| Declaration about Commencement CertificateFile: Comencement Certificate- Forth Floor.pdf | 28 Mar 2024 |
| Declaration about Commencement CertificateFile: Comencement Certificate- Forth Floor.pdf | 28 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-Disclsure-interest in other project.pdf | 28 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-Disclsure-interest in other project.pdf | 28 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-Disclsure-interest in other project.pdf | 28 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 - 17_18.pdf | 28 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - 18_19.pdf | 28 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - 19_20.pdf | 28 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - 20_21.pdf | 28 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 21_22.pdf | 28 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - 22_23.pdf | 28 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Render Point-Architect Certificate.pdf | 21 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No-2-Meshram and Thukral-Engg.pdf | 21 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A-Engineers Certificate for Quality Assurance.pdf | 21 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A-Engineers Certificate for Quality Assurance.pdf | 21 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A-Engineers Certificate for Quality Assurance.pdf | 21 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Disclosure of Sold _ Booked Inventory .pdf | 21 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold _ Booked Inventory .pdf | 21 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure-A-Disclsure-interest in other project.pdf | 21 Mar 2024 |
| Proforma of Agreement for saleFile: 1 Proforma of Allotment letter-Agreement for Sale.pdf | 21 Mar 2024 |
| PAN CardFile: PAN CARD.pdf | 11 Apr 2018 |
| Copy of the legal title reportFile: LEGAL AND TITLE CERTIFICATE.pdf | 11 Apr 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC1 (6 files merged).pdf | 11 Apr 2018 |
| Declaration in FORM BFile: form b.pdf | 11 Apr 2018 |
| Certificates of CA (Form 3)File: form 3 (2 files merged).pdf | 11 Apr 2018 |
| Proforma of Allotment letterFile: sample agreement.pdf | 11 Apr 2018 |
| Building plan approvalFile: plan approval.pdf | 10 Apr 2018 |
| Layout approvalFile: LAYOUT APPROVAL.pdf | 10 Apr 2018 |
| Details of encumbrancesFile: encumberance declaration.pdf | 10 Apr 2018 |
| Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL.pdf | 10 Apr 2018 |
| Building Plan Approval (IOD)File: plan approval.pdf | 10 Apr 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 40 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep BUILDING NO.1, IDEAL GARDEN, TYPE B1b, WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near UMROLI3,200+ in Palghar
Filed coordinates, straight-line distance. 74 registered projects within 2 km.
Veena Samrajya-Sector-VIII
Veena Developers
Prithvi Anand Kuber Complex Phase 2
Prithvi Anand Housing and Land Developers
INFINIA PHASE 1
URBAN LAND SOLUTIONS
AV SMART CITY PHASE 1
ADITYA REALTORS
PRITHVI ANAND KUBER COMPLEX
Prithvi Anand Housing and Land Developers
OSTWAL IMPERIAL
SHREE OSTWAL BUILDERS LTD
See every Palghar project, with the district possession charts
Builder: RAJKUMAR RAMSHIROMANI VISHWAKARMA
RAJKUMAR RAMSHIROMANI VISHWAKARMA has 1 registration on MahaRERA, including BUILDING NO.1, IDEAL GARDEN, TYPE B1b, WING B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What does it mean that BUILDING NO.1, IDEAL GARDEN, TYPE B1b, WING B shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if BUILDING NO.1, IDEAL GARDEN, TYPE B1b, WING B is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BUILDING NO.1, IDEAL GARDEN, TYPE B1b, WING B?
The registered promoter entity is RAJKUMAR RAMSHIROMANI VISHWAKARMA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BUILDING NO.1, IDEAL GARDEN, TYPE B1b, WING B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against BUILDING NO.1, IDEAL GARDEN, TYPE B1b, WING B?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for BUILDING NO.1, IDEAL GARDEN, TYPE B1b, WING B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BUILDING NO.1, IDEAL GARDEN, TYPE B1b, WING B?
The professionals named in the filing: Architect: RENDER POINT; Engineer: PARESH UNNARKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BUILDING NO.1, IDEAL GARDEN, TYPE B1b, WING B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback